LED lights at Naval Weapons Station EARLE in Colts Neck, NJ - AMENDMENT 4 - Q&A
Closed Solicitation Posted
- Solicitation number
- 70FBR225Q00000040
- Agency
-
FEMA Preparedness Section
Federal Emergency Management Agency, Department of Homeland Security
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Place of performance
- Colts Neck, New Jersey 07722, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Emergency Management Agency (FEMA) is seeking to replace current fluorescent lights with LED lights in the office area at Building C-54 at Naval Weapons Station EARLE in Colts Neck, New Jersey. This lighting upgrade project is necessary to provide a well-lit office environment that meets both energy efficiency and OSHA requirements as FEMA staff returns to full-time office work. The contract scope includes pre-installation assessment, procurement and installation of LED fixtures meeting specific quality standards (4000-5000K color temperature, CRI of 80+), and integration of occupancy sensors and dimmers in conference rooms. The procurement will be awarded on a best-value basis considering four evaluation factors: Technical Approach, Quality Control Plan, Past Performance, and Price, with non-price factors being slightly more important than price. Questions are due by August 14th at 5pm EST, site visits are scheduled for August 4th and 5th at 11 AM EST, and proposals are due August 19th, 2025.
This procurement is designated as a total small business set-aside under NAICS code 238210 for Electrical Contractors and Other Wiring Installation Contractors. The project involves replacing approximately 190 2x4 LED fixtures and 25 2x2 LED fixtures throughout the facility, including office areas, conference rooms, hallways, and support spaces such as server rooms and supply areas. The contract has a one-year performance period with work to be completed between 0700-1700 EST, Monday through Friday. All work must be performed at Naval Weapons Station EARLE in Colts Neck, New Jersey, and contractors must comply with Navy security requirements including completion of NAVSEC5512 forms and meeting specific entry requirements such as US citizenship, English proficiency, Real ID, and clean background checks. The solicitation does not specify the contract value, but the comprehensive nature of the lighting replacement project throughout Building C-54 suggests a substantial scope of work.
Notice text
5 versions
Update #5 · Latest ·
The Federal Emergency Management Agency (FEMA) is seeking to replace current fluorescent lights with LED lights in the office area at Building C-54 at Naval Weapons Station EARLE in Colts Neck, NJ. As the FEMA staff returns to the office full time, FEMA is required to provide a well-lit office that meets both energy and OSHA requirements
QUESTIONS DUE: August 14th 5pm EST
Item Specs:
22-OVHP-LED is 2x2
24-OVHP-LED is 2x4
Q&A:
Q: Where are the circuit breakers for lights located?
A: Located in 2 locations. Janitorial closet in the front of the office and the mechanical room located on the side of building new generator, only entrance is outside.
Q: What are security lights?
A: These are the lights that stay on all the time, light fixtures remain the same. Qty 4 4x2 and Qty 2 2x2
Q: Who will handle the relocation of desks and equipment?
A: FEMA IT and Logistics will handle the relocation of desks and equipment to ensure the contractor has access to the light fixtures.
Q: Can FEMA provide on number of dimmers required and where they will be placed?
A: All Conference rooms are required to have dimmers.
Q: Does FEMA want occupancy sensors, and if so, where will they be located? Quantity?
A: All conference rooms are required to have.
Q: What will be required in each conference room and which conference room?
A: Lights/ Occupancy sensors/ dimmers
Q: Are we matching the existing dimmers and if so, which ones?
A: We are not matching anything. We have to install new ones in conference rooms.
Q: Does the conference rooms have dimmers in them, and if so, which conference rooms(s)?
A: None of the conference rooms have dimmers.
Q: Is it possible to know how many LED lights you need/are left to change?
A: Floor plan with the LED lights that needs to be changed has been provided
Q: Is this being done during normal business hours? What hours?
A:See attached SOW section 4.4 Hours of Operation for specific details.
Q: Does the server room need to be changed out?
A: It is part of the scope.
Q: Conference room (CR2) looks like mercury vapor metal halos – are we changing those out as well?
A: All lights shown on the floor plan are part of the scope.
Q: Conference room (JF01) in the back – are we changing those too?
A: All lights shown on the floor plan are part of the scope.
Notes: The only conference rooms left to upgraded to LED are JFO1 and CR2 (the two rooms in the front have the 2x2 and recess lighting).
The lights that were installed, have a switch or some that you can select a setting on the fixture, all the lights are on the lower setting.
Q. Can you please confirm the total overhead light count that is to be replaced by referencing it on the provided ceiling plan (either by circling or highlighting the remaining to be updated) ?
A. Please reference attachment, titled, “FEMA C-54, Floor Plan,” for full counts. Quantity is at the bottom for all needed 2x2’s and 2x4’s, as well as flood and singles.
Q. During site visit, COR pointed out that some of the building overhead lighting was replaced with LED (mainly 2x4), were 2x2 lighting fixtures also updated to LED ?
A: No, none.
Q: For the new LED replacements are you requiring the Electrical Contractor (EC) to replace the Fluorescent 2x4's and 2x2's to match the newer LED 2x4's and 2x2s that were replaced or are the new LED fixtures TBD by EC ?
A: Must be new LED, but it does not have to match existing. Will leave up to EC to determine.
Q: If you are requiring the new 2x4's and 2x2's to match the existing LED fixtures, can you please provide the spec sheet or make and model for the LED's already in place ?
A: 22-OVHP-LED is 2x2, 24-OVHP-LED is 2x4
Q: After removing some ceiling tiles, we verified that existing and newer LED light fixtures were secured to the ceiling grid and NOT to framing members or actual ceiling. NEC Article 410.36 allows light fixtures to be supported by ceiling grid with proper fasteners in commercial suspended ceiling grid. The existing lay-in ceiling lights are NEC Code Compliant.
1a. For the new fixtures to be installed we want to confirm the method of securing them:
1b. Are we supporting / securing the new ceiling lights to the existing ceiling grid ? OR
1c. Are we supporting / securing the new ceiling lights to the actual Concrete ceiling above the ceiling grid ? OR
1d. Are we supporting / securing the new ceiling lights to the metal truss system / overhead metal framing members ?
A: Please match the existing layout.
Q. Do the new light fixtures need dimming capability ?
A. Dimmers only for conference rooms.
Q. Is there a wattage requirement for the new fixtures ?
A. Please match existing.
Q: What are the amount of LED lights that needs to be replaced?
A:
- 2x2 - 25
- 2x4 - 190
- Recessed flood fixtures - 12
- Single light fixtures - 14
- How many conference rooms are there? 2 JFO1 and CR2 these rooms have the 2x2 and recessed flood fixtures
Update #4 ·
The Federal Emergency Management Agency (FEMA) is seeking to replace current fluorescent lights with LED lights in the office area at Building C-54 at Naval Weapons Station EARLE in Colts Neck, NJ. As the FEMA staff returns to the office full time, FEMA is required to provide a well-lit office that meets both energy and OSHA requirements
QUESTIONS DUE: August 11th 5pm EST
Item Specs:
22-OVHP-LED is 2x2
24-OVHP-LED is 2x4
Please see attached floorplan
Update #3 ·
The Federal Emergency Management Agency (FEMA) is seeking to replace current fluorescent lights with LED lights in the office area at Building C-54 at Naval Weapons Station EARLE in Colts Neck, NJ. As the FEMA staff returns to the office full time, FEMA is required to provide a well-lit office that meets both energy and OSHA requirements
SITE VISITS: Site visits will be held August 4th, 2025 and August 5th, 2025, 11 AM EST. Location will be NWSE Earle, 201 Route 34 S, Building C54, Colts Neck NJ. Attendees will need to fill out NAVSEC5512 form to enter the base. Attendees must be a US Citizen, English speaking, have Real ID, and clean background check. Please send email confirmation to kendall.feaster@fema.dhs.gov including which date will be attended. Site visit Point of Contact: Ellen Gallagher, ellen.gallagher@fema.dhs.gov, (202) 805-9088
QUESTIONS DUE: August 7th 5pm EST
Update #2 ·
The Federal Emergency Management Agency (FEMA) is seeking to replace current fluorescent lights with LED lights in the office area at Building C-54 at Naval Weapons Station EARLE in Colts Neck, NJ. As the FEMA staff returns to the office full time, FEMA is required to provide a well-lit office that meets both energy and OSHA requirements
QUESTIONS DUE: July 30th 5pm EST
Update #1 ·
The Federal Emergency Management Agency (FEMA) is seeking to replace current fluorescent lights with LED lights in the office area at Building C-54 at Naval Weapons Station EARLE in Colts Neck, NJ. As the FEMA staff returns to the office full time, FEMA is required to provide a well-lit office that meets both energy and OSHA requirements
Files
| File | Type | Posted |
|---|---|---|
| FEMA C-54 Floor Plan.pdf | ||
| 1 - SECNAV_ 5512_New_31MAY24.pdf | ||
| 2.4.1 Sol_70FBR225Q00000039_Amd_0003.pdf | ||
| 1.10.1 Wage Determination.pdf | ||
| 1.1.3 SOW - NWSE Earle LED Light replacement BPA No COR.docx | DOCX document | |
| 1.6.3 Evaluation Factors LED Light Replacement.docx | DOCX document | |
| 2.4.1 Sol_70FBR225Q00000039_Amd_0001.pdf |