Long Lead/Low Rate Initial Production, and associated logistics and engineering support of Tactical Mast Trailers
Award Notice Posted
- Solicitation number
- W31P4Q-16-R-0112
- Agency
-
Aviation and Missile Command
Army Materiel Command, Department of Defense
- Awarded
- to TIM Price Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W31P4Q17C0056 Federal contract award
- NAICS code
- 334220 Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
- PSC
- Not on record
- Place of performance
- Army Contracting Command Redstone, Building 5250, A300 Redstone Arsenal, Alabama 35898, United States
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
******THIS IS NOT A COMBINED SYNOPSIS/ SOLICITATION. THIS IS A PRE-SOLICITATION NOTICE ONLY. A FORMAL SOLICITATION WILL FOLLOW ONCE THIS POSTING CLOSES ON JUNE 28, 2016. NO OFFERS WILL BE ACCEPTED PRIOR TO FORMAL ISSUANCE OF SOLICITATION W31P4Q-16-R-0112.******
The purpose of this synopsis is to provide notice to the public of information applicable to the purchase of twelve (12) Tactical Mast Trailers, Version 2 (TMTs V2) with Covers. NAICS Code: 334220, PSC Code: 2330.
This synopsis is being issued in accordance with FAR Part 5.204 Pre-Solicitation Notices.
The Integrated Air and Missile Defense (IAMD) requires the TMTs V2 in 3Q FY16 for integration into IBCS Integrated Fire Control Network (IFCN) Relay major end items that support Low Rate Initial Production (LRIP) qualification and flight testing. The TMT V2 includes a 30-meter (98.5 feet), quick-erect telescopic mast, trailer, battery charger auxiliary power unit, and power distribution system.
It is the Government's intent to pursue other than full and open competition pursuant to 10 United States Code (USC) 2304(c)(1), as implemented by Federal Acquisition Regulation (FAR) 6.302-1(a)(2)(ii)(A) and (B) entitled "Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements." Pursuant to (FAR) 6.302-1(a)(2)(ii)(A) and (B), the Government anticipates solicitation and award to Contact! Corporation, 1818 Roberts Street, Winchester, Virginia 22601, CAGE Code 097B0. As the OEM, Contact! Corporation is the only known source that can provide proprietary parts and technical knowledge to successfully convert and configure the equipment to safe, original operating conditions. All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency. No set-aside is provided.
Firm Fixed-Price (FFP)
Estimated Contract Award Date - 30 Sep 2016
All responses shall be submitted to the U.S. Army Contracting Command, ATTN: CCAM-SM-A/Maggie Bevis, Building 5250, Redstone Arsenal, AL 35898-5280 or email maggie.g.bevis.civ@mail.mil and courtesy copied to Major Jada L. Harfield, Building 5250 Redstone Arsenal, AL 35898-5280 or email jada.l.hartfield.mil@mail.mil.
Your written responses are required by 1500 CDT 28 June 2016. All questions and comments must be in writing (electronic email responses are acceptable), and no telephone calls will be accepted.
Update #3 ·
******THIS IS NOT A COMBINED SYNOPSIS/ SOLICITATION. THIS IS A PRE-SOLICITATION NOTICE ONLY. A FORMAL SOLICITATION WILL FOLLOW ONCE THIS POSTING CLOSES ON JUNE 28, 2016. NO OFFERS WILL BE ACCEPTED PRIOR TO FORMAL ISSUANCE OF SOLICITATION W31P4Q-16-R-0112.******
The purpose of this synopsis is to provide notice to the public of information applicable to the purchase of twelve (12) Tactical Mast Trailers, Version 2 (TMTs V2) with Covers. NAICS Code: 532120, PSC Code: 2330.
This synopsis is being issued in accordance with FAR Part 5.204 Pre-Solicitation Notices.
The Integrated Air and Missile Defense (IAMD) requires the TMTs V2 in 3Q FY16 for integration into IBCS Integrated Fire Control Network (IFCN) Relay major end items that support Low Rate Initial Production (LRIP) qualification and flight testing. The TMT V2 includes a 30-meter (98.5 feet), quick-erect telescopic mast, trailer, battery charger auxiliary power unit, and power distribution system.
It is the Government's intent to pursue other than full and open competition pursuant to 10 United States Code (USC) 2304(c)(1), as implemented by Federal Acquisition Regulation (FAR) 6.302-1(a)(2)(ii)(A) and (B) entitled "Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements." Pursuant to (FAR) 6.302-1(a)(2)(ii)(A) and (B), the Government anticipates solicitation and award to Contact! Corporation, 1818 Roberts Street, Winchester, Virginia 22601, CAGE Code 097B0. As the OEM, Contact! Corporation is the only known source that can provide proprietary parts and technical knowledge to successfully convert and configure the equipment to safe, original operating conditions. All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency. No set-aside is provided.
Firm Fixed-Price (FFP)
Estimated Contract Award Date - 31 Jan 2017
All responses shall be submitted to the U.S. Army Contracting Command, ATTN: CCAM-SM-A/Maggie Bevis, Building 5250, Redstone Arsenal, AL 35898-5280 or email maggie.g.bevis.civ@mail.mil and courtesy copied to Major Jada L. Harfield, Building 5250 Redstone Arsenal, AL 35898-5280 or email jada.l.hartfield.mil@mail.mil.
Your written responses are required by 1500 CDT 28 June 2016. All questions and comments must be in writing (electronic email responses are acceptable), and no telephone calls will be accepted.
Update #2 ·
The purpose of this synopsis is to provide notice to the public of information applicable to the purchase of twelve (12) Tactical Mast Trailers, Version 2 (TMTs V2) with Covers. NAICS Code: 532120, PSC Code: 2330.
This synopsis is being issued in accordance with FAR Part 5.204 Pre-Solicitation Notices.
The Integrated Air and Missile Defense (IAMD) requires the TMTs V2 in 3Q FY16 for integration into IBCS Integrated Fire Control Network (IFCN) Relay major end items that support Low Rate Initial Production (LRIP) qualification and flight testing. The TMT V2 includes a 30-meter (98.5 feet), quick-erect telescopic mast, trailer, battery charger auxiliary power unit, and power distribution system.
It is the Government's intent to pursue other than full and open competition pursuant to 10 United States Code (USC) 2304(c)(1), as implemented by Federal Acquisition Regulation (FAR) 6.302-1(a)(2)(ii)(A) and (B) entitled "Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements." Pursuant to (FAR) 6.302-1(a)(2)(ii)(A) and (B), the Government anticipates solicitation and award to Contact! Corporation, 1818 Roberts Street, Winchester, Virginia 22601, CAGE Code 097B0. As the OEM, Contact! Corporation is the only known source that can provide proprietary parts and technical knowledge to successfully convert and configure the equipment to safe, original operating conditions. All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency. No set-aside is provided.
Firm Fixed-Price (FFP)
Estimated Contract Award Date - 31 Jan 2017
All responses shall be submitted to the U.S. Army Contracting Command, ATTN: CCAM-SM-A/Maggie Bevis, Building 5250, Redstone Arsenal, AL 35898-5280 or email maggie.g.bevis.civ@mail.mil and courtesy copied to Major Jada L. Harfield, Building 5250 Redstone Arsenal, AL 35898-5280 or email jada.l.hartfield.mil@mail.mil.
Your written responses are required by 1500 CDT 28 June 2016. All questions and comments must be in writing (electronic email responses are acceptable), and no telephone calls will be accepted.
Update #1 ·
The purpose of this synopsis is to provide notice to the public of information applicable to the purchase of twelve (12) Tactical Mast Trailers, Version 2 (TMTs V2) with Covers. NAICS Code: 532120, PSC Code: 2330.
This synopsis is being issued in accordance with FAR Part 5.204 Pre-Solicitation Notices.
The Integrated Air and Missile Defense (IAMD) requires the TMTs V2 in 3Q FY16 for integration into IBCS Integrated Fire Control Network (IFCN) Relay major end items that support Low Rate Initial Production (LRIP) qualification and flight testing. The TMT V2 includes a 30-meter (98.5 feet), quick-erect telescopic mast, trailer, battery charger auxiliary power unit, and power distribution system.
It is the Government's intent to pursue other than full and open competition pursuant to 10 United States Code (USC) 2304(c)(1), as implemented by Federal Acquisition Regulation (FAR) 6.302-1(a)(2)(ii)(A) and (B) entitled "Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements." Pursuant to (FAR) 6.302-1(a)(2)(ii)(A) and (B), the Government anticipates solicitation and award to Contact! Corporation, 1818 Roberts Street, Winchester, Virginia 22601, CAGE Code 097B0. As the OEM, Contact! Corporation is the only known source that can provide proprietary parts and technical knowledge to successfully convert and configure the equipment to safe, original operating conditions. All responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency. No set-aside is provided.
Firm Fixed-Price (FFP)
Estimated Contract Award Date - 31 Jan 2017
Mrs. Maggie Bevis, Maggie.g.bevis.civ@mail.mil, (256)876-5209, Contracting Specialist; Major Jada L. Hartfield, jada.l.hartfield.mil@mail.mil, (256)313-8521, Contracting Specialist; or Ms. Kristi Daggett, Kristin.l.daggett.civ@mail.mil, (256)842-7326, Contracting Officer. Army Contracting Command - Redstone, Building 5250, A300, Redstone Arsenal, AL 35898.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity