LC doane project - 6 NSN's

Closed Pre-Solicitation Posted

Solicitation number
SPE4A6-20-R-0462
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
335121 Residential Electric Lighting Fixture Manufacturing
PSC
6210 Indoor And Outdoor Electric Lighting Fixtures
Place of performance
Richmond VA 23219 USA

Notice details come from SAM.gov. Updated .

Notice text

SYNOPSIS

Purchase Request Number / IQC 1000097805.  The Small Business Set-Aside solicitation will be issued under PR number 1000097805 to establish an Indefinite Quantity Contract (IQC) unrestricted. NAICS 335121.  The   contract   will   have a  two year  base  period  with  provisions  included  to  extend  the  term  of  the  contract for one option period of three years for a total performance period of 5 years. Requirement has six (6) NSNs.  Pricing will be based on the estimated annual demand.  Only offers from a Small Business will be considered. Please do not submit an offer unless you are a small business.

 

NSN: 6210-00-115-9137. Nomenclature: Fixture Lighting

IAW BASIC SPEC NR MIL‐F‐16377/58B(1) NOT 1

REVISION NR B DTD 08/02/1996

PART PIECE NUMBER: P/N: M16377/58‐352

Terms are FOB Destination, Inspection and Acceptance at Origin.  The contract will include an estimate annual demand quantity of 473 each.  The minimum   delivery   order   is 225 each and the estimate maximum annual order quantity is 473 each.  First Article Test (FAT) is required.  Government FAT applies.  Required total delivery is 266 days ARO (Submit Test Report 120 + Gov’t Review 90 + Production Items 56). 

NSN: 6210-00-159-9171. Nomenclature: FIXTURE, LIGHTING

IAW BASIC SPEC NR MIL‐F‐16377/58B(1) NOT 1

REVISION NR B DTD 08/02/1996

PART PIECE NUMBER: M16377/58‐351

Terms are FOB Destination, Inspection and Acceptance at Origin.  The contract will include an estimate annual demand quantity of 44 each.  The minimum   delivery   order   is 22 each and the estimate maximum annual order quantity is 44 each.  First Article Test (FAT) is required.  Contractor FAT applies.  Required total delivery is 165 days ARO (Submit Test Report 60 + Gov’t Review 30 + Production Items 75). 

NSN: 6150-00-115-9186. Nomenclature: FIXTURE, LIGHTING

IAW BASIC SPEC NR MIL‐DTL‐16377/57C

REVISION NR C DTD 06/30/2014

PART PIECE NUMBER: P/N: M16377/57‐348

Terms are FOB Destination, Inspection and Acceptance at Origin.  The contract will include an estimate annual demand quantity of 72 each. The minimum   delivery   order   is 35 each and the estimate maximum annual order quantity is 72 each.  First Article Test (FAT) is required.  Contractor FAT applies.  Required total delivery is 177 days (Submit Test Report 30 + Gov’t Review 60 + Production Items 87). 

NSN: 6230-00-244-3996. Nomenclature: LIGHT, EXTENSION

IAW BASIC SPEC NR MIL‐F‐16377/49A(1) NOT 1

REVISION NR A DTD 08/02/1996

PART PIECE NUMBER: P/N: M16377/49‐306‐2

Terms are FOB Destination, Inspection and Acceptance at Origin.  The contract will include an estimate annual demand quantity of 100 each.  The minimum   delivery   order   is 50 each and the estimate maximum annual order quantity is 100 each.  Contractor FAT applies.  Required total delivery is 321 days ARO (Submit Test Report 120 + Gov’t Review 60 + Production Items 141). 

NSN: 6210-01-509-3005. Nomenclature: FIXTURE, LIGHTING

IAW BASIC SPEC NR MIL‐DTL‐16377/74A

REVISION NR A DTD 06/30/2014

PART PIECE NUMBER: MIL‐DTL‐16377/74‐77.4‐R‐W

Terms are FOB Destination, Inspection and Acceptance at Origin.  The contract will include an estimate annual demand quantity of 22 each.  The minimum   delivery   order   is 11 each and the estimate maximum annual order quantity is 22 each.  Contractor FAT applies.  Required total delivery is 201 days ARO (Submit Test Report 120 + Gov’t Review 60 + Production Items 81).

NSN: 6210-01-509-3612. Nomenclature: FIXTURE, LIGHTING

IAW BASIC SPEC NR MIL‐DTL‐16377/75A

REVISION NR A DTD 06/30/2014

PART PIECE NUMBER: MIL‐DTL‐16377/75

Terms are FOB Destination, Inspection and Acceptance at Origin.  The contract will include an estimate annual demand quantity of 21 each.  The minimum   delivery   order   is115 each and the estimate maximum annual order quantity is 21 each.  Contractor FAT applies.  Required total delivery is 226 days ARO (Submit Test Report 120 + Gov’t Review 30 + Production Items 76).

The  final contract award decision may be  based  upon  a  combination  of  price,  past  performance  and  other  evaluation  factors  as  described  in  the  solicitation. The solicitation  issue  date  is  anticipated  to   be   July 6, 2020   and   the   solicitation closing  date  is  anticipated  to  be  August 5, 2020.  

The solicitation will include provision L09, Reverse Auction.  Since a Reverse Auction may be conducted, offerors are encouraged to access the Procurex system and review the Reverse Auction help tutorials at:  https://dla.procurexinc.com to learn more about how to participate in an auction.

A copy of the solicitation will be available via the DIBBS Website https://www.dibbs.bsm.dla.mil/ on the issue date cited in the RFP. From the DIBBS Homepage, select “Requests for Proposal (RFP) / Invitation for Bid (IFB)” from the menu under the tab “Solicitations.” Then search for and choose the RFP you wish to download. RFPs are in portable document format (PDF). To download and view these documents you will need the latest version of Adobe Acrobat Reader. This software is available free at: http://www.adobe.com. A paper copy of this solicitation will not be available to requestors.

If you have any questions concerning this opportunity please contact: brenda.spell@dla.mil.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors