The U.S. Army Corps of Engineers, Pittsburgh District is seeking a contractor to construct an anchored sheet pile wall along the Ohio River to create a lower pool workboat mooring area at Dashields Locks and Dam in Allegheny County, Pennsylvania. The scope of work includes installing approximately 80 feet of sheet pile wall, limited underwater excavation, installation of mooring and access appurtenances including an access ladder and variable height mooring system, erosion controls, removal and replacement of existing riprap and fencing, demolition of concrete rubble, and disposal of excavated materials. Questions are due by April 27th and bids are due by May 16th.

This is a total small business set-aside solicitation under NAICS codes 237990 and 237310. The contract was awarded to Marion Hill Associates, Inc., the lowest bidder at $2,088,313.00 at a bid opening on May 18, 2023. The work must be completed within 365 calendar days of notice to proceed and performance will be at Dashields Locks and Dam in Coraopolis, Pennsylvania.

Notice text

3 versions

Update #3 · Latest ·

Lower Pool Workboat Mooring Area, Dashields Locks and Dam, Allegheny County, Pennsylvania. The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves construction of an anchored sheet pile wall along the Ohio River to create a workboat mooring area at Dashields Locks and Dam, Allegheny County, PA. The work is to be performed from the landward side of the existing lower guide wall which is accessed from an existing parking lot adjoining to Dashields Lock Road. The base contract generally includes construction of an anchored sheet pile wall approximately 80 feet long, located between the Dashields Locks and Dam lower guide wall and the existing parking area, followed by limited underwater excavation to create draft and a footprint for safe mooring of the facility?s workboat. Mooring and access appurtenances including an access ladder and a variable height mooring system with integrated fender system shall also be installed at the rear face of the lower guide wall as part of this contract. The major features of the requirements are identified below:The contract specifically includes:a. Erosion and sediment controls consistent with the magnitude and scope of projects involving work on a waterway.b. Removal and salvage, including stockpiling and replacement, of existing riprap slope protection along the riverbank.c. Sheet pile driving parallel to an existing lock wall with active river navigation.d. Installation of post-tensioned multi-strand tie-back anchors.? Drilling and casing inclined boreholes through soil and bedrock.? Watertightness testing and grouting.? Connection of anchor to sheet pile wall structure.? Anchor post-tensioning including proof and performance testing.e. Underwater excavation and disposal of excavated materials.f. General earthwork including excavation and slope grading.g. Limited mechanical demolition of concrete rubble and large diameter rock to facilitate construction.h. Design and installation of a variable height, slide based mooring system to be installed at the rear face of the existing concrete lower guide wall.i. Removal, replacement, modification, and new construction of security fencing on various mounting surfaces.j. Removal and replacement of guiderail.Excavated soils must be disposed of at a commercially permitted facility licensed to accept the material. Concrete rubble and other construction waste material must also be disposed of at a commercially permitted facility licensed to accept the waste or recycled if applicable.The work shall be completed within 365 calendar days after written Notice to Proceed. NOTE: Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/then clicking on ?View FFP Contract Changes Playbook Here?.

BID RESULTS POSTED.

Update #2 ·

Lower Pool Workboat Mooring Area, Dashields Locks and Dam, Allegheny County, Pennsylvania. The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves construction of an anchored sheet pile wall along the Ohio River to create a workboat mooring area at Dashields Locks and Dam, Allegheny County, PA. The work is to be performed from the landward side of the existing lower guide wall which is accessed from an existing parking lot adjoining to Dashields Lock Road. The base contract generally includes construction of an anchored sheet pile wall approximately 80 feet long, located between the Dashields Locks and Dam lower guide wall and the existing parking area, followed by limited underwater excavation to create draft and a footprint for safe mooring of the facility?s workboat. Mooring and access appurtenances including an access ladder and a variable height mooring system with integrated fender system shall also be installed at the rear face of the lower guide wall as part of this contract. The major features of the requirements are identified below:The contract specifically includes:a. Erosion and sediment controls consistent with the magnitude and scope of projects involving work on a waterway.b. Removal and salvage, including stockpiling and replacement, of existing riprap slope protection along the riverbank.c. Sheet pile driving parallel to an existing lock wall with active river navigation.d. Installation of post-tensioned multi-strand tie-back anchors.? Drilling and casing inclined boreholes through soil and bedrock.? Watertightness testing and grouting.? Connection of anchor to sheet pile wall structure.? Anchor post-tensioning including proof and performance testing.e. Underwater excavation and disposal of excavated materials.f. General earthwork including excavation and slope grading.g. Limited mechanical demolition of concrete rubble and large diameter rock to facilitate construction.h. Design and installation of a variable height, slide based mooring system to be installed at the rear face of the existing concrete lower guide wall.i. Removal, replacement, modification, and new construction of security fencing on various mounting surfaces.j. Removal and replacement of guiderail.Excavated soils must be disposed of at a commercially permitted facility licensed to accept the material. Concrete rubble and other construction waste material must also be disposed of at a commercially permitted facility licensed to accept the waste or recycled if applicable.The work shall be completed within 365 calendar days after written Notice to Proceed. NOTE: Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/then clicking on ?View FFP Contract Changes Playbook Here?.

Update #1 ·

Lower Pool Workboat Mooring Area, Dashields Locks and Dam, Allegheny County, Pennsylvania. The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves construction of an anchored sheet pile wall along the Ohio River to create a workboat mooring area at Dashields Locks and Dam, Allegheny County, PA. The work is to be performed from the landward side of the existing lower guide wall which is accessed from an existing parking lot adjoining to Dashields Lock Road. The base contract generally includes construction of an anchored sheet pile wall approximately 80 feet long, located between the Dashields Locks and Dam lower guide wall and the existing parking area, followed by limited underwater excavation to create draft and a footprint for safe mooring of the facility?s workboat. Mooring and access appurtenances including an access ladder and a variable height mooring system with integrated fender system shall also be installed at the rear face of the lower guide wall as part of this contract. The major features of the requirements are identified below:The contract specifically includes:a. Erosion and sediment controls consistent with the magnitude and scope of projects involving work on a waterway.b. Removal and salvage, including stockpiling and replacement, of existing riprap slope protection along the riverbank.c. Sheet pile driving parallel to an existing lock wall with active river navigation.d. Installation of post-tensioned multi-strand tie-back anchors.? Drilling and casing inclined boreholes through soil and bedrock.? Watertightness testing and grouting.? Connection of anchor to sheet pile wall structure.? Anchor post-tensioning including proof and performance testing.e. Underwater excavation and disposal of excavated materials.f. General earthwork including excavation and slope grading.g. Limited mechanical demolition of concrete rubble and large diameter rock to facilitate construction.h. Design and installation of a variable height, slide based mooring system to be installed at the rear face of the existing concrete lower guide wall.i. Removal, replacement, modification, and new construction of security fencing on various mounting surfaces.j. Removal and replacement of guiderail.Excavated soils must be disposed of at a commercially permitted facility licensed to accept the material. Concrete rubble and other construction waste material must also be disposed of at a commercially permitted facility licensed to accept the waste or recycled if applicable.The work shall be completed within 365 calendar days after written Notice to Proceed. NOTE: Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/then clicking on ?View FFP Contract Changes Playbook Here?.

POSTING OF SITE VISIT HELD 4/21/2023. 

Files

File Type Posted
BID RESULTS.docx DOCX document
Contracting Discussion.pdf PDF
Site Visit Sign In Sheet.pdf PDF
Site Visit Agenda.pdf PDF

Notice history

Notice Type Posted
Lower Pool Workboat Mooring Area, Dashields Locks and Dam Award Award Notice
This notice Latest solicitation Solicitation
Lower Pool Workboat Mooring Area, Dashields Locks and Dam, Allegheny County, Pennsylvania Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
JP Murtha Float Mooring Bitts Retrofit JP Murtha Locks and DamMonongahela River BasinGibsonton Road, Monessen, PA 15062 15062 · NAICS 237990 ENDIST Pittsburgh No set-aside
Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation Millvale, Pennsylvania, United States · NAICS 237990 ENDIST Pittsburgh Total Small Business
Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation Canonsburg-Houston, Strabane, Washington County, Pennsylvania 15317 · NAICS 237990 ENDIST Pittsburgh Total Small Business
Pittsburgh facility 079 MEP parking lot erosion control 7100 Leech Farm Rd, Pittsburgh, PA 15206 15206 ENDIST Philadelphia No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors