Lever assembly, axle, in repair/modification of
Closed Solicitation Posted
- Solicitation number
- N0038323QB113
- Agency
-
Naval Supply Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 333998 All Other Miscellaneous General Purpose Machinery Manufacturing
- PSC
- 1620 Aircraft Landing Gear Components
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
CONTACT INFORMATION|4|N733.08|N00383|215-697-4337|Sarah.F.Pfeil.Civ@Us.Navy.Mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X||||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Invoice and Receiving Report Combo|Invoice and Receiving Report Combo|TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
EQUAL OPPORTUNITY (SEP 2016)|2|||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 Days|45 days of the last delivery under this contract|||||
EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3||||
LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3||||
BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1||
ROYALTY INFORMATION (APR 1984)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|336413|1,250||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X DO rated order certified for national defense|
The purpose of this amendment is to incorporate the following changes:
1. The total quantity is increased by 1 unit, from 2 units to 3 units.
All other terms and conditions remain the same.
This contract/delivery order/purchase order/modification is issued by the Government when deposited in the mail, transmitted by facsimile or sent by any electronic commerce method, including email. The Government's acceptance of the contractor's proposal
constitutes bilateral agreement to issue this contract/delivery order/purchase order/modification.
\
The Small Business Administration representative at NAVSUP WSS has reviewed this requirement and determined that a set-aside recommendation was not applicable for this procurement.
This RFQ is for repair and will be using competitive procedures.
The requested RTAT is 252.9 days.
This requirement will be awarded to the offeror with the lowest price technically acceptable (LPTA) quote.
Quotes may be emailed to the below email address and must be received on or before on the closing date listed on page 1 of the solicitation.
Sarah.f.pfeil.civ@us.navy.mil.
\
1. SCOPE
REPAIR MANUAL/PROCEDURES
Overhaul IAW with the following Government Furnished Information (GFI) Technical Data:
MAIN LANDING LEVER ASSEMBLY
P/N: (76301)74A410506-1009/-1010/-1011/-1012
LES-NI-31026-92 / Revision B Release 21 FEB 2018
Technical Manual, Main Landing Gear Axle Lever Assembly, A1-422AC-130-050
Intermediate and Depot Level Technical Manuals A1-F18AC-SRM-300 Nondestructive Inspection WP069 05
Part Drawings (76301) 74A410506
Boeing Process Specifications (PS)
1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document.
1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be
provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this
procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer.
1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by
IPC/EIAJ-STD-001C paragraph 5.1.4.
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS
Main Landing Gear Lever Assembly LES (LES-NI-31026-92 / Amendment 3) Additional QA Characteristics, See Hard copy Statement of work dated
21 Feb 2018
4. QUALITY ASSURANCE
First Article Inspection Requirements:
NAVAIR Landing Gear Engineer(s) or its designated government representative will witness First Article assembly and testing. Contractor is responsible for providing the necessary personal and resources to expedite the First Article assembly and testing.
Notification
At least 45 days before beginning of First Article Testing, the contractor must notify the PCO, in writing, of the time and location of the testing so that the Government may witness the testing. In addition to the PCO, the contractor must notify the Navy First
Article Test manager via e-mail at navsupwssp_fat_mgr@navy.mil so that the Navy may witness the FAT or delegate FAT approval to DCMA QAR, according to the discretion of the Navy.
U.S. Government personnel, including the DCMA QAR and NAVAIR Landing Gear Engineer(s) or its designated government representative, will witness testing at the contractor's facility.
Inspection records and completed router/traveler must be submitted for review prior to assembly. The router/traveler approval will be provided by NAVAIR Landing Gear Engineer or its designated government representative. Upon approval contractor is responsible
to coordinate with PCO and NAVAIR Landing Gear Engineer(s) for onsite inspection/and witness of First Article Test.
Test Report
The FAT Report must be in accordance with the requirements of AS9102 (Aerospace First Article Inspection Requirement), MIL-HDBK-831 or equivalent, and must be submitted via the cognizant DCMA Contract Administration Office to the PCO. The contractor must submit
the FAT Report via the PCO within 15 days from the date of completion of First Article Testing to NAVAIR Landing Gear Engineers for approval.
At a minimum, the following processes will be demonstrated by witnessing NAVAIR Landing Gear Engineer
Bearing and Bushing Removal
Bearing and Bushing Installation
Strip Electroplated Coating
Degreasing
Temper Etch for Burns
Magnetic Particle Inspection
Cadmium, Nickel and/or Chrome plating as required
Machining
Abrasive Blasting
Shot Peening
Dimensional Inspection
Magnetoelastic (Rollscan)
X-ray Diffraction (XRD)
Ultrasonic Inspection
Penetrant Inspection
NAVAIR Landing Gear Engineer may waive demonstration requirements for any specific processes, in lieu of verification of Certificates of Conformance. NAVAIR Landing Gear Engineer or its designated government representative must provide First Article Acceptance
or the necessary path to Acceptance prior to production.
5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.
Block 9: Statement B, US Government, Naval Inventory Control Point
Block 12: First submission to be made upon submission of ;FAT; testing sample.
^ Block 14: Make submission to ;NAVAIR LANDING GEAR ENGINEER
NAVSUP CODE N23
DCMA-QAR; .
Block 13: Second submission required if the process/operation changes after approval of ;FAT; test.
^^ Block 14: Make submission to ;NAVAIR LANDING GEAR ENGINEER
NAVSUP CODE N23
DCMA-QAR ; .
Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.
Block 9: Statement B, US Government, Naval Inventory Control Point
Block 12: First submission to be made upon submission of ;FAT; testing sample.
^ Block 14: Make submission to ;NAVAIR LANDING GEAR ENGINEER
NAVSUP CODE N23
DCMA-QAR ; .
Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
Block 6: Forward additional copy to ASO code cited in Block 10.A on page 1. 1. This Data Item Description (DID) contains the format, content and preparation instructions for the
data product resulting from the work task described in paragraph 5.4.3.4 or 5.4.8.3.3 of MIL-STD-973. 2. Copies of the Request for Waiver form are available from the DODSSP, Standardization Documents Order Desk, Building 40, 700 Robbins Avenue,
Philadelphia, PA 19111-5094 3. Format an Content: The request for Deviation format and content shall be in accordance with Appendix E of MIL-STD-973
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.
Block 9: Statement B, US Government, Naval Inventory Control Point
Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1.
Block 3: Separate reports shall be provided for the below listed subtitles and shall include certification that all vendors performing these processes are prime (OEM) approved sources. In the case where other than the OEM's specifications are to be utilized,
separate certifications are required.
BLOCK #5: Contract Reference:
;Material and process subcontractors must be approved by Boeing in accordance with Boeing Approved Vendor list D1-4426.;
Update #1 ·
CONTACT INFORMATION|4|N733.08|N00383|215-697-4337|Sarah.F.Pfeil.Civ@Us.Navy.Mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X||||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Invoice and Receiving Report Combo|Invoice and Receiving Report Combo|TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
EQUAL OPPORTUNITY (SEP 2016)|2|||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 Days|45 days of the last delivery under this contract|||||
EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3||||
LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3||||
BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1||
ROYALTY INFORMATION (APR 1984)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|336413|1,250||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X DO rated order certified for national defense|
The Small Business Administration representative at NAVSUP WSS has reviewed this requirement and determined that a set-aside recommendation was not applicable for this procurement.
This RFQ is for repair and will be using competitive procedures.
The requested RTAT is 252.9 days.
This requirement will be awarded to the offeror with the lowest price technically acceptable (LPTA) quote.
Quotes may be emailed to the below email address and must be received on or before on the closing date listed on page 1 of the solicitation.
Sarah.f.pfeil.civ@us.navy.mil.
\
1. SCOPE
REPAIR MANUAL/PROCEDURES
Overhaul IAW with the following Government Furnished Information (GFI) Technical Data:
MAIN LANDING LEVER ASSEMBLY
P/N: (76301)74A410506-1009/-1010/-1011/-1012
LES-NI-31026-92 / Revision B Release 21 FEB 2018
Technical Manual, Main Landing Gear Axle Lever Assembly, A1-422AC-130-050
Intermediate and Depot Level Technical Manuals A1-F18AC-SRM-300 Nondestructive Inspection WP069 05
Part Drawings (76301) 74A410506
Boeing Process Specifications (PS)
1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document.
1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be
provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this
procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer.
1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by
IPC/EIAJ-STD-001C paragraph 5.1.4.
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS
Main Landing Gear Lever Assembly LES (LES-NI-31026-92 / Amendment 3) Additional QA Characteristics, See Hard copy Statement of work dated
21 Feb 2018
4. QUALITY ASSURANCE
First Article Inspection Requirements:
NAVAIR Landing Gear Engineer(s) or its designated government representative will witness First Article assembly and testing. Contractor is responsible for providing the necessary personal and resources to expedite the First Article assembly and testing.
Notification
At least 45 days before beginning of First Article Testing, the contractor must notify the PCO, in writing, of the time and location of the testing so that the Government may witness the testing. In addition to the PCO, the contractor must notify the Navy First
Article Test manager via e-mail at navsupwssp_fat_mgr@navy.mil so that the Navy may witness the FAT or delegate FAT approval to DCMA QAR, according to the discretion of the Navy.
U.S. Government personnel, including the DCMA QAR and NAVAIR Landing Gear Engineer(s) or its designated government representative, will witness testing at the contractor's facility.
Inspection records and completed router/traveler must be submitted for review prior to assembly. The router/traveler approval will be provided by NAVAIR Landing Gear Engineer or its designated government representative. Upon approval contractor is responsible
to coordinate with PCO and NAVAIR Landing Gear Engineer(s) for onsite inspection/and witness of First Article Test.
Test Report
The FAT Report must be in accordance with the requirements of AS9102 (Aerospace First Article Inspection Requirement), MIL-HDBK-831 or equivalent, and must be submitted via the cognizant DCMA Contract Administration Office to the PCO. The contractor must submit
the FAT Report via the PCO within 15 days from the date of completion of First Article Testing to NAVAIR Landing Gear Engineers for approval.
At a minimum, the following processes will be demonstrated by witnessing NAVAIR Landing Gear Engineer
Bearing and Bushing Removal
Bearing and Bushing Installation
Strip Electroplated Coating
Degreasing
Temper Etch for Burns
Magnetic Particle Inspection
Cadmium, Nickel and/or Chrome plating as required
Machining
Abrasive Blasting
Shot Peening
Dimensional Inspection
Magnetoelastic (Rollscan)
X-ray Diffraction (XRD)
Ultrasonic Inspection
Penetrant Inspection
NAVAIR Landing Gear Engineer may waive demonstration requirements for any specific processes, in lieu of verification of Certificates of Conformance. NAVAIR Landing Gear Engineer or its designated government representative must provide First Article Acceptance
or the necessary path to Acceptance prior to production.
5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.
Block 9: Statement B, US Government, Naval Inventory Control Point
Block 12: First submission to be made upon submission of ;FAT; testing sample.
^ Block 14: Make submission to ;NAVAIR LANDING GEAR ENGINEER
NAVSUP CODE N23
DCMA-QAR; .
Block 13: Second submission required if the process/operation changes after approval of ;FAT; test.
^^ Block 14: Make submission to ;NAVAIR LANDING GEAR ENGINEER
NAVSUP CODE N23
DCMA-QAR ; .
Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.
Block 9: Statement B, US Government, Naval Inventory Control Point
Block 12: First submission to be made upon submission of ;FAT; testing sample.
^ Block 14: Make submission to ;NAVAIR LANDING GEAR ENGINEER
NAVSUP CODE N23
DCMA-QAR ; .
Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
Block 6: Forward additional copy to ASO code cited in Block 10.A on page 1. 1. This Data Item Description (DID) contains the format, content and preparation instructions for the
data product resulting from the work task described in paragraph 5.4.3.4 or 5.4.8.3.3 of MIL-STD-973. 2. Copies of the Request for Waiver form are available from the DODSSP, Standardization Documents Order Desk, Building 40, 700 Robbins Avenue,
Philadelphia, PA 19111-5094 3. Format an Content: The request for Deviation format and content shall be in accordance with Appendix E of MIL-STD-973
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.
Block 9: Statement B, US Government, Naval Inventory Control Point
Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1.
Block 3: Separate reports shall be provided for the below listed subtitles and shall include certification that all vendors performing these processes are prime (OEM) approved sources. In the case where other than the OEM's specifications are to be utilized,
separate certifications are required.
BLOCK #5: Contract Reference:
;Material and process subcontractors must be approved by Boeing in accordance with Boeing Approved Vendor list D1-4426.;
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Lever assembly, axle, in repair/modification of | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity