MH-139 Rotor Brake

Closed Pre-Solicitation Posted

Solicitation number
MH139-CR05
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Wright Patterson AFB, Ohio, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Air Force Life Cycle Management Center (AFLCMC) is conducting market research through a Request for Information to identify sources capable of designing, integrating, and testing a rotor brake system for the MH-139A helicopter, with responses due by July 24, 2026. This RFI is for informational purposes only and does not constitute a solicitation or promise of future award; the Government will not reimburse response costs.

AFLCMC/WIH seeks to integrate a commercial baseline rotor brake system—derived from the Leonardo AW139 variant—to support safe and efficient ground operations, particularly in high-wind environments. The integration objective includes optimizing ground turn-around times, facilitating rapid refueling, reducing rotor system wear, and enhancing aircrew and support personnel safety. The modified system must be standardized across all MH-139A fleet configurations.

Key scope elements include procurement and installation of the commercial baseline rotor brake (referenced as P/N 3G6351F00113 per AW139 RFM Rev 27 Sup 1), standardized installation across all MH-139A configurations, technical support during initial implementation and testing, and subject matter expert support for a period following initial implementation and testing. Respondents should mark proprietary or competition-sensitive information clearly. The Government intends to use responses to develop its acquisition strategy, Statement of Work, and performance specifications.

Notice text

This Request for Information (RFI) is issued for informational and market research purposes only in accordance with Federal Acquisition Regulation (FAR) Part 10. It does not constitute a solicitation, a Request for Proposal (RFP), or a promise to issue an RFP in the future. The Government will not reimburse any company or individual for expenses associated with preparing or submitting information in response to this RFI. The information provided may be used by the U.S. Air Force in developing its acquisition strategy, Statement of Work (SOW), and performance specifications. Interested parties are responsible for adequately marking proprietary or competition-sensitive information.

BACKGROUND AND SCOPE

The Air Force Life Cycle Management Center (AFLCMC), MH-139A Program Office (AFLCMC/WIH), is conducting market research to identify sources capable of designing, integrating, and testing a rotor brake for the MH-139A.

The objective of this effort is to integrate a rotor brake system on the MH-139A to support safe and efficient ground operations, particularly in high-wind environments. The addition of a rotor brake capability will optimize ground turn-around times, facilitate rapid refueling operations, reduce rotor system wear, and enhance overall ground safety for aircrew and support personnel.

To meet this requirement, the Government intends to leverage the commercial baseline rotor brake system developed for the Leonardo AW139 (the commercial variant of the MH-139A).

Technical support is expected during the initial implementation and testing of the new configuration. Subject matter expert support is expected for a period after initial implementation and testing.

Key requirements for the modified system include:

  • Procurement & Installation: The objective is to procure and install the commercial baseline Rotor Brake (e.g., P/N 3G6351F00113 per AW139 RFM Rev 27 Sup 1).
  • Standardization: Installation must be standardized across all configurations of the MH-139A fleet.
  • Systems & Software Integration: The installation must safely interface with the aircraft's existing avionics, hydraulic systems, and engine controls. This includes all necessary software interlocks (e.g., within the Operational Flight Program [OFP], Crew Alerting System [CAS], and Full Authority Digital Engine Control [FADEC]) to prevent inadvertent engagement during flight or high-power ground operations.
  • Airworthiness & Structural Integrity: Follow all applicable Federal Aviation Administration (FAA) and MIL-HDBK-516C guidelines. The vendor must account for the added weight and vibration characteristics of the rotor brake assembly to ensure it does not negatively impact the fatigue life or structural limits of the transmission/main gearbox deck.
  • Support & Fit-Testing: Provide technical support during initial installation and testing. The Government will provide scheduled access at a Government-designated facility for fit-checks. The contractor must provide all hardware required for fit-checks. The Government will not provide any Furnished Equipment (GFE).
  • Certification & Airworthiness Pathway: Ability to deliver the complete engineering data package necessary to obtain an FAA-approved Supplemental Type Certificate (STC) and support a military Engineering Change Proposal (ECP).
  • Certification Experience: Describe your company's process, timeline, and prior experience in executing ECPs and obtaining FAA STCs for dynamic/drive system modifications on vertical lift aircraft.
  • Risk Mitigation: Identify potential engineering challenges (e.g., FADEC integration, dynamic load limits, hydraulic routing) associated with obtaining an FAA-approved STC and supporting a military ECP for this project, and provide recommended strategies to mitigate these risks.

INSTRUCTION TO POTENTIAL RESPONDENTS 

Respondents are encouraged to provide comprehensive responses that demonstrate existing technology, qualifications, and experience. Please structure your response to address the following sections: 

A. Company Information:

  • Company Name, Address, CAGE Code, and Website URL. 
  • Point of Contact (Name, Title, Phone, Email). 
  • Business Size Status under NAICS Code 336413 (Aircraft Manufacturing), with a size standard of 1,500 employees. Please self-certify for all applicable categories: 
  • Small Business (Yes/No) 
  • Woman-Owned Small Business (WOSB) (Yes/No) 
  • HUBZone Certified (Yes/No) 
  • Service-Disabled Veteran-Owned Small Business (SDVOSB) (Yes/No) 
  • Company Ownership (Domestic or Foreign-owned). 
  • Interest as Prime Contractor or Subcontractor. 

B. Technical Capability: 

  1. Provide a detailed description of your proposed solution(s). Include concept diagrams, illustrations, and preliminary specifications. 
  2. Describe the process for procuring, installing, and testing the rotor brake. Include estimated timelines for these phases, as well as expected lifecycle maintenance actions (repair intervals, consumables, life expectancy).
  3. State whether your company possesses the necessary technical data and proprietary rights for the MH-139A (based on the Leonardo AW139 platform) to perform this dynamic modification.
  4. Detail your company's experience with similar drive system/transmission modifications on vertical lift aircraft.
  5. Outline your approach to system integration. Explicitly detail how your solution addresses the required electrical, hydraulic, and software interlocks (OFP/CAS/FADEC) to ensure flight safety.
  6. Provide an impact analysis on how aircrew/maintenance training and training systems (e.g., flight simulators, maintenance trainers) will need to be updated to reflect the new rotor brake configuration, including a proposed timeline and associated risks.

C. Cost and Schedule:

  1. Provide a Rough Order of Magnitude (ROM) cost estimate broken down into two parts:
    • Non-Recurring Engineering (NRE): Design, systems integration (including software updates), fit-testing, and ECP/STC certification data package support, to include the engineering source data required for TCTO generation and Technical Order (TO) updates.
    • Modification Kit/Installation: The per-aircraft cost for the physical Modification Kit and field installation.
  2. Provide an estimated timeline from contract award to the development, testing, and initial operational capability of the first retrofitted aircraft.

Small Business Utilization:

  • For Small Businesses: Describe how you will comply with FAR 52.219-14, Limitations on Subcontracting, if the requirement is set-aside. 
  • For Large Businesses: Provide a realistic small business utilization target as a percentage of total contract value and explain your rationale. 

RESPONSES AND COMMUNICATIONS 

  • Responses shall not exceed 15 pages (single-sided, 12-point font). 
  • Submit responses electronically by 
  • Mark all proprietary information clearly. Unmarked information will be considered publicly releasable. Be advised that government-contracted support personnel may handle submissions under non-disclosure agreements. 
  • Prospective contractors must be registered in the System for Award Management (SAM) at https://www.sam.gov.

Similar open opportunities

Opportunity Agency Set-aside Responses due
Combined Request for Information and Synopsis (27-R-A942) United States · NAICS 336413 Aviation No set-aside
Reliability and maintainability (r&m) engineering support for helicopter United States · NAICS 541330 AFLCMC Robins AFB Competitive 8(a)
C-130 brake, multiple disk NSN: 1630015001903 NAICS 336413 Aviation No set-aside
Repair of the Attitude Heading Reference System (AHRS) Applicable to the TH-1H Helicopter NAICS 336413 Air Force Sustainment Center No set-aside
Aircraft Maintenance Fixture for KC-135 Spoiler Actuator Warner Robins, Georgia 31098, United States · NAICS 488190 Air Force Sustainment Center No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity