Medical Support Area Renovation-Building 1, (VA) Loma Linda, CA

Closed Solicitation Posted

Solicitation number
W912PL23B0007
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation from the Department of the Army Corps of Engineers Engineering District Los Angeles seeks construction services for a medical support area renovation project at Building 1 in Loma Linda, California. The project involves remodeling approximately 13,405 square feet of existing laundry, linen, sterile processing service, logistics, and environmental management system administrative space across three phases to accommodate new functions. Price will be the determining factor in the best value award, with proposals due by September 15, 2023.

The set-aside is for service-disabled veteran-owned small businesses. The project value is estimated between $5,000,000 to $10,000,000. Five offers were received ranging from $5,885,447 to $7,679,999 with Sapper West Inc. as the apparent low offeror. The renovation will remodel existing spaces to support laundry, linen, logistics, environmental management system and medical media areas, as well as a nutrition cart wash and conference room, with work to be completed at the Department of Veterans Affairs Medical Center campus in Loma Linda, California.

Notice text

7 versions

Update #7 · Latest ·

Amendment 0004, Period of Performance extension- Updated SF 1442, Updated section 00 73 00. This project includes the remodeling of 13,405 square feet of existing Laundry, Linen, Sterile Processing Service (SPS), Logistics and Environmental Management System (EMS) admin space to accommodate newly constructed Laundry, Linen, Logistics, EMS admin, Medical Media and Nutrition Cart wash area.-Phase 1: Remodel the existing SPS department area to accommodate the Nutrition cart wash, a portion of Medical Media, and a portion of Logistics.-Phase 2: Remodel the existing Logistics Supply Room 1C-26 and admin area north of Logistics to accommodate Linen, as well as the existing admin and Logistics functions. The Sterile storage area in this phase will need to be temporarily relocated during this phase in order to maintain continuous service. -Phase 3: Remodel the existing Linen Room IC-28 to accommodate Open Office Space and Storage. Laundry Room IF-19 will be remodeled to accommodate a Conference Room that can be subdivided into two rooms with an acoustical mobile partition. The magnitude of this construction project is between $5,000,000 and $10,000,000.

Update #6 ·

Posting Site Visit attendance list - Amendment 0003, Summary of changes, Updated Bid response date with updated bidder submission instructions, updated SF 1442, section revisions and amended drawings included. This project includes the remodeling of 13,405 square feet of existing Laundry, Linen, Sterile Processing Service (SPS), Logistics and Environmental Management System (EMS) admin space to accommodate newly constructed Laundry, Linen, Logistics, EMS admin, Medical Media and Nutrition Cart wash area.-Phase 1: Remodel the existing SPS department area to accommodate the Nutrition cart wash, a portion of Medical Media, and a portion of Logistics.-Phase 2: Remodel the existing Logistics Supply Room 1C-26 and admin area north of Logistics to accommodate Linen, as well as the existing admin and Logistics functions. The Sterile storage area in this phase will need to be temporarily relocated during this phase in order to maintain continuous service. -Phase 3: Remodel the existing Linen Room IC-28 to accommodate Open Office Space and Storage. Laundry Room IF-19 will be remodeled to accommodate a Conference Room that can be subdivided into two rooms with an acoustical mobile partition. The magnitude of this construction project is between $5,000,000 and $10,000,000.

Update #5 ·

CORRECT ERROR IN SAM.GOV REGARDING RESPONSE TIME- Amendment 0003, Summary of changes, Updated Bid response date with updated bidder submission instructions, updated SF 1442, section revisions and amended drawings included. This project includes the remodeling of 13,405 square feet of existing Laundry, Linen, Sterile Processing Service (SPS), Logistics and Environmental Management System (EMS) admin space to accommodate newly constructed Laundry, Linen, Logistics, EMS admin, Medical Media and Nutrition Cart wash area.-Phase 1: Remodel the existing SPS department area to accommodate the Nutrition cart wash, a portion of Medical Media, and a portion of Logistics.-Phase 2: Remodel the existing Logistics Supply Room 1C-26 and admin area north of Logistics to accommodate Linen, as well as the existing admin and Logistics functions. The Sterile storage area in this phase will need to be temporarily relocated during this phase in order to maintain continuous service. -Phase 3: Remodel the existing Linen Room IC-28 to accommodate Open Office Space and Storage. Laundry Room IF-19 will be remodeled to accommodate a Conference Room that can be subdivided into two rooms with an acoustical mobile partition. The magnitude of this construction project is between $5,000,000 and $10,000,000.

Update #4 ·

Amendment 0003, Summary of changes, Updated Bid response date with updated bidder submission instructions, updated SF 1442, section revisions and amended drawings included. This project includes the remodeling of 13,405 square feet of existing Laundry, Linen, Sterile Processing Service (SPS), Logistics and Environmental Management System (EMS) admin space to accommodate newly constructed Laundry, Linen, Logistics, EMS admin, Medical Media and Nutrition Cart wash area.-Phase 1: Remodel the existing SPS department area to accommodate the Nutrition cart wash, a portion of Medical Media, and a portion of Logistics.-Phase 2: Remodel the existing Logistics Supply Room 1C-26 and admin area north of Logistics to accommodate Linen, as well as the existing admin and Logistics functions. The Sterile storage area in this phase will need to be temporarily relocated during this phase in order to maintain continuous service. -Phase 3: Remodel the existing Linen Room IC-28 to accommodate Open Office Space and Storage. Laundry Room IF-19 will be remodeled to accommodate a Conference Room that can be subdivided into two rooms with an acoustical mobile partition. The magnitude of this construction project is between $5,000,000 and $10,000,000.

Update #3 ·

Amendment 0002, Summary of changes, and FIO documents (Lead and Asbestos Survey and Loma Linda Partial FP asbuilts) included. This project includes the remodeling of 13,405 square feet of existing Laundry, Linen, Sterile Processing Service (SPS), Logistics and Environmental Management System (EMS) admin space to accommodate newly constructed Laundry, Linen, Logistics, EMS admin, Medical Media and Nutrition Cart wash area.-Phase 1: Remodel the existing SPS department area to accommodate the Nutrition cart wash, a portion of Medical Media, and a portion of Logistics.-Phase 2: Remodel the existing Logistics Supply Room 1C-26 and admin area north of Logistics to accommodate Linen, as well as the existing admin and Logistics functions. The Sterile storage area in this phase will need to be temporarily relocated during this phase in order to maintain continuous service. -Phase 3: Remodel the existing Linen Room IC-28 to accommodate Open Office Space and Storage. Laundry Room IF-19 will be remodeled to accommodate a Conference Room that can be subdivided into two rooms with an acoustical mobile partition. The magnitude of this construction project is between $5,000,000 and $10,000,000.

Update #2 ·

Amendment 0001 and Site Visit itinerary included.This project includes the remodeling of 13,405 square feet of existing Laundry, Linen, Sterile Processing Service (SPS), Logistics and Environmental Management System (EMS) admin space to accommodate newly constructed Laundry, Linen, Logistics, EMS admin, Medical Media and Nutrition Cart wash area.-Phase 1: Remodel the existing SPS department area to accommodate the Nutrition cart wash, a portion of Medical Media, and a portion of Logistics.-Phase 2: Remodel the existing Logistics Supply Room 1C-26 and admin area north of Logistics to accommodate Linen, as well as the existing admin and Logistics functions. The Sterile storage area in this phase will need to be temporarily relocated during this phase in order to maintain continuous service. -Phase 3: Remodel the existing Linen Room IC-28 to accommodate Open Office Space and Storage. Laundry Room IF-19 will be remodeled to accommodate a Conference Room that can be subdivided into two rooms with an acoustical mobile partition. The magnitude of this construction project is between $5,000,000 and $10,000,000.

Update #1 ·

This project includes the remodeling of 13,405 square feet of existing Laundry, Linen, Sterile Processing Service (SPS), Logistics and Environmental Management System (EMS) admin space to accommodate newly constructed Laundry, Linen, Logistics, EMS admin, Medical Media and Nutrition Cart wash area.-Phase 1: Remodel the existing SPS department area to accommodate the Nutrition cart wash, a portion of Medical Media, and a portion of Logistics.-Phase 2: Remodel the existing Logistics Supply Room 1C-26 and admin area north of Logistics to accommodate Linen, as well as the existing admin and Logistics functions. The Sterile storage area in this phase will need to be temporarily relocated during this phase in order to maintain continuous service.-Phase 3: Remodel the existing Linen Room IC-28 to accommodate Open Office Space and Storage. Laundry Room IF-19 will be remodeled to accommodate a Conference Room that can be subdivided into two rooms with an acoustical mobile partition.The magnitude of this construction project is between $5,000,000 and $10,000,000.

Files

File Type Posted
C.04 Bid Abstract_W912PL23B0007_Loma Linda.pdf PDF

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
NOI- Brand Name or Equal- Andover HVAC Controls Special Notice
Medical Support Area Renovation-Building 1, (VA) Loma Linda, CA Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
605-341 - Relocate Dialysis Minor Construct - Loma Linda, CA Loma Linda, California 92357, United States · NAICS 236220 VA Technology Acquisition Center No set-aside
Amendment 0002 Y1DZ--36C261-28-AP-0022 | 612-27-1-6009-0001 | Construct Modular Imaging Center in Stockton | 612A4-CSI-002 French Camp, California 95231, United States · NAICS 236220 Veterans Integrated Service Network 21 Service-Disabled Veteran-Owned Small Business
Z1DA--36C25227B0026 Remodel ENT Procedure Rooms CON 537-19-109 Jesse Brown VA Medical Center 820 South Damen Avenue Chicago, Illinois 60612, United States · NAICS 236220 Veterans Integrated Service Network 12 Service-Disabled Veteran-Owned Small Business
Y1DA--NRM-CONST 528-CSI-102 Urology Equipment Site Prep | FY27 NRM Buffalo, New York 14215, United States · NAICS 236220 Veterans Integrated Service Network 2 Service-Disabled Veteran-Owned Small Business
VA Canandaigua Phase III Presolicitation Notice 400 Fort Hill AveCanandaigua, NY 14424 14424 · NAICS 236220 ENDIST Buffalo No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors