Maintenance on Catepillar Combined Heat and Power Generator Set
Award Notice Posted
- Solicitation number
- VA24916Q0900
- Agency
-
Veterans Integrated Service Network 9
Veterans Health Administration, Department of Veterans Affairs
- Awarded
- to Thompson Machinery Commerce Corporation
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- VA24917C0025 Federal contract award
- NAICS code
- 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
- PSC
- Not on record
- Place of performance
- 3400 Lebanon Pike Murfreesboro TN 37129 USA
Notice details come from SAM.gov. Updated .
Notice text
Statement of Work
Combined Heat and Power (CHP) Generator Set Service Contract
Alvin C. York VAMC
Murfreesboro, TN
PART I: GENERAL
A. Introduction
This requirement is to provide full service maintenance and rebuild contract on the Caterpillar G3520C Generator Set and associated radiator system located in Bldg. 16 at the TVHS, Alvin C. York VA Medical Center, 3400 Lebanon Pike Murfreesboro Tennessee, 37129.
B. Background
The Caterpillar G3520C, Serial # GZL00146 Generator set is a natural gas fueled engine that has very strict maintenance requirements for continuous and reliable operation. The intent of the generator set is to provide primary power and steam to the facility and reduce the cost of utilities. The equipment is still under manufacturer's warranty through August of 2017 and requires maintenance at specified intervals to ensure proper operating characteristics as well as continuation of the manufacturer's warranty. Maintenance is of utmost importance for reduced operational cost and to the longevity of the generators life expectancy.
C. Scope of work
The contractor is to provide manufacturer's authorized/certified service technicians, transportation, equipment, maintenance parts, materials, specialty tools and supervision to provide the manufacturer's required maintenance services to ensure proper and continuous operation of the Caterpillar G3520C generator set, radiator system and auxiliary systems connected to the engine. Daily checks will be performed by VA boiler plant employees. This maintenance contract is to include all items required to be checked, inspected, measured, tested or replaced at defined intervals in the manufacturer's service manual, SEBU7681-16 dated November 2010 and will include any manufacturer's updated requirements. This contract will include battery replacement on or before 3 year installation anniversaries, interior and exterior cleaning and servicing of the radiator system to include belt and hose replacement at/or before 5 year recommended intervals, fluid level indicators and fluid replacement as needed at 1000 service hours intervals. The contractor is to provide all parts, materials and labor for 2 (two) standard top end overhauls, 10,000-20,000 service hours and 1(one) in-frame overhaul 22,000-40,000 service hours during the 5 year period of this service contract. Parts found during the overhauls considered to be defective or worn that are not included in the standard overhaul procedures will be covered for under a repair purchase order and are not the contractor's financial responsibility to replace under this agreement. The contractor will provide a list of parts the manufacturer requires to be replaced under the overhauls for clarification of the requirements.
D. Period of Performance
The base year period of performance for this requirement is from November 1 2016 through October 31 2017. Succeeding years will be from November 1 through October 31.
E. Scheduling
The Contractor will perform the generator set maintenance work during normal hours. Hours of work shall be from 8:00 am to 4:30 pm, Monday through Friday, excluding federal holidays. The Contractor is required to schedule the equipment shut down for maintenance with the COR and check in with the COR or alternate COR prior to starting any maintenance on the generator set. This contract does not include any requirements for emergency call backs or overtime hours.
PART II: REQUIREMENTS
" The contractor shall identify which employees will be working under the awarded contract. Contractor personnel shall include employees, sub-contractors, subcontractor employees, suppliers and delivery personnel.
" The contractor will provide proof of manufacturer's authorized service technicians qualifications and certifications to the CO and COR prior to contract award.
" The Contractor will be required to maintain communications at least one time per week with the Boiler Plant Operators, 615-225-3984, to keep track of the generator set operational hours and any changes in operations of the generator set that will affect scheduled maintenance service hours intervals. The VA will inform the contractor when the generator set is placed back into normal operation and the need for maintenance intervals to continue.
" The Contractor is required to check in with the the COR prior to starting any maintenance on the generator set. The Contractor is to provide diagnostic services as needed between services resulting from equipment failures and/or ECM alarms relating to the generator, engine, auxiliary systems associated with the engine and the radiator system. Repair work will be covered under individual purchase orders as needed.
" Parking will be arranged for contractor service vehicles adjacent to the CHP plant.
" The contractor will provide paper or electronic service tickets to the COR, indicating services provided to the generator set as well as any recommended repairs not covered under the service contract or warranty. The contractor is to maintain records of all items replaced, mechanical measurements conducted and fluid test results required by the manufacturer and provide those records to the COR at the end of each contractual period.
" The contractor is responsible for safe and proper handling of all associated parts, materials and fluids, new and replaced. Waste parts, materials and fluids shall be removed from the VA and disposed of in accordance with the appropriate codes and standards.
" The following items are the required service hour intervals and required maintenance as specified in the maintenance manual SEBU7681-16 dated November 2010:
Maintenance Interval Schedule
(G3500C Standard)
SMCS Code: 1000; 4450; 7500
S/N: GZL1-Up
When Required
Battery - Recycle/Replace
Battery or Battery Cable - Disconnect
Cooling System Coolant Sample (Level 2) Obtain and test.
Engine Air Cleaner Element-Replace
Fuel Metering Valve - Check
Generator - Dry
Generator Lead - Check
Generator Set - Test
When Required cont.
Generator Set Alignment - Check
Insulation - Test
Overhaul Considerations
Space Heater - Check
Stator Winding Temperature - Measure/Record
Throttle Control Valve - Check
Radiator Belts and Hoses - Inspect/Replace
Every 250 Service Hours
Battery Electrolyte Level - Check
Cooling System Coolant Sample (Level 1) - Obtain and test
Cooling System Supplemental Coolant Additive (SCA) - TesVAdd
Engine Oil Samples - Obtain and test
Fumes Disposal Filter - Drain
Every 1000 Service Hours
Aftercooler Condensation - Drain
Alternator - inspect
Belts - inspect/adjust/replace
Crankcase Pressure - Measure
Crankshaft Vibration Damper - inspect
Engine Crankcase Breather - Clean
Engine Oil and Oil Filter - Change
Engine Speed/Timing Sensor - Clean/lnspect
Engine Valve Lash and Bridge - Adjust
Flexible Coupling - Inspect
Gas Pressure Regulator Condensation - Drain
Hoses and Clamps - inspect/replace
Inlet Air System - inspect
Radiator - Clean
Radiator Belts and Hoses - Inspect/adjust or replace
Valve Stem Projection - Measure/Record
Water Pump - inspect
Every 2000 Service Hours
Carburetor Air/Fuel Ratio - Check/Adjust
Compressor Bypass - Check
Generator - lnspect
Generator Bearing - Lubricate
Generator Set Vibration - lnspect
Stator Lead - Check
Annually
Cooling System Coolant Sample (Level 2) - Obtain
Every 3000 Service Hours
Ignition System Spark Plugs - Replace
Every 4000 Service Hours
Crankcase Blowby - Measure/Record
Cylinder Pressure - Measure/Record
Engine Mounts - Inspect
Engine Protective Devices - Checks
Ignition System Timing - Check/Adjust
Starting Motor - lnspect
Every 8000 Service Hours
Fumes Disposal Filter Element - Replace
Rotating Rectifier - Check
Turbocharger - Inspect
Varistor - Test
\/\/ater Temperature Regulator - Replace
Winding - Test
Between 10 000 and 20 000 Service Hours
Oil Temperature Regulators - Replace
Overhaul (Top End)
Every 10 000 Service Hours
Generator Bearing - Inspect
Catalytic converter - Remove catalytic module (s), inspect for signs of plugging of the honeycomb or damage to the honeycomb module (s), vacuum module (s) to remove any loose debris/ash. If modules show no sign of plugging or damage reinstall for continued use. If plugging or damage is detected inform the COR replacement units will be required.
Between 22 000 and 40 000 Service Hours
Crankshaft Vibration Damper - lnspect
Overhaul (In-Frame)
Every 24 000 Service Hours or 3 Years
Cooling System Coolant (NGEC) - Change
Between 45 000 and 80 000 Service Hours
Crankshaft Vibration Damper - lnspect
Overhaul (Major) - time frame beyond the scope of this contract
Warranty
All work, materials, and equipment provided with this work shall be warranted against defects in material and workmanship for a period of one (1) year or between service hours intervals from date of acceptance unless otherwise noted.
Files
| File | Type | Posted |
|---|---|---|
| VA249-16-Q-0900-000.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity