Lower San Joaquin River, CA Reach TS30L Levee Improvements Project

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9123824B0010
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

Paragraph 1:

The U.S. Army Corps of Engineers, Engineering District Sacramento, is seeking contractors to perform the Lower San Joaquin River, CA Reach TS30L Levee Improvements Project. The work includes modifying approximately 5,900 feet of existing levee to meet current design and operation standards, constructing a slurry bentonite cutoff wall, and adding rock slope protection. Key contract requirements include demonstrating the ability to meet levee design and operation standards, as well as experience with slurry wall installation and rock slope protection. The government estimate for the reasonable contract value, including profit, is $32,791,694. Proposals are due by August 8, 2024.

Paragraph 2:

This procurement is set aside for small businesses. No incumbent or current contractors are named. The government estimate indicates the potential award value could range up to $32,791,694. The work is located along the Lower San Joaquin River in California and will be performed within the geographic area of the U.S. Army Corps of Engineers, Engineering District Sacramento.

Notice text

13 versions

Update #13 · Latest ·

***Amendment 0008 to post the final specs update and update CLIN Schedule to match Bid Schedule*** Administrative action to repost previous Amendment to extend bids to 8 Aug 2024***The purpose of Amendment 0007 is to extend bid proposals due 08 Aug 2024.** *** The purpose of Amendment 0006 is to provide clarification on unit of measurements. ** **The purpose of Amendment 0005 is to provide updated Bid Schedule and most recent Wage Determination. ** Amendment 0001 posted 06/17/2024. See Solicitation amendment 0001 PDF for more details. ** Site visit sign in sheet has been uploaded and is marked as Amendment 0002**. ** Amendment 0003 extended bid proposal due date to 1 Aug 0024**. **Amendment 0004 provided for updated specs and Wage Determination as well as updated CLIN schedule on SF1442**.

Update #12 ·

***Amendment 0008 to post the final specs update and update CLIN Schedule to match Bid Schedule*** Administrative action to repost previous Amendment to extend bids to 8 Aug 2024***The purpose of Amendment 0007 is to extend bid proposals due 08 Aug 2024.** *** The purpose of Amendment 0006 is to provide clarification on unit of measurements. ** **The purpose of Amendment 0005 is to provide updated Bid Schedule and most recent Wage Determination. ** Amendment 0001 posted 06/17/2024. See Solicitation amendment 0001 PDF for more details. ** Site visit sign in sheet has been uploaded and is marked as Amendment 0002**. ** Amendment 0003 extended bid proposal due date to 1 Aug 0024**. **Amendment 0004 provided for updated specs and Wage Determination as well as updated CLIN schedule on SF1442**.

Update #11 ·

Administrative action to repost previous Amendment to extend bids to 8 Aug 2024***The purpose of Amendment 0007 is to extend bid proposals due 08 Aug 2024.** *** The purpose of Amendment 0006 is to provide clarification on unit of measurements. ** **The purpose of Amendment 0005 is to provide updated Bid Schedule and most recent Wage Determination. ** Amendment 0001 posted 06/17/2024. See Solicitation amendment 0001 PDF for more details. ** Site visit sign in sheet has been uploaded and is marked as Amendment 0002**. ** Amendment 0003 extended bid proposal due date to 1 Aug 0024**. **Amendment 0004 provided for updated specs and Wage Determination as well as updated CLIN schedule on SF1442**.

Update #10 ·

***The purpose of Amendment 0007 is to extend bid proposals due 08 Aug 2024.** *** The purpose of Amendment 0006 is to provide clarification on unit of measurements. ** **The purpose of Amendment 0005 is to provide updated Bid Schedule and most recent Wage Determination. ** Amendment 0001 posted 06/17/2024. See Solicitation amendment 0001 PDF for more details. ** Site visit sign in sheet has been uploaded and is marked as Amendment 0002**. ** Amendment 0003 extended bid proposal due date to 1 Aug 0024**. **Amendment 0004 provided for updated specs and Wage Determination as well as updated CLIN schedule on SF1442**.

Update #9 ·

*****7/31/2024 - For clarification:  Please use the Bid schedule to price out CLINs instead of Pgs 4 – 12 under Section 00 10 00 for ease of tracking prices. CLIN renumbering and additions will be reflected in final award.  All other documents on bidder instructions page are required.  

***Update*** 7/30/2024 : Due to recent amendments, please use the revised bid schedule in Amendment 006 to submit pricing along with the required documents mentioned on bidder instructions page. 

** The purpose of Amendment 0006 is to provide clarification on unit of measurements. ** **The purpose of Amendment 0005 is to provide updated Bid Schedule and most recent Wage Determination. ** Amendment 0001 posted 06/17/2024. See Solicitation amendment 0001 PDF for more details. ** Site visit sign in sheet has been uploaded and is marked as Amendment 0002**. ** Amendment 0003 extended bid proposal due date to 1 Aug 0024**. **Amendment 0004 provided for updated specs and Wage Determination as well as updated CLIN schedule on SF1442**.

Update #8 ·

***Update*** 7/30/2024 : Due to recent amendments, please use the revised bid schedule in Amendment 006 to submit pricing along with the required documents mentioned on bidder instructions page. 

** The purpose of Amendment 0006 is to provide clarification on unit of measurements. ** **The purpose of Amendment 0005 is to provide updated Bid Schedule and most recent Wage Determination. ** Amendment 0001 posted 06/17/2024. See Solicitation amendment 0001 PDF for more details. ** Site visit sign in sheet has been uploaded and is marked as Amendment 0002**. ** Amendment 0003 extended bid proposal due date to 1 Aug 0024**. **Amendment 0004 provided for updated specs and Wage Determination as well as updated CLIN schedule on SF1442**.

Update #7 ·

** The purpose of Amendment 0006 is to provide clarification on unit of measurements. ** **The purpose of Amendment 0005 is to provide updated Bid Schedule and most recent Wage Determination. ** Amendment 0001 posted 06/17/2024. See Solicitation amendment 0001 PDF for more details. ** Site visit sign in sheet has been uploaded and is marked as Amendment 0002**. ** Amendment 0003 extended bid proposal due date to 1 Aug 0024**. **Amendment 0004 provided for updated specs and Wage Determination as well as updated CLIN schedule on SF1442**.

Update #6 ·

***7/29/2024 *** Due to PIEE system error, please use this link to pull all amendment documents at https://piee.eb.mil/sol/xhtml/unauth/index.xhtml and then search by the solicitation number to view this amendment. 

**The purpose of Amendment 0005 is to provide updated Bid Schedule and most recent Wage Determination. ** Amendment 0001 posted 06/17/2024. See Solicitation amendment 0001 PDF for more details. ** Site visit sign in sheet has been uploaded and is marked as Amendment 0002**. ** Amendment 0003 extended bid proposal due date to 1 Aug 0024**. **Amendment 0004 provided for updated specs and Wage Determination as well as updated CLIN schedule on SF1442**.

Update #5 ·

**The purpose of Amendment 0005 is to provide updated Bid Schedule and most recent Wage Determination. ** Amendment 0001 posted 06/17/2024. See Solicitation amendment 0001 PDF for more details. ** Site visit sign in sheet has been uploaded and is marked as Amendment 0002**. ** Amendment 0003 extended bid proposal due date to 1 Aug 0024**. **Amendment 0004 provided for updated specs and Wage Determination as well as updated CLIN schedule on SF1442**.

Update #4 ·

** The purpose of Amendment 0003 is to extend the bid due date to August 1st, 2024. ** Site visit sign in sheet has been uploaded**. ** Amendment 0001 posted 06/17/2024. See Solicitation amendment 0001 PDF for more details.**Project Description: The Feasibility Study_s recommended plan has been divided into five major levee reaches for construction sequencing: Calaveras River (Right Bank)_ Calaveras River (Left Bank) and San Joaquin River (Right Bank, North Port)_ Delta Front and Fourteenmile Slough Control Structure_ North Stockton and Smith Canal Control Structure. The Delta Front represents the greatest risk_ construction of the Project will begin with the Delta Front levees. Reach TS30L is one of six (6) reaches in the Delta Front and was selected for final design and construction. Reach TS30L levee improvements include modifying approximately 5900 feet existing levee geometry to meet current levee design and operation standards_ constructing a 31 to 55 foot deep slurry bentonite cutoff wall installation_ and to adding rock slope protection on the waterside (western) levee slope.

Update #3 ·

** Site visit sign in sheet has been uploaded**. ** Amendment 0001 posted 06/17/2024. See Solicitation amendment 0001 PDF for more details.**Project Description: The Feasibility Study_s recommended plan has been divided into five major levee reaches for construction sequencing: Calaveras River (Right Bank)_ Calaveras River (Left Bank) and San Joaquin River (Right Bank, North Port)_ Delta Front and Fourteenmile Slough Control Structure_ North Stockton and Smith Canal Control Structure. The Delta Front represents the greatest risk_ construction of the Project will begin with the Delta Front levees. Reach TS30L is one of six (6) reaches in the Delta Front and was selected for final design and construction. Reach TS30L levee improvements include modifying approximately 5900 feet existing levee geometry to meet current levee design and operation standards_ constructing a 31 to 55 foot deep slurry bentonite cutoff wall installation_ and to adding rock slope protection on the waterside (western) levee slope.

Update #2 ·

** Amendment 0001 posted 06/17/2024. See Solicitation amendment 0001 PDF for more details.**Project Description: The Feasibility Study_s recommended plan has been divided into five major levee reaches for construction sequencing: Calaveras River (Right Bank)_ Calaveras River (Left Bank) and San Joaquin River (Right Bank, North Port)_ Delta Front and Fourteenmile Slough Control Structure_ North Stockton and Smith Canal Control Structure. The Delta Front represents the greatest risk_ construction of the Project will begin with the Delta Front levees. Reach TS30L is one of six (6) reaches in the Delta Front and was selected for final design and construction. Reach TS30L levee improvements include modifying approximately 5900 feet existing levee geometry to meet current levee design and operation standards_ constructing a 31 to 55 foot deep slurry bentonite cutoff wall installation_ and to adding rock slope protection on the waterside (western) levee slope.

Update #1 ·

Project Description: The Feasibility Study_s recommended plan has been divided into five major levee reaches for construction sequencing: Calaveras River (Right Bank)_ Calaveras River (Left Bank) and San Joaquin River (Right Bank, North Port)_ Delta Front and Fourteenmile Slough Control Structure_ North Stockton and Smith Canal Control Structure. The Delta Front represents the greatest risk_ construction of the Project will begin with the Delta Front levees. Reach TS30L is one of six (6) reaches in the Delta Front and was selected for final design and construction. Reach TS30L levee improvements include modifying approximately 5900 feet existing levee geometry to meet current levee design and operation standards_ constructing a 31 to 55 foot deep slurry bentonite cutoff wall installation_ and to adding rock slope protection on the waterside (western) levee slope.

Files

Notice history

Notice Type Posted
Lower San Joaquin River, CA Reach TS30L Levee Improvements Project Award Award Notice
This notice Latest solicitation Solicitation
Lower San Joaquin Reach TS30L Pre-Solicitation
Lower San Joaquin Reach TS30L Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA Sacramento, California 95837 · NAICS 237990 ENDIST Sacramento No set-aside
CONCORDIA PARISH, LOUISIANA; FC/MR and T, WBMRL; LEVEE, ENLARGEMENT AND BERMS; UPPER LAKE CONCORDIA - VIDALIA, ITEM 367-R NAICS 237990 ENDIST Vicksburg Total Small Business
Brine pipeline access improvements City of Menifee, Riverside County, CA · NAICS 237110 ENDIST Los Angeles Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity