Maintain and Repair Airfield Light Control System at Illesheim and Katterbach Airfields
Award Notice Posted
- Solicitation number
- W912PB15T3059
- Agency
-
RCO Bavaria 409th CSB
Expeditionary Contracting Command, Department of Defense
- Awarded
- to ADB Safegate Germany GMBH
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912PB15P3090 Federal contract award
- NAICS code
- 488119 Other Airport Operations
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
The contractor shall provide services for maintenance and repair of Airfield Light Control system.
Katterbach Airfield
0001-Deliver & install new Minitower Computer for Visualization and Control of the Airfield Lighting (PI-Visualization) ready for use
0002-Deliver & install Power Supply unit for wiring isolation control device ready for use.
0003-Repair UCS300 Controller and ready to use reinstallation due to detected failure of blower fan.
0004-Deliver & install new UPS System ready to use as replacement for defective device.
0005-Maintenance of all CCR control Devices and PLS Systems to include all for the entire service related cost.
Illesheim Airfield
0006-Deliver & install new UPS System ready to use as replacement for defective device.
0007-Maintenance of all CCR control Devices and PLS Systems to include all for the entire service related cost.
0008-Deliver & install new Minitower Computer for Visualization and Control of the Airfield Lighting (PI-Visualization) ready for use.
For further information please see Performance Work Statement (PWS)
NOTE:
Solicitation has been amended to extend the solicitation closing date to 5:00 PM 27 APR 2015.
Update #1 ·
The contractor shall provide services for maintenance and repair of Airfield Light Control system.
Katterbach Airfield
0001-Deliver & install new Minitower Computer for Visualization and Control of the Airfield Lighting (PI-Visualization) ready for use
0002-Deliver & install Power Supply unit for wiring isolation control device ready for use.
0003-Repair UCS300 Controller and ready to use reinstallation due to detected failure of blower fan.
0004-Deliver & install new UPS System ready to use as replacement for defective device.
0005-Maintenance of all CCR control Devices and PLS Systems to include all for the entire service related cost.
Illesheim Airfield
0006-Deliver & install new UPS System ready to use as replacement for defective device.
0007-Maintenance of all CCR control Devices and PLS Systems to include all for the entire service related cost.
0008-Deliver & install new Minitower Computer for Visualization and Control of the Airfield Lighting (PI-Visualization) ready for use.
For further information please see Performance Work Statement (PWS)
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity