Little Wood River, Gooding, Idaho

Closed Pre-Solicitation Posted

Solicitation number
W912EF25R0007
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Gooding, Idaho 83330, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers (USACE) Walla Walla District is preparing to issue a design-build construction contract for the Little Wood River project in Gooding, Idaho. The solicitation will follow Two-Phase Design-Build Selection Procedures as outlined in FAR Subpart 36.3, with a 30% conceptual design package to be provided in Phase II. Contractors will be responsible for completing the design and executing construction work, which includes wall repair/replacement and vehicle and pedestrian bridge replacement along a 0.9-mile lava rock wall channel. The project requires contractors to use Bentley DGN format for CAD drawings and comply with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1). The solicitation is expected to be available on sam.gov in January 2024, with proposals due approximately 30 days after posting, and an anticipated contract award in October 2024.

The procurement is an unrestricted contract, not set aside for small businesses, with a NAICS code of 237990 (Other Heavy and Civil Engineering Construction) and a small business size standard of $45 Million. The contract value is estimated between $25 million and $100 million, with 100% performance and payment bonds required. Contractors must register in the System for Award Management (SAM) and will need to develop comprehensive project-specific documentation including an Accident Prevention Plan, Activity Hazard Analyses, and a Fall Protection Plan. The project involves intricate construction elements such as mortar repointing, concrete wall repairs, drainage culverts, irrigation systems, fencing, and bridge replacements with reinforced concrete decks, railings, abutments, and wingwalls. Contractors will be expected to use the Government-furnished Resident Management System (RMS) - Contractor Mode to record and maintain project information throughout the contract period.

Notice text

6 versions

Update #6 · Latest ·

May 1, 2025 Update: The Government does not currently anticipate soliciting design services for this effort. The Government currently projects that the construction solicitation will be issued November 2026.

March 18, 2025 Update: Thank you so much for you ongoing interest in this project. The Government has decided to shift the acquistion strategy for this project from Design-Build to Design-Bid-Build. The Government currently projects that the solicitation for the construction effort will be released April 2026.

This presolicitation notice has been updated to change the response date from 7 February 2025 to 21 February 2025. No response is required. Please continue to watch this presolicitation notice for further updates.

The U.S. Army Corps of Engineers (USACE) Walla Walla District intends to issue a construction solicitation for a project titled Little Wood River, Gooding, Idaho. The work is located in Gooding, Idaho. This will be a firm-fixed-price, design build construction contract. The magnitude of construction is between $25,000,000 and $100,000,000. 100% performance and payment bonds will be required. The government expects to award one contract in October 2025.  The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction and the associated small business size standard is $45 Million. This solicitation is not set aside for small business, i.e. unrestricted and open to both small and large businesses

The solicitation will follow the Two-Phase Design-Build Selection Procedures as outlined in FAR Subpart 36.3. A site visit will be offered during Phase II of the two-phase selection process. Only one site visit is expected to be offered.

The solicitation is expected to be made available for download on the sam.gov Contract Opportunities website in January 2025. Offerors are responsible for checking the referenced page for any updates to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted at the referenced website. Proposals will be due approximately 30 days after the solicitation is posted. The exact proposal due date will be indicated in the solicitation.

System for Award Management (SAM): Offerors must register in the SAM at https://sam.gov/content/home prior to receiving an award.

Point of contact for this procurement is Preston Jones, Contract Specialist at Preston.E.Jones@usace.army.mil

All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).

The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1.

Use the Government-furnished Resident Management System (RMS) – Contractor Mode to record, maintain, and submit various information throughout the contract period. RMS is a Windows-based program capable of operating on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor at time of notice to proceed.

The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.

Summary Scope of Work

Design:

A 30% conceptual design package which conveys the Government’s design intent will be provided with the Phase II Solicitation. The design package will include plans, specifications, a geotechnical exploration report, and a recent site survey. The Contractor will be responsible for continuing this design package to completion. Contractor-generated CAD drawings must be in Bentley DGN format.

Construction:

Proposed construction features are divided into two primary categories: (1) wall repair/replacement and (2) vehicle and pedestrian bridge replacement. The project is a lava rock wall channel; the channel dimensions are approximately 24 feet wide, 8 feet deep, and 0.9 miles long.

Wall repair/replacement work may include: mortar repointing, concrete walls, concrete blocks, geotextiles, drainage culverts, irrigation systems, fencing, waterstop installation, road reconstruction, pavements, and pavement striping.

Bridge replacement work may include: demolition of roadway culverts, demolition of pedestrian bridges, traffic control, installation of new roadway bridges, installation of new pedestrian bridges, and road reconstruction.  The bridges will include reinforced concrete decks, railings, abutments, and wingwalls.

Update #5 ·

March 18, 2025 Update: Thank you so much for you ongoing interest in this project. The Government has decided to shift the acquistion strategy for this project from Design-Build to Design-Bid-Build. The Government currently projects that the solicitation for the construction effort will be released April 2026.

This presolicitation notice has been updated to change the response date from 7 February 2025 to 21 February 2025. No response is required. Please continue to watch this presolicitation notice for further updates.

The U.S. Army Corps of Engineers (USACE) Walla Walla District intends to issue a construction solicitation for a project titled Little Wood River, Gooding, Idaho. The work is located in Gooding, Idaho. This will be a firm-fixed-price, design build construction contract. The magnitude of construction is between $25,000,000 and $100,000,000. 100% performance and payment bonds will be required. The government expects to award one contract in October 2025.  The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction and the associated small business size standard is $45 Million. This solicitation is not set aside for small business, i.e. unrestricted and open to both small and large businesses

The solicitation will follow the Two-Phase Design-Build Selection Procedures as outlined in FAR Subpart 36.3. A site visit will be offered during Phase II of the two-phase selection process. Only one site visit is expected to be offered.

The solicitation is expected to be made available for download on the sam.gov Contract Opportunities website in January 2025. Offerors are responsible for checking the referenced page for any updates to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted at the referenced website. Proposals will be due approximately 30 days after the solicitation is posted. The exact proposal due date will be indicated in the solicitation.

System for Award Management (SAM): Offerors must register in the SAM at https://sam.gov/content/home prior to receiving an award.

Point of contact for this procurement is Preston Jones, Contract Specialist at Preston.E.Jones@usace.army.mil

All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).

The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1.

Use the Government-furnished Resident Management System (RMS) – Contractor Mode to record, maintain, and submit various information throughout the contract period. RMS is a Windows-based program capable of operating on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor at time of notice to proceed.

The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.

Summary Scope of Work

Design:

A 30% conceptual design package which conveys the Government’s design intent will be provided with the Phase II Solicitation. The design package will include plans, specifications, a geotechnical exploration report, and a recent site survey. The Contractor will be responsible for continuing this design package to completion. Contractor-generated CAD drawings must be in Bentley DGN format.

Construction:

Proposed construction features are divided into two primary categories: (1) wall repair/replacement and (2) vehicle and pedestrian bridge replacement. The project is a lava rock wall channel; the channel dimensions are approximately 24 feet wide, 8 feet deep, and 0.9 miles long.

Wall repair/replacement work may include: mortar repointing, concrete walls, concrete blocks, geotextiles, drainage culverts, irrigation systems, fencing, waterstop installation, road reconstruction, pavements, and pavement striping.

Bridge replacement work may include: demolition of roadway culverts, demolition of pedestrian bridges, traffic control, installation of new roadway bridges, installation of new pedestrian bridges, and road reconstruction.  The bridges will include reinforced concrete decks, railings, abutments, and wingwalls.

Update #4 ·

This presolicitation notice has been updated to change the response date from 7 February 2025 to 21 February 2025. No response is required. Please continue to watch this presolicitation notice for further updates.

The U.S. Army Corps of Engineers (USACE) Walla Walla District intends to issue a construction solicitation for a project titled Little Wood River, Gooding, Idaho. The work is located in Gooding, Idaho. This will be a firm-fixed-price, design build construction contract. The magnitude of construction is between $25,000,000 and $100,000,000. 100% performance and payment bonds will be required. The government expects to award one contract in October 2025.  The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction and the associated small business size standard is $45 Million. This solicitation is not set aside for small business, i.e. unrestricted and open to both small and large businesses

The solicitation will follow the Two-Phase Design-Build Selection Procedures as outlined in FAR Subpart 36.3. A site visit will be offered during Phase II of the two-phase selection process. Only one site visit is expected to be offered.

The solicitation is expected to be made available for download on the sam.gov Contract Opportunities website in January 2025. Offerors are responsible for checking the referenced page for any updates to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted at the referenced website. Proposals will be due approximately 30 days after the solicitation is posted. The exact proposal due date will be indicated in the solicitation.

System for Award Management (SAM): Offerors must register in the SAM at https://sam.gov/content/home prior to receiving an award.

Point of contact for this procurement is Preston Jones, Contract Specialist at Preston.E.Jones@usace.army.mil

All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).

The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1.

Use the Government-furnished Resident Management System (RMS) – Contractor Mode to record, maintain, and submit various information throughout the contract period. RMS is a Windows-based program capable of operating on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor at time of notice to proceed.

The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.

Summary Scope of Work

Design:

A 30% conceptual design package which conveys the Government’s design intent will be provided with the Phase II Solicitation. The design package will include plans, specifications, a geotechnical exploration report, and a recent site survey. The Contractor will be responsible for continuing this design package to completion. Contractor-generated CAD drawings must be in Bentley DGN format.

Construction:

Proposed construction features are divided into two primary categories: (1) wall repair/replacement and (2) vehicle and pedestrian bridge replacement. The project is a lava rock wall channel; the channel dimensions are approximately 24 feet wide, 8 feet deep, and 0.9 miles long.

Wall repair/replacement work may include: mortar repointing, concrete walls, concrete blocks, geotextiles, drainage culverts, irrigation systems, fencing, waterstop installation, road reconstruction, pavements, and pavement striping.

Bridge replacement work may include: demolition of roadway culverts, demolition of pedestrian bridges, traffic control, installation of new roadway bridges, installation of new pedestrian bridges, and road reconstruction.  The bridges will include reinforced concrete decks, railings, abutments, and wingwalls.

Update #3 ·

This presolicitation notice has been updated to change the response date from 24 January 2025 to 7 February 2025. No response is required. Please continue to watch this presolicitation notice for further updates.

The U.S. Army Corps of Engineers (USACE) Walla Walla District intends to issue a construction solicitation for a project titled Little Wood River, Gooding, Idaho. The work is located in Gooding, Idaho. This will be a firm-fixed-price, design build construction contract. The magnitude of construction is between $25,000,000 and $100,000,000. 100% performance and payment bonds will be required. The government expects to award one contract in October 2025.  The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction and the associated small business size standard is $45 Million. This solicitation is not set aside for small business, i.e. unrestricted and open to both small and large businesses

The solicitation will follow the Two-Phase Design-Build Selection Procedures as outlined in FAR Subpart 36.3. A site visit will be offered during Phase II of the two-phase selection process. Only one site visit is expected to be offered.

The solicitation is expected to be made available for download on the sam.gov Contract Opportunities website in January 2025. Offerors are responsible for checking the referenced page for any updates to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted at the referenced website. Proposals will be due approximately 30 days after the solicitation is posted. The exact proposal due date will be indicated in the solicitation.

System for Award Management (SAM): Offerors must register in the SAM at https://sam.gov/content/home prior to receiving an award.

Point of contact for this procurement is Preston Jones, Contract Specialist at Preston.E.Jones@usace.army.mil

All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).

The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1.

Use the Government-furnished Resident Management System (RMS) – Contractor Mode to record, maintain, and submit various information throughout the contract period. RMS is a Windows-based program capable of operating on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor at time of notice to proceed.

The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.

Summary Scope of Work

Design:

A 30% conceptual design package which conveys the Government’s design intent will be provided with the Phase II Solicitation. The design package will include plans, specifications, a geotechnical exploration report, and a recent site survey. The Contractor will be responsible for continuing this design package to completion. Contractor-generated CAD drawings must be in Bentley DGN format.

Construction:

Proposed construction features are divided into two primary categories: (1) wall repair/replacement and (2) vehicle and pedestrian bridge replacement. The project is a lava rock wall channel; the channel dimensions are approximately 24 feet wide, 8 feet deep, and 0.9 miles long.

Wall repair/replacement work may include: mortar repointing, concrete walls, concrete blocks, geotextiles, drainage culverts, irrigation systems, fencing, waterstop installation, road reconstruction, pavements, and pavement striping.

Bridge replacement work may include: demolition of roadway culverts, demolition of pedestrian bridges, traffic control, installation of new roadway bridges, installation of new pedestrian bridges, and road reconstruction.  The bridges will include reinforced concrete decks, railings, abutments, and wingwalls.

Update #2 ·

The U.S. Army Corps of Engineers (USACE) Walla Walla District intends to issue a construction solicitation for a project titled Little Wood River, Gooding, Idaho. The work is located in Gooding, Idaho. This will be a firm-fixed-price, design build construction contract. The magnitude of construction is between $25,000,000 and $100,000,000. 100% performance and payment bonds will be required. The government expects to award one contract in October 2025.  The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction and the associated small business size standard is $45 Million. This solicitation is not set aside for small business, i.e. unrestricted and open to both small and large businesses

The solicitation will follow the Two-Phase Design-Build Selection Procedures as outlined in FAR Subpart 36.3. A site visit will be offered during Phase II of the two-phase selection process. Only one site visit is expected to be offered.

The solicitation is expected to be made available for download on the sam.gov Contract Opportunities website in January 2025. Offerors are responsible for checking the referenced page for any updates to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted at the referenced website. Proposals will be due approximately 30 days after the solicitation is posted. The exact proposal due date will be indicated in the solicitation.

System for Award Management (SAM): Offerors must register in the SAM at https://sam.gov/content/home prior to receiving an award.

Point of contact for this procurement is Preston Jones, Contract Specialist at Preston.E.Jones@usace.army.mil

All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).

The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1.

Use the Government-furnished Resident Management System (RMS) – Contractor Mode to record, maintain, and submit various information throughout the contract period. RMS is a Windows-based program capable of operating on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor at time of notice to proceed.

The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.

Summary Scope of Work

Design:

A 30% conceptual design package which conveys the Government’s design intent will be provided with the Phase II Solicitation. The design package will include plans, specifications, a geotechnical exploration report, and a recent site survey. The Contractor will be responsible for continuing this design package to completion. Contractor-generated CAD drawings must be in Bentley DGN format.

Construction:

Proposed construction features are divided into two primary categories: (1) wall repair/replacement and (2) vehicle and pedestrian bridge replacement. The project is a lava rock wall channel; the channel dimensions are approximately 24 feet wide, 8 feet deep, and 0.9 miles long.

Wall repair/replacement work may include: mortar repointing, concrete walls, concrete blocks, geotextiles, drainage culverts, irrigation systems, fencing, waterstop installation, road reconstruction, pavements, and pavement striping.

Bridge replacement work may include: demolition of roadway culverts, demolition of pedestrian bridges, traffic control, installation of new roadway bridges, installation of new pedestrian bridges, and road reconstruction.  The bridges will include reinforced concrete decks, railings, abutments, and wingwalls.

Update #1 ·

The U.S. Army Corps of Engineers (USACE) Walla Walla District intends to issue a construction solicitation for a project titled Little Wood River, Gooding, Idaho. The work is located in Gooding, Idaho. This will be a firm-fixed-price, design build construction contract. The magnitude of construction is between $25,000,000 and $100,000,000. 100% performance and payment bonds will be required. The government expects to award one contract in October 2024.  The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction and the associated small business size standard is $45 Million. This solicitation is not set aside for small business, i.e. unrestricted and open to both small and large businesses

The solicitation will follow the Two-Phase Design-Build Selection Procedures as outlined in FAR Subpart 36.3. A site visit will be offered during Phase II of the two-phase selection process. Only one site visit is expected to be offered.

The solicitation is expected to be made available for download on the sam.gov Contract Opportunities website in January 2024. Offerors are responsible for checking the referenced page for any updates to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted at the referenced website. Proposals will be due approximately 30 days after the solicitation is posted. The exact proposal due date will be indicated in the solicitation.

System for Award Management (SAM): Offerors must register in the SAM at https://sam.gov/content/home prior to receiving an award.

Point of contact for this procurement is Preston Jones, Contract Specialist at Preston.E.Jones@usace.army.mil

All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).

The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1.

Use the Government-furnished Resident Management System (RMS) – Contractor Mode to record, maintain, and submit various information throughout the contract period. RMS is a Windows-based program capable of operating on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor at time of notice to proceed.

The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.

Summary Scope of Work

Design:

A 30% conceptual design package which conveys the Government’s design intent will be provided with the Phase II Solicitation. The design package will include plans, specifications, a geotechnical exploration report, and a recent site survey. The Contractor will be responsible for continuing this design package to completion. Contractor-generated CAD drawings must be in Bentley DGN format.

Construction:

Proposed construction features are divided into two primary categories: (1) wall repair/replacement and (2) vehicle and pedestrian bridge replacement. The project is a lava rock wall channel; the channel dimensions are approximately 24 feet wide, 8 feet deep, and 0.9 miles long.

Wall repair/replacement work may include: mortar repointing, concrete walls, concrete blocks, geotextiles, drainage culverts, irrigation systems, fencing, waterstop installation, road reconstruction, pavements, and pavement striping.

Bridge replacement work may include: demolition of roadway culverts, demolition of pedestrian bridges, traffic control, installation of new roadway bridges, installation of new pedestrian bridges, and road reconstruction.  The bridges will include reinforced concrete decks, railings, abutments, and wingwalls.

Similar open opportunities

Opportunity Agency Set-aside Responses due
Camp wooten/starbuck levee rehab Starbuck, Washington 99359, United States · NAICS 237990 ENDIST Walla Walla No set-aside
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation NAICS 332812 ENDIST Walla Walla Total Small Business
ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 Coeur d Alene, Idaho, United States · NAICS 237310 Federal Highway Administration No set-aside
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement Cascade Locks, Oregon 97014, United States · NAICS 237310 ENDIST Portland Total Small Business