Launch-able Tagline and Remote Anchor System
Closed Solicitation Posted
- Solicitation number
- A12-057
- Agency
-
PEO CSCSS
Acquisition Support Center, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- More information
Notice details come from DoD SBIR/STTR (DSIP). Updated .
Notice text
DoD SBIR topic A12-057
Component: ARMY
Command: PEO CS&CSS
Phase: SBIR Program Phase I Action
Technology Areas: Ground Sea
Keywords: mechanical anchor; remote; tagline; bridge; launch; tether; ground penetrating; zip line
Objective:
An anchor system that when launched across a river or upstream can proof-load an anchor with tagline running back to the launch site.
Description:
Develop a system that when launched (catapulted or submerged) to a remote location can set and proof load an anchor point for a tethered cable. 1. Develop a system that could be launched across a gap, secure a mechanical anchor and then proof load it to verify proper setting. a. The system would have to be durable enough to sustain a catapult or propulsion launch and resulting impact after being launched across a 50-meter wet gap onto concrete or equivalent packed soil. b. After landing, the system would have to orient itself on the far bank, penetrate the surface, and reliably secure the anchor in under 15 minutes.
2. This system shall be capable of being submerged in water and perform underwater anchorage in riverbeds.
3. This system shall be capable of being launched onto rooftops and cliffs 50 feet above the launch position.
4. This system would have to supply its own power or connect to a power source available at the launch point.
5. This system would be either remote controlled or automated and provide indication to the operator that the anchor is set and ready for use.
6. This system would connect a cable suitable for moving a minimum of a 900 lbs object horizontally along the cable to the distant 50 meter anchor position.
7. The system shall include all materials that necessarily leave the near shore launch site to span the gap - a tethered cable, anchor, mechanism for setting the anchor, and power supply or power interface. The launch mechanism used to send the system to the remote site is not necessarily part of this system. This system would be transported by HMMWV and moved to its launch position by two soldiers. The components of the system that must be launched is approximately 80 lbs and 1 cubic yard, and would be transported by HMMWV then moved to the launch area by two soldiers. Target cost for mass production system (QTY 10,000) is under $1000.
- Many styles of commercial anchor systems are available; such as Manta Ray earth anchors, pre-drill and drive into place concrete anchor systems, and Powder Actuated Tools like Remington’s 496. Each can be used to set and proof load a mechanical anchor in situations when an operator has access to the site and power for the tools. To accomplish this task at other locations, where the inability or reluctance to put the operator on a remote site, is desired. - This capability lends itself to many military and disaster relief uses. - Semi-permanent tactical bridging operations often require anchor points to be established to maintain a bridge position. When sustaining float bridges for river crossing operations, an ideal anchor position is directly upstream from the center of the bridge, and out of the way of floating debris. With the ability to remotely set a proof-loaded anchor in the water up-river, an operator could install the system and sustain floating bridge operations using fewer boats to hold the bridge from floating downstream, and eliminate the need for 100 lbs. kedge anchors and divers (often unavailable) to set riverbed anchors. - Troops also need to cross gaps where there is no bridge or means to cross on foot. Rapid zip line style crossings on the tethered cable could be made to any location that could only be reached by launching the remote anchor system. - Supplies, like construction materials, could be moved precisely to the anchor point after threading tubular objects with the free end of a tethered cable. Since the anchor is proof-loaded before use, a solid base for constructing upon the remote site anchor point is established. - Current bridge launch systems are vehicle mounted systems requiring substantial weight (often limiting the mobility of the host vehicle), require large flat launch area access, and cantilever bridges over dry gaps. This launch technique requires substantial counterbalance to prevent objects from falling into the gap. Properly anchored parallel cables of sufficient strength could simply support objects as they are moved across a gap, and remain in place to serve as added reinforcement for a bridge built upon the suspended cables. An emplaced anchor and cable could serve to launch a heavier cable and anchor system onto the far shore; eventually building up to the desired capacity at the far anchor site and over the gap.
To support precise aerial-to-ground delivery from a helicopter, the system could be used to eliminate the need to land or hover over a delivery target for aerial delivery of supplies, assemblies, and construction material.
Phase I:
The phase I effort will identify feasible solutions, existing technology for integration, and technology gaps / risk to achieve the objective. A proof-of-concept experiment will demonstration viability of phase II system’s highest risk attributes. This investigation, trade-off study, and proof-of-concept will culminate in a recommended Phase II prototype build and demonstration program to verify the system readiness for tactical deployment.
Phase II:
Will build and verify a prototype systems readiness for use in a relevant environment. Testing in a wet operation and dry gap crossing environment will demonstrate the prototypes viability for a production qualification test.
Phase III:
A manufacturing plan will be developed around the production of a Production Qualification Test system build. Marketing will consist of product demonstrations and advertising using videos of product and recorded demonstrations. A universal anchoring kit for PEO-CS&CSS LAGCC Type 1 footbridge procurement, and float bridge sustainment operations. Commercialized technology could be used for boat anchors, providing ground holds to provide counterbalance to light-weight vehicles, when used with bearing plates it could provide soil stabilization, install reinforcements for sea walls, install safety lines for rock climbers, build piers/docks, used to stabilize a suspect structure after earthquake, or provide rescuers access to high rise buildings from adjacent buildings. Used to erect and reinforce towers. Stabilize structures in a post-disaster recovery operation.
Files
| File | Type | Posted |
|---|---|---|
| A12-057.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity