MATOC Contractors Only - Repair for Covington Emergency Levee Amendment 0003
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912QR50146144
- Agency
-
ENDIST Louisville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Covington, Kentucky, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Louisville District is seeking design and construction services for the Covington Emergency Levee repair project through a restricted Multiple Award Task Order Contract (MATOC) solicitation. The project involves slope stabilization and outlet pipe repair, specifically designing a 150-foot slope stabilization and replacing the Gatewell 16 outlet pipe with a 30" Solid Wall High Density Polyethylene pipe, including a headwall, flap gate, and riprap erosion protection. Only pre-selected MATOC contractors holding specific contract numbers (W912QR21D0056 through W912QR21D0060, W912QR21D0085, and W912QR21D0086) are eligible to submit proposals. Proposals must be submitted by March 10, 2025, at 1:00 PM Eastern Time, with a required 60-day proposal validity period. Evaluation will be based on the lowest evaluated price, and contractors must submit a Price Breakout Schedule demonstrating use of binding MATOC contract rates.
The project will be located in Covington, Kentucky, with an estimated cost range between $1-5 million and a total performance period of 312 days. There are no specific set-aside designations for this procurement. Key personnel requirements include a Construction Project Manager with 10 years of experience and a qualified Site Safety and Health Officer. Contractors must be registered in SAM.gov and will need to provide Payment and Performance bonds. The project timeline includes several critical design submission milestones, such as a Design Quality Control Plan due 14 days after Notice to Proceed, a Design Kickoff Meeting at 30 days, a 65% design package due at 100 days, and a 100% design package due at 145 days. Technical questions must be submitted through ProjNet using the specific bidder inquiry key E8HTTD-5Q5AW3.
Notice text
4 versions
Update #4 · Latest ·
MATOC Pool W912QR21D0056, W912QR21D0057, W912QR21D0058, W912QR21D0059, W912QR21D0060, W912QR21D0085, and W912QR21D0086.
Amendment 0001 19 February 2025 - Please see attached.
Amendment 0002 25 February 2025 - Please see attached.
Amendment 0003 4 March 2025 - Please see attached.
Update #3 ·
MATOC Pool W912QR21D0056, W912QR21D0057, W912QR21D0058, W912QR21D0059, W912QR21D0060, W912QR21D0085, and W912QR21D0086.
Amendment 0001 19 February 2025 - Please see attached.
Amendment 0002 25 February 2025 - Please see attached.
Update #2 ·
MATOC Pool W912QR21D0056, W912QR21D0057, W912QR21D0058, W912QR21D0059, W912QR21D0060, W912QR21D0085, and W912QR21D0086.
Amendment 0001 19 February 2025 - Please see attached.
Update #1 ·
MATOC Pool W912QR21D0056, W912QR21D0057, W912QR21D0058, W912QR21D0059, W912QR21D0060, W912QR21D0085, and W912QR21D0086.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| MATOC Contractors Only - Repair for Covington Emergency Levee | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity