Marine Corps Support Facility- Blount Island, Concrete Sill Removal, Duval County, Florida

Award Notice Posted

Solicitation number
W912EP19R0005
Agency
Awarded
to Manson Construction Co
Set-aside
No set-aside

Opportunity facts

Contract number
W912EP19C0030 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Awarded Vendors: Manson Construction Co.. Contract Award Dollar Amount: $31,907,280.00. Contract Award Date: 2019-09-19.

Update #3 ·

A Pre-Proposal Conference will be held on THURSDAY, 18 JULY 2019 FROM 10:00AM - 11:00AM. The call-in number is: 877-402-9753, the ACCESS CODE is: 6546236, and the SECURITY CODE is: 2873. It is requested that an email be sent to william.j.wallace@usace.army.mil to confirm attendance by your organization.


DESCRIPTION OF WORK:
The work of the removal of a submerged concrete sill located at the US Marine Corps Support Facility - Blount Island (MCSF-BI). The sill is heavily reinforced with rebar. The sill is located at station 7+00 in the MCSF-BI slipway and is 32.6 feet wide by 426.5 feet long and approximately 14.5 feet deep. The concrete sill was constructed on top of rock at approximately -52 feet Mean Lower Low Water (MLLW). The crest elevation of the concrete sill is -37.6 feet MLLW. A substantial portion of the concrete sill is to be removed (9.4 feet) resulting in a maximum crest elevation of -47 feet MLLW. Sediments may need to be cleared around the concrete sill to allow access to the structure, and this material may be disposed in the Dayson Island (D/A-D) Dredge Material Placement Facility (DMPF) which is approximately 2.7 miles from the concrete sill location or in another manner in accordance with Section 35 20 23 DREDGING. All concrete and reinforcement bars from the sill and any insitu rock removed from the slipway shall be disposed of at on off-site location and shall not be placed into D/A-D. Safe navigation in and out of MCSF-BI shall be maintained throughout removal of the concrete sill operations. The Contractor shall use a diamond wire saw to cut out the submerged concrete sill. Blasting is prohibited.
The anticipated Period of Performance is 285 calendar days from issuance of Notice to Proceed.
PROPOSAL REQUIREMENTS:
The Invitation for Bid (IFB) will be issued on or about 1 July 2019 and bids will be due on or about 15 August 2019.


NAICS Code 237990, size standard $27.5 million.
Magnitude of construction is between $23,000,000.00 and $32,000,000.00.
THIS IS AN UNRESTRICTED ACQUISITION. ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE.
The IFB will be issued in electronic format only and will be posted on the Federal Business Opportunities website (Fed Biz Opps) at https://www.fbo.gov. In order to receive notification of any issued amendments, interested parties must register as an interested vendor on the Federal Business Opportunities website at http://www.fedbizopps.gov/. Please be advised, if you are not registered, the Government is not responsible for providing you with notification to any changes to this solicitation. You must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call 866-606-8220 or visit the SAM website at https://www.sam.gov/.


.

Update #2 ·

A Pre-Proposal Conference will be held on THURSDAY, 18 JULY 2019 FROM 10:00AM - 11:00AM. The call-in number is: 877-402-9753, the ACCESS CODE is: 6546236, and the SECURITY CODE is: 2873. It is requested that an email be sent to william.j.wallace@usace.army.mil to confirm attendance by your organization.


DESCRIPTION OF WORK:
The work of the removal of a submerged concrete sill located at the US Marine Corps Support Facility - Blount Island (MCSF-BI). The sill is heavily reinforced with rebar. The sill is located at station 7+00 in the MCSF-BI slipway and is 32.6 feet wide by 426.5 feet long and approximately 14.5 feet deep. The concrete sill was constructed on top of rock at approximately -52 feet Mean Lower Low Water (MLLW). The crest elevation of the concrete sill is -37.6 feet MLLW. A substantial portion of the concrete sill is to be removed (9.4 feet) resulting in a maximum crest elevation of -47 feet MLLW. Sediments may need to be cleared around the concrete sill to allow access to the structure, and this material may be disposed in the Dayson Island (D/A-D) Dredge Material Placement Facility (DMPF) which is approximately 2.7 miles from the concrete sill location or in another manner in accordance with Section 35 20 23 DREDGING. All concrete and reinforcement bars from the sill and any insitu rock removed from the slipway shall be disposed of at on off-site location and shall not be placed into D/A-D. Safe navigation in and out of MCSF-BI shall be maintained throughout removal of the concrete sill operations. The Contractor shall use a diamond wire saw to cut out the submerged concrete sill. Blasting is prohibited.
The anticipated Period of Performance is 285 calendar days from issuance of Notice to Proceed.
PROPOSAL REQUIREMENTS:
The Invitation for Bid (IFB) will be issued on or about 1 July 2019 and bids will be due on or about 15 August 2019.


NAICS Code 237990, size standard $27.5 million.
Magnitude of construction is between $17,000,000.00 and $23,000,000.00.
THIS IS AN UNRESTRICTED ACQUISITION. ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE.
The IFB will be issued in electronic format only and will be posted on the Federal Business Opportunities website (Fed Biz Opps) at https://www.fbo.gov. In order to receive notification of any issued amendments, interested parties must register as an interested vendor on the Federal Business Opportunities website at http://www.fedbizopps.gov/. Please be advised, if you are not registered, the Government is not responsible for providing you with notification to any changes to this solicitation. You must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call 866-606-8220 or visit the SAM website at https://www.sam.gov/.


.

Update #1 ·

A Pre-Proposal Conference will be held on THURSDAY, 18 JULY 2019 FROM 10:00AM - 11:00AM. The call-in number is: 877-402-9753, the ACCESS CODE is: 6546236, and the SECURITY CODE is: 2873. It is requested that an email be sent to william.j.wallace@usace.army.mil to confirm attendance by your organization.


DESCRIPTION OF WORK:
The work of the removal of a submerged concrete sill located at the US Marine Corps Support Facility - Blount Island (MCSF-BI). The sill is heavily reinforced with rebar. The sill is located at station 7+00 in the MCSF-BI slipway and is 32.6 feet wide by 426.5 feet long and approximately 14.5 feet deep. The concrete sill was constructed on top of rock at approximately -52 feet Mean Lower Low Water (MLLW). The crest elevation of the concrete sill is -37.6 feet MLLW. A substantial portion of the concrete sill is to be removed (9.4 feet) resulting in a maximum crest elevation of -47 feet MLLW. Sediments may need to be cleared around the concrete sill to allow access to the structure, and this material may be disposed in the Dayson Island (D/A-D) Dredge Material Placement Facility (DMPF) which is approximately 2.7 miles from the concrete sill location or in another manner in accordance with Section 35 20 23 DREDGING. All concrete and reinforcement bars from the sill and any insitu rock removed from the slipway shall be disposed of at on off-site location and shall not be placed into D/A-D. Safe navigation in and out of MCSF-BI shall be maintained throughout removal of the concrete sill operations. The Contractor shall use a diamond wire saw to cut out the submerged concrete sill. Blasting is prohibited.
The anticipated Period of Performance is 285 calendar days from issuance of Notice to Proceed.
PROPOSAL REQUIREMENTS:
The Invitation for Bid (IFB) will be issued on or about 1 July 2019 and bids will be due on or about 15 August 2019.


NAICS Code 237990, size standard $27.5 million.
Magnitude of construction is between $15,000,000.00 and $25,000,000.00.
THIS IS AN UNRESTRICTED ACQUISITION. ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE.
The IFB will be issued in electronic format only and will be posted on the Federal Business Opportunities website (Fed Biz Opps) at https://www.fbo.gov. In order to receive notification of any issued amendments, interested parties must register as an interested vendor on the Federal Business Opportunities website at http://www.fedbizopps.gov/. Please be advised, if you are not registered, the Government is not responsible for providing you with notification to any changes to this solicitation. You must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call 866-606-8220 or visit the SAM website at https://www.sam.gov/.


.

Files

File Type Posted
19-196_survey.zip ZIP file
SF30_Amend0003_5Aug19.pdf PDF
Sample_MMC-12_Ship_Schedule_2019-2020.pdf PDF
SF30_Amend0002.pdf PDF
Sill_Final_1_of_3.pdf PDF
Dayson_Island_Weir_plans_2007_MD.PDF PDF
Amendment_1.pdf PDF
Sample_Ship_Schedule_for_Advertisement.xlsx XLSX spreadsheet
BW_PDF0122-02.pdf PDF
Sill_Final_2_of_3.pdf PDF
Pages_from_Dike,_Graving_Dock_(5A)_NEW-2.pdf PDF
5A-4-0152C.PDF PDF
5A-4-0130E.PDF PDF
Sill_Final_3_of_3.pdf PDF
BW_PDF0122-01.pdf PDF
19R0005Volume2Specs.pdf PDF
BI_MCT_GDR_FY19_sill_-_final.pdf PDF
Plans_MCSF-BI_Sill_Removal_20190606.pdf PDF
19-073_Survey.zip ZIP file
19R0005Volume1Specs.pdf PDF
Show all 20

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors