Letter Contract Emergency Pump Replacement
Awarded Award Notice Posted
A newer special notice was posted. See the latest special notice from .
- Solicitation number
- 191BWC23C0019
- Awarded
- to Veolia Water West Operating Services Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- 191BWC23C0019 Federal contract award
- NAICS code
- 221320 Sewage Treatment Facilities
- Place of performance
- San Diego, California 92154, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This Award Notice from the International Boundary and Water Commission U.S.-Mexico awarded a $1.5 million letter contract to an undisclosed recipient for the emergency replacement of failed pumps at the South Bay International Wastewater Treatment Plant. The letter contract utilizes a $1 million ceiling and 90-day initial performance period to replace waste activated sludge pumps, activated sludge tank intermediate mixed liquor pumps, and non-potable water pumps damaged by Hurricane Hillary in order to restore wastewater treatment operations and avoid permit violations resulting from untreated discharges to local waterways.
Notice text
Before Hurricane Hillary, SBIWTP needed rehabilitation and expansion due to excessive flows coming from Mexico. The Tijuana River and Ocean by San Diego contain unsafe amounts sewage forcing the Beaches to close. The Hurricane further damaged the plant. Without these repairs the Plant highly likely to fail if subjected to another storm before these repairs can be made and result in an even larger discharge of raw sewage.
Replace Waste Activated Sludge (WAS) Pumps, Activated Sludge Tanks (AST) Intermediate Mixed Liquor Pumps, and non-potable water pumps at SBIWTP. WAS pump failure would lead to partially treated sewage not meeting permit standards discharged through ocean outfall, leading to permit violations. AST and non-potable water pump failures would lead to effluent quality not meeting permit standards being discharged through ocean outfall, leading to permit violations.
Tropical Storm Hilary exacerbated the vulnerabilities of an already at-risk treatment plant, accelerating damage primarily through excessive flows and an influx of debris. Trash, sediment, and debris were carried by the excessive flows into pumps throughout the plant. This entanglement of trash in impellers and check valves caused pump failures.
Awarded contract 191BWC23C0019 to VEOLIA WATER WEST OPERATING SERVICES INC for 1500000.00 on 2023-09-30.
Attachments
| File | Type | Posted |
|---|---|---|
| Sole Source Redacted.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Definitize Letter Contract Emergency Pump Replacement | Special Notice | |
| Letter Contract Emergency Pump Replacement | Award Notice |