Notice text
DoD SBIR topic A17-127
Component: ARMY
Command: ATEC
Phase: SBIR Program Phase I Action
Technology Areas: Air Platform
Keywords: Airdrop; parachute; measurement; paratrooper; aerodynamic decelerator; instrumentation; textile strain; fabric strain; personnel parachute
Objective:
To design and build a system that measures the strain of or the force transferred through the parachute riser fabric throughout a paratrooper jump.
Description:
Currently, a load cell is utilized to measure the forces seen by personnel parachute risers from aircraft exit to ground impact. To install the load cell, the risers of the parachute is specially modified by the manufacture to accept the load cell in line with the riser. This modifying of the riser increases the risk to the paratrooper because of a non-standard design, increases program scheduled due to the time to design/manufacture/install the modified riser, and increases program costs to implement the modified riser.
To address these limitations, a new methodology for recording the forces transferred through the risers, without modifying the personnel static line and free fall parachute systems, is required.
The solution will need to interface with the riser of personnel parachutes (static line and free fall), survive the airdrop environment, have an effective operational range of 300 pound (lb.) to 10,000 lb. of loading, calibrated utilizing standard calibration equipment, supports reduced operational ranges through calibration (typically 300 lb. to 7500 lb.), can support data collection at 14 bit threshold (T) or 16 bit resolution objective (O) in the 300 lb. to 7500 lb. calibration range, withstand forces up to 30,000 lb., and operate with the standard data recorders used with load cells (if required by the solution) (T) or have an onboard self-contained data recorder (objective.) The solution must be compatible with T-11, RA-1, and MC-6 personnel parachute systems; for live jump and cargo airdrop. The solution will be no bigger than 3 inch (in) wide, 3 in tall, and 1 in deep; tall is orientated along the riser and deep through the riser. The solution will weigh no more than 0.5 lb. threshold, 0.2 lb. objective. The solution supports producing data in pounds forces over time at a sample rate of 2000 Hz or greater.
The primary event that the system will collect data on is parachute opening shock. For personnel systems this event will occur over one second, with the primary peak of the event occurring over a period of <20ms. For personnel system weighing 400 lb., the sensor will transition from 0 lb. for, to the peak opening shock of 15g’s, to a suspended weight of 350 lb. over the period of one second. The system shall be able to support collection of opening shock data in this dynamic environment.
The airdrop environment for the system to operate will be from a maximum aircraft exit altitude of 35,000 ft. MSL to a minimum 0 ft. MSL. The system shall be operational in the Hot and Basic (A1, A2, A3, B1, B2, B3, and C1) climatic design environments listed in MIL-STD-810G. Any equipment placed on the load or parachute will be able to withstand the parachute opening, flight, and ground impact. Additionally, any equipment place on the aircraft, airdrop load, or parachute should not present a safety hazard to personnel on the aircraft or the ground and should be able to be certified for use on U.S. Air Force cargo aircraft. Also, the implementation of the system should not impact the system performance that is under measurement. The measurement system might be susceptible to electrostatic energy induced in the canopy fabric during inflation and descent. Therefore, steps should be taken to mitigate any electrostatic discharge or EMI induced failures in the system.
Phase I:
Perform a feasibility study in support of the development of a system that can be installed in a non-intrusive manner on the risers of static line and free fall personnel parachute and record the forces seen on risers during deployment and flight until ground impact. Conduct an assessment of innovative technologies which may be utilized to build, integrate, and test a system to meet the challenges listed above. Perform a trade-off analysis to determine the best approach for a system and develop a preliminary design.
Phase II:
Develop a prototype system to install on a riser of a static line and free fall personnel parachute without modifying the parachute system and demonstrate ability to record forces seen on riser during parachute deployment and flight. Demonstrate the system technology in a real-world airdrop and characterize its performance.
Phase III:
The system developed under this topic could be developed into a standard set of instrumentation to support airdrop and aviation testing, such as fabric stress during parachute deployment. Expectation is that government and civilian parachute program office, design centers, and manufactures would procure these systems to support their test operations. Outside of the parachute industry, this could be adapted and marketed to government agencies and companies that require/manufacture seatbelts, 5-point harness or any other fabric safety device.
Files
| File | Type | Posted |
|---|---|---|
| A17-127.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity