Leavenworth Reach & Kansas City Reach Navigation Obstruction Removal (MO River BSNP FY23)
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912DQ23B1039
- Agency
-
ENDIST Kansas City
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Kansas City District is soliciting proposals under solicitation number W912DQ23B1039 to provide navigation obstruction removal services on the Missouri River between Leavenworth, Kansas and Kansas City, Missouri. The solicitation seeks the dismantling, demolition, removal and disposal of submerged bridge piers, rock outcroppings, debris and other obstructions impeding vessel traffic. Offerors must be in full compliance with Clean Water Act permits and complete all work within 270 calendar days of award. Bids are due by August 16, 2023.
The solicitation is set aside for total small businesses and has a projected value between $1-5 million. Three offerors submitted bids by the August 17, 2023 deadline: Bloomsdale Excavating, Contractor A, and Contractor B. Bloomsdale Excavating offered to complete all work for $628,960 within one job. Contractor A proposed performing the work in two jobs valued at $229,877 and $293,147, respectively. The place of performance is along the Missouri River between river miles 365 to 397.6 in Kansas and Missouri.
Notice text
5 versions
Update #5 · Latest ·
The contractor shall remove navigation obstructions on the Missouri River to include the remaining foundation of old bridge piers, tributary debris, and rock outcropping. The obstruction areas are betw een RM 397 to RM 365. The general scope of the work includes, but is not limited to: dismantling, demolition, removal, and disposal of navigation obstructions. Work consists of mobilization to the obstruction areas w ith appropriate removal equipment and the low ering of obstructions to the elevations specified or as directed by the Contracting Officer. All work to be performed will be completed by floating plant as no land access will be available. Mechanical methods will be used for removal of the obstructions. Contractor shall be required to be in full compliance with state and federal Clean Water Act Guidelines (Sections 404(b)(1) and 401 water quality permits). Excavation of rock outcropping shall not occur between 01 April through the following 30 June to avoid impact on the spawning season of federally protected pallid sturgeon.
Amendment 0001 posted. See attachment for details.
Amendment 0002 Posted. See attachment for Details.
Questions and Answers from PROJNET also posted in attachments.
Amendment 0003 posted. See attachment for details.
Abstract of Offers posted. See attachment for details.
Update #4 ·
The contractor shall remove navigation obstructions on the Missouri River to include the remaining foundation of old bridge piers, tributary debris, and rock outcropping. The obstruction areas are betw een RM 397 to RM 365. The general scope of the work includes, but is not limited to: dismantling, demolition, removal, and disposal of navigation obstructions. Work consists of mobilization to the obstruction areas w ith appropriate removal equipment and the low ering of obstructions to the elevations specified or as directed by the Contracting Officer. All work to be performed will be completed by floating plant as no land access will be available. Mechanical methods will be used for removal of the obstructions. Contractor shall be required to be in full compliance with state and federal Clean Water Act Guidelines (Sections 404(b)(1) and 401 water quality permits). Excavation of rock outcropping shall not occur between 01 April through the following 30 June to avoid impact on the spawning season of federally protected pallid sturgeon.
Amendment 0001 posted. See attachment for details.
Amendment 0002 Posted. See attachment for Details.
Questions and Answers from PROJNET also posted in attachments.
Amendment 0003 posted. See attachment for details.
Update #3 ·
The contractor shall remove navigation obstructions on the Missouri River to include the remaining foundation of old bridge piers, tributary debris, and rock outcropping. The obstruction areas are betw een RM 397 to RM 365. The general scope of the work includes, but is not limited to: dismantling, demolition, removal, and disposal of navigation obstructions. Work consists of mobilization to the obstruction areas w ith appropriate removal equipment and the low ering of obstructions to the elevations specified or as directed by the Contracting Officer. All work to be performed will be completed by floating plant as no land access will be available. Mechanical methods will be used for removal of the obstructions. Contractor shall be required to be in full compliance with state and federal Clean Water Act Guidelines (Sections 404(b)(1) and 401 water quality permits). Excavation of rock outcropping shall not occur between 01 April through the following 30 June to avoid impact on the spawning season of federally protected pallid sturgeon.
Amendment 0001 posted. See attachment for details.
Amendment 0002 Posted. See attachment for Details.
Questions and Answers from PROJNET also posted in attachments.
Update #2 ·
The contractor shall remove navigation obstructions on the Missouri River to include the remaining foundation of old bridge piers, tributary debris, and rock outcropping. The obstruction areas are betw een RM 397 to RM 365. The general scope of the work includes, but is not limited to: dismantling, demolition, removal, and disposal of navigation obstructions. Work consists of mobilization to the obstruction areas w ith appropriate removal equipment and the low ering of obstructions to the elevations specified or as directed by the Contracting Officer. All work to be performed will be completed by floating plant as no land access will be available. Mechanical methods will be used for removal of the obstructions. Contractor shall be required to be in full compliance with state and federal Clean Water Act Guidelines (Sections 404(b)(1) and 401 water quality permits). Excavation of rock outcropping shall not occur between 01 April through the following 30 June to avoid impact on the spawning season of federally protected pallid sturgeon.
Amendment 0001 posted. See attachment for details.
Update #1 ·
The contractor shall remove navigation obstructions on the Missouri River to include the remaining foundation of old bridge piers, tributary debris, and rock outcropping. The obstruction areas are betw een RM 397 to RM 365. The general scope of the work includes, but is not limited to: dismantling, demolition, removal, and disposal of navigation obstructions. Work consists of mobilization to the obstruction areas w ith appropriate removal equipment and the low ering of obstructions to the elevations specified or as directed by the Contracting Officer. All work to be performed will be completed by floating plant as no land access will be available. Mechanical methods will be used for removal of the obstructions. Contractor shall be required to be in full compliance with state and federal Clean Water Act Guidelines (Sections 404(b)(1) and 401 water quality permits). Excavation of rock outcropping shall not occur between 01 April through the following 30 June to avoid impact on the spawning season of federally protected pallid sturgeon.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Leavenworth Reach & Kansas City Reach Navigation Obstruction Removal (MO River BSNP FY23) | Award Notice | |
| This notice | Solicitation | |
| MO River Obstructions, W912DQ23B1039 | Pre-Solicitation | |
| W912DQ23B1039 MO River Obstruction | Pre-Solicitation |