Maintenance Dredging of Jones Inlet, NY Federal Navigation Project

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
W912DS22S0026
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
Not on record
PSC
Not on record

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice is from the Department of the Army Corps of Engineers, New York District, seeking maintenance dredging of approximately 750,000 cubic yards of sand from the Jones Inlet Federal Navigation Project in New York. The dredged material will be placed along the Point Lookout, NY beach shoreline according to plans and specifications. Contractors must be able to commence work within 5 days of notice and maintain a production rate of 12,000 cubic yards per day. The deadline for questions is March 24, 2022. Contractors will be evaluated on their experience with similar dredging and beach placement projects, owned equipment suitable for the work, safety record, and ability to meet production and reporting requirements.

There is no set-aside designation for this procurement. The estimated value of construction costs ranges from $10-25 million. Approximately 750,000 cubic yards of sand must be dredged and placed along the beach by fall/winter 2022-2023 utilizing a hydraulic dredge and related equipment over an estimated period of 2-3 months to maintain the required production rate.

Notice text

The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of Jones Inlet, New York Federal Navigation Project. The sand would be dredged from the Inlet and subsequently placed along the Point Lookout, NY Beach shoreline per the plans and specifications. The proposed maintenance dredging would remove approximately 750,000 cubic yards of sand from the Jones Inlet Channel and Deposition Basins, subject to availability of funds. Dredging would be required to a depth of -14 feet Mean Lower Low Water (MLLW) plus 2 feet allowable overdepth. The dredged material is greater than 97% sand.

The proposed work is anticipated to be performed by utilizing a hydraulic dredge. Additionally, barges, tugboats, pipeline and land-based equipment such as dozers, will be needed to perform the work during the dredging and placement activities. The dredging and placement along the shoreline would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located.

Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt by him of the Notice To Proceed (NTP), and maintain an integrated production rate of at least 12,000 cubic yards per calendar day for the dredging and placement of the dredged sand. The presence of dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact.

The proposed work is anticipated to take place in the fall/winter of 2022/2023. The magnitude of construction is estimated to cost between $10,000,000.00 and $25,000,000.00.

SURVEY OF THE DREDGING INDUSTRY

The following confidential survey questionnaire is designed to apprise the Corps of prospective dredging contractors’ project execution capabilities. Please provide your response to the following questions. All questions are in regard to the maintenance dredging of Jones Inlet Federal Navigation Project with placement of the dredged sand at Point Lookout Beach shoreline.

General

  1. Have you ever worked on dredging jobs similar in nature to this project? If so, please describe the project and for whom the work was performed. Identify a point of contact and phone number, as a reference of relevant experience.
  2. What percentage of work (volume of material dredged and placed) can you perform with your own equipment or equipment owned by another small dredging contractor?
  3. Have you performed dredging and beach placement along the south shore of Long Island, New York? If so, describe the scope of work of the project and location.
  4. Would you be willing to bid on the project described? If the answer is No, please explain why not?
  5. Would you be bidding on this project as a sole contractor, prime contractor with subcontractor(s) or as a joint venture?
  6. Is there a dollar limit on the size of contract that you would bid? If so, what is that limit?
  7. What is the largest dredging contract, in dollars, on which you were the prime contractor?
  8. What is your bonding capacity per contract? What is your total bonding capacity?
  9. On previous projects, do you have experience in completing environmental monitoring of endangered species? If so, was such work contracted to a company that specializes in such environmental work?
  10. Do you have experience applying the USACE EM 385-1-1 (Nov. 2014) and all requirements? Deficiencies observed on site will require immediate attention and action to meet all applicable safety codes.
  11. Use of USACE Resident Management System (RMS 3.0) will be required for this dredging contract. Do you have experience using the USACE Resident Management System (RMS 3.0) for delivering Submittals, Daily Dredging reports and Pay Estimates?

Equipment

12) What type of dredge equipment do you own and / or operate that is suitable for the work described? Do you own a hydraulic dredge? Please list each piece of equipment you own and/or operate that is capable of performing dredging and pumping sand for beach placement and grading, i.e., dredges, discharge pipeline (specify quantity in linear feet), dozers, front end loaders, forklifts, and/or other equipment needed for beach placement and / or grading the beach as necessary. For each dredge that you list, please specify its size, horsepower, and any other salient characteristics.

13) What length and size of discharge pipeline do you have available for use? Do you own the discharge pipeline?

14) Do you have experience with beach placement and grading of dredged material?

15) Will you be able to meet a production rate of 12,000 cubic yards per calendar day and complete all work?

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
W912EE27BA002 - Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 24-Inch Diameter) Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging - JBJ Waterway Vicksburg, Mississippi 39183, United States · NAICS 237990 ENDIST Vicksburg No set-aside
Annual Maintenance Dredging of Morehead City Inner Harbor Morehead City, North Carolina, United States · NAICS 237990 ENDIST Wilmington No set-aside
Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 8-2026 (OM26008) Plaquemine, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
New Orleans Harbor and Various Bar Channels Cutterhead Dredge 3-2025 Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
New Orleans Harbor and Various Bar Channels Cutterhead Dredge 3-2025 New Orleans, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors