Littcarr Campground Bridge Slope Protection at Carr Creek Lake, Kentucky
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912QR23Q0098
- Agency
-
ENDIST Louisville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238910 Site Preparation Contractors
- Place of performance
- Sassafras, Kentucky 41759, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The contractor is required to provide all necessary personnel, equipment, supplies, and materials to place slope protection rock on both upstream and downstream slopes and underneath each side of the Littcarr Campground bridge in Sassafras, Kentucky. The contractor's responsibilities also include planning, programming, administration, management, supervision, communications, and inspection to ensure compliance with contract requirements and all applicable laws and regulations. The work will not commence until after 1 December, with specific tasks including placing Class III Channel Liner stone at specified locations and depths around the bridge.
Products and Services to be provided:
- Personnel for project execution.
- Equipment and supplies for slope protection.
- Class III Channel Liner stone for slope protection.
- Project management services including planning, programming, administration, and supervision.
- Compliance and inspection services to ensure adherence to contract requirements and laws.
Notice text
The contractor shall furnish all personnel, equipment, supplies and materials necessary to place slope protection (Class III Rip Rap) rock on both upstream and downstream slopes and underneath each side of the Littcarr Campground bridge located at Carr Creek Lake, Sassafras, Kentucky. Prices should include mobilization & demobilization, fuel, labor, material, and equipment. The contractor will not start work until after Winter Drawn Down, 1 December, elevation 1,017 above mean sea level (AMSL). The contractor’s work and responsibility shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations.
LINE ITEM 0001: Littcarr Campground Bridge Abutment.
Westside Bridge Abutment:
1) The contractor will place Class III Channel Liner stone from the north edge of the bridge approximately
sixty five feet (65’) upstream and approximately fifteen feet (15’) from Elevation 1,017 above mean sea
level (AMSL) up the embankment to Elevation 1,028.5 AMSL. Total depth of the Class III channel Liner
will be at a minimum of twenty four inches (24”).
2) The contractor will place Class III Channel Liner stone from the south edge of the bridge approximately
seventy feet (70’) downstream and approximately fifteen feet (15’) from Elevation 1,017 above mean sea
level (AMSL) up the embankment to Elevation 1,028.5 AMSL. Total depth of the Class III channel Liner
will be at a minimum of twenty four inches (24”).
3) The contractor will place Class III Channel Liner stone underneath the bridge from elevation 1,017 AMSL
to bridge abutment. Total depth of the Class III channel Liner will be at a minimum of twenty four inches
(24”) where applicable.
LINE ITEM 0002: Littcarr Campground Bridge Abutment.
Eastside Bridge Abutment:
1) The contractor will place Class III Channel Liner stone from the north edge of the bridge approximately
thirty five feet (35’) upstream and approximately fifteen feet (15’) from Elevation 1,017 above mean sea
level (AMSL) up the embankment to Elevation 1,028.5 AMSL. Total depth of the Class III channel Liner
will be at a minimum of twenty four inches (24”).
2) The contractor will place Class III Channel Liner stone from the south edge of the bridge approximately
forty feet (40’) downstream and approximately fifteen feet (15’) from Elevation 1,017 above mean sea
level (AMSL) up the embankment to Elevation 1,028.5 AMSL. Total depth of the Class III channel Liner
will be at a minimum of twenty four inches (24”).
3) The contractor will place Class III Channel Liner stone underneath the bridge from elevation 1,017 AMSL
to bridge abutment. Total depth of the Class III channel Liner will be at a minimum of twenty four inches
(24”) where applicable.
Files
| File | Type | Posted |
|---|---|---|
| West Bank Underneath Looking Upstream.JPG | JPG image | |
| West Bank Downstream.JPG | JPG image | |
| IMG_0574.JPG | JPG image | |
| East Bank Downstream.JPG | JPG image | |
| West Bank Upstream.JPG | JPG image | |
| East Bank Underneath Looking Downstream.JPG | JPG image | |
| East Bank Underneath Looking Upstream.JPG | JPG image | |
| West Bank Underneath Looking Upstream2.JPG | JPG image | |
| West Bank Underneath Looking Upstream1.JPG | JPG image | |
| IMG_0570.JPG | JPG image | |
| W912QR23Q0098.pdf |
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| Littcarr Campground Bridge Slope Protection at Carr Creek Lake, Kentucky | Award Notice | |
| This notice | Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity