Maintenance Dredging of Buttermilk Channel, New York, Federal Navigation Project
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912DS22B0007
- Agency
-
ENDIST New York
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
Notice details come from SAM.gov. Updated .
About this opportunity
The USACE New York District will be performing maintenance dredging of Buttermilk Channel in New York to depths of -35 to -40 feet MLLW. A contractor will be required to dredge approximately 200,000 CY of material consisting of gravel, sand, silt and clay using a mechanical dredge with closed clamshell bucket. The material must meet all federal, state and local criteria and will be placed at the HARS site. The contractor must commence work within 5 days of notice and maintain a production rate of at least 8,000 CY per day to minimize vessel traffic impacts during the anticipated June to November 2022 timeframe. Proposals are due no later than February 16, 2022.
This is an unrestricted procurement with no set-aside designation. The work involves dredging approximately 200,000 CY of material from Buttermilk Channel to depths of -35 to -40 feet MLLW for placement at HARS. The contract is estimated to be valued between $1-5 million and will require the contractor to commence dredging operations within 5 days of notice and remove a minimum of 8,000 CY of material per day.
Notice text
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of Buttermilk Channel, New York, Federal Navigation Project to a depth of -35 feet Mean Lower Low Water (MLLW) plus 2 feet of allowable over-depth and -40 feet MLLW plus 2 feet of allowable over-depth. The proposed maintenance dredging would remove approximately 200,000 cubic yards (CY) of critical shoals from the Buttermilk Channel with subsequent placement at the Historic Area Remediation Site (HARS). The dredged material from Buttermilk Channel is expected to consist of 0.14% gravel, 17.9% sand, 56.9% silt, and 25.06% clay.
Due to restrictions in the New York State Department of Environmental Conservation Water Quality Certificate, the proposed work can only be performed utilizing a mechanical dredge with a closed clamshell environmental bucket. Additionally, multiple scows and tugboats will be needed to perform the work during the dredging, and placement operations. The dredged material would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located.
Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed and maintain an integrated production rate of at least 8,000 cubic yards per calendar day for the dredging and placement of material. The presence of dredging equipment in the channel will impact vessel traffic and it is necessary to maintain this production rate while minimizing the duration of this impact.
The proposed work is anticipated to take place between June and November 2022. The work is estimated to cost between than $1,000,000 and $5,000,000.00.
This is an unrestricted procurement.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Maintenance Dredging of Buttermilk Channel, New York, Federal Navigation Project | Award Notice | |
| Maintenance Dredging of Buttermilk Channel, New York, Federal Navigation Project | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity