Laramie-snowy range 115KV transmission line addition and snowy range substation

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
89503219BWA000018
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

PSC
Not on record
More information

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

LARAMIE-SNOWY RANGE 115KV TRANSMISSION LINE ADDITION AND SNOWY RANGE SUBSTATION - STAGE 03.

Update #4 ·

LARAMIE-SNOWY RANGE 115KV TRANSMISSION LINE ADDITION AND SNOWY RANGE SUBSTATION - STAGE 03.

Update #3 ·

LARAMIE-SNOWY RANGE 115KV TRANSMISSION LINE ADDITION AND SNOWY RANGE SUBSTATION - STAGE 03.

Update #2 ·

LARAMIE-SNOWY RANGE 115KV TRANSMISSION LINE ADDITION AND SNOWY RANGE SUBSTATION - STAGE 03.

Update #1 ·

NOTE: All responses to this IFB shall be mailed to Western Area Power Administration, Rocky Mountain Region, P.O. Box 3700, Loveland, CO 80539-3003, ATTN: Eileen Ray. Physical Address for hand carried quotes/proposals/bids: Western Area Power Administration, Rocky Mountain Region, 5555 East Crossroads Boulevard, Loveland CO, 80538.
The Western Area Power Administration, Rocky Mountain Region has a requirement for a contractor to provide all the labor, materials, tools, equipment, transportation, and other resources necessary to complete this project. The principal components of work includes;
Miscellaneous site work, foundations for substation structures, electrical equipment and material, cable trenches, remove approximately 1.5 miles of existing conductor, overhead ground wire, optical overhead ground wire, assemblies, wood pole structures, anchors, and guys; furnish and install galvanized steel structure and relocate steel structures, new foundations, conductor insulator assemblies overhead ground wire assemblies, overhead optical ground wire assemblies, conductor, overhead; install Government Furnished power circuit breaker and vertical switchboard; furnish and install disconnecting switches, coupling capacitor voltage transformer, high voltage bus, ground system, conduit, insulated cables, terminal boxes, test trailer receptacles, outdoor lighting unit, OPGW and OPGW terminations. All work shall be completed 365 calendar days after the date of receipt of Notice to Proceed. The estimated order of magnitude is between $1,000,000.00 - $5,000,000.00. FAR Part 14, Sealed Bidding is being utilized for this requirement. The solicitation will be issued as a 100% small business set-aside. The applicable NAICS Code is 237130; Size Standard is $36.5M. The solicitation including specifications and drawings will be issued electronically at this site on or about 29 July 2019 at the following sites: https://www.fbo.gov and https://www.fedconnect.net.
NOTE: the Buy American Act applies to the solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material..

Files

File Type Posted
FedConnect File —

Notice history

Notice Type Posted
Laramie-snowy range 115KV transmission line additi Award Award Notice
This notice Latest solicitation Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors