Labor and Material for Tents to be Placed in Various Locations in Support of United Nations General Assembly 72

Closed Solicitation Posted

Solicitation number
HSSS-17-Q-0248
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
532299 All Other Consumer Goods Rental
PSC
Not on record
Place of performance
New York, NY, United States

Notice details come from SAM.gov. Updated .

Notice text

 

Scope of Work


 


 


Purpose:  The Secret Service is in need of tents to lease on a temporary basis to support the United Nations General Assembly in New York, New York.  Contractor is to furnish tents and labor to install at locations and time frames as stated below.  Locations and Quantities are subject to change. Time frames are approximate and are subject to change.  Further information will be given on actual locations and point of contact closer to the event.



1)



44th St. between 2nd & 3rd Ave


POC: TBD


Setup approximately 170' west of 2nd Avenue


Purpose: Vehicle check point - Services UN perimeter


Install by 04:00 AM on 9/18/2017


Remove by 06:00 PM on 9/23/2017


1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy)


3 - 9ft X 10ft solid white walls


4 - 300lb cement blocks


1 - Halogen light with 50ft cord


8 - Chairs


10 - Black Garbage Bags


1 - Power Strip


6 - Orange Safety Cones



2)



49th & 3rd 


POC: TBD


Purpose: Vehicle check point - Services the Waldorf, Palace, and Intercon


Install by 04:00 AM on 9/18/2017


Remove by 06:00 PM on 9/25/2017


1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy)


3 - 9ft X 10ft solid white walls


4 - 300lb cement blocks


1 - Halogen light with 50ft cord


8 - Chairs


10 - Black Garbage Bags


1 - Power Strip


6 - Orange Safety Cones



3)



U.N. Garage at 48th  Street


POC: TBD


Purpose: Vehicle check point- Services UN perimeter


Install by 04:00 AM on 9/18/2017


Remove by 06:00 PM on 9/23/2017


1 - 20ft X 40ft  Engineered Kedered Frame Tent with 10' Tall Leg


(preferably Anchor Navitrac, Olympic, or Comparable)


4 - 9ft X 20ft solid white walls


12 - 800lb cement weight stacks


2 - Halogen light with 50ft cords


12 - chairs


10 - Black Garbage Bags


1 - Power Strip



4)



FDR  Service Road - Between 48th& 49th


POC: Myron Wade @ 646-265-9852


Purpose: Vehicle check point - Services UN perimeter


Install by 04:00 AM on 9/18/2017


Remove by 06:00 PM on 9/23/2017


1 - 20ft X 40ft tent (10ft Tall Leg) (preferably Anchor Navitrac, Olympic or Comparable)


Covering one lane


2 - 9ft X 40ft solid white walls


12 - 800lb cement blocks


2 - halogen light with 50ft cords


20 - chairs


10 - Black Garbage Bags


1 - Power Strip



 



 



5)



41st St. between 1st Avenue & FDR


POC: TBD


Purpose: Vehicle check point - Services UN perimeter and Motorcades


Install 02:00 AM - 04:00 AM on 9/17/2017


Remove 12:00 PM - 02:00 PM on 9/25/2017


1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy)


3 - 9ft X 10ft solid white walls


4 - 300lb cement blocks


1 - Halogen light with 50ft cord


8 - Chairs


10 - Black Garbage Bags


1 - Power Strip


6 - Orange Safety Cones



6)



7th Ave. Between 54th & 55th  (East side of 7th Avenue mid-block)


POC: TBD


Purpose: Vehicle check point - Services the London Hotel


Install 02:00 AM - 04:00 AM on 9/20/2017


Remove 01:00 PM - 03:00 PM on 9/25/2017


1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy)


3 - 9ft X 10ft solid white walls


4 - 300lb cement blocks


1 - Halogen light with 50ft cord


8 - Chairs


10 - Black Garbage Bags


1 - Power Strip


6 - Orange Safety Cones



7)



6th Ave. Between 54th & 55th (West side of 6th Avenue mid-block)


POC: TBD


Purpose: Vehicle check point - Services the London/Peninsula Hotel


Install 02:00 AM - 04:00 AM on 9/19/2017


Remove 01:00 PM - 03:00 PM on 9/25/2017


1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy)


3 - 9ft X 10ft solid white walls


4 - 300lb cement blocks


1 - Halogen light with 50ft cord


8 - Chairs


10 - Black Garbage Bags


1 - Power Strip


6 - Orange Safety Cones



8)



JFK Airport: A


POC: TBD


Install by 05:00 PM 09/12/2017


Remove at 10:00 AM 09/26/2017


1- 30ft X 30ft heavy duty kedered frame tent (with Clear top) with 10' Tall Leg


(preferably Anchor Navitrac, Olympic or Comparable)


2 - 10ft X 30ft walls


12 - 800 lb cement weight stacks



9)



JFK Airport: B 


POC: TBD


Install by 05:00 PM 09/12/2017


Remove at 10:00 AM 09/26/2017


1- 30ft X 30ft heavy duty kedered frame tent (with Clear top) with 10' Tall Leg


(preferably Anchor Navitrac, Olympic or Comparable)


2 - 10ft X 30ft walls


12 - 800 lb cement weight stacks



10)



Sheraton 53rd Street, Setup between 6th and 7th


POC: TBD


Install 05:00 PM - 07:00 AM on 09/18/2017


Remove at 12:01 AM on 09/22/2017


1 - 8ft X 25ft tent with 8' Leg Height


2 - 8ft X 25ft solid white sidewalls (with 15' sliding portion)


6 - 300lb cement blocks


1 - halogen light with 50ft cord



11)



NY Palace - 455 Madison Avenue & 51st Street


POC: TBD


Hotel Entrance: X-Ray Tent


Install at 01:30 AM - 4:00 AM on 09/18/2017


Remove at 12:01 AM - 4:00 AM on 09/24/2017


1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy)


3 - 9ft X 10ft solid white walls


4 - 300lb cement blocks


1 - halogen light with 50ft cord


8 - chairs


2 - Pipe cross beams


4 - Pipe uprights


4 - Pipe base plates


6 - 10' x 5' Velour Drapes



12)



NY Palace, 50th St, Between Park Avenue & Madison Avenue


POC: TBD


Hotel Entrance: X-Ray Tent


Install at 01:30 AM - 4:00 AM on 09/18/2017


Remove at 12:01 AM - 4:00 AM on 09/24/2017


1 - 4ft X 25ft Frame Tent


1 - 10ft X 20ft sliding white wall


1 - Additional vinyl to fill in around tent to sides of building


6 - 300lb Cement Blocks



13)



NY Palace, 455 Madison Avenue


Between trees in courtyard


POC: TBD


Hotel Entrance: X-Ray Tent


Install at 01:30 AM - 4:00 AM on 09/18/2017


Remove at 12:01 AM - 4:00 AM on 09/24/2017


1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy)


3 - 9ft X 10ft solid white walls


4 - 300lb cement blocks


1 - halogen light with 50ft cord


8 - chairs



14)



UNSG Residence, 3 Sutton Place


China Premier Visit


POC: TBD


Install at 04:00 PM - 06:00 PM on 09/19/2017


Remove at 10:00 PM - 11:30 PM on 09/19/2017


1 - 10ft X 15ft x 10" Leg Height Frame Tent


2 - 15ft X 10ft solid white walls


4 - 300lb cement blocks


1 - Battery Powered Light



15)



Peninsula hotel, 700 5th Avenue


Employee entrance on south side of W. 55th street, just west of 5th Avenue


Turkey Visit


POC: TBD


Install at 05:00 AM - 07:00 AM on 09/19/2017


Remove at 06:00 AM - 08:00 AM on 09/23/2017


1 - 10ft X 10ft x 10" Leg Height Frame Tent


2 - 10ft X 10ft solid white walls


4 - 300lb cement blocks


1 - Battery Powered Light



16)



Turkey Park Ave


Turkey Visit


POC: TBD


Install at 11:00 AM - 01:00 PM on 09/22/2017


Remove at 04:00 PM - 06:00 PM on 09/22/2017


1 - 6ft X 10ft x 10' Leg Height Frame Tent


2 - 10ft X 10ft solid white walls


4 - 300lb cement blocks



17)



Israeli Prime Minster Richard Rogers Theater


Richard Rogers Theater - Setup 46th Bet 7th & 8th


POC: TBD


Install at 02:30 PM - 04:00 PM on 09/24/2017


Remove at 11:30 PM - 01:00 AM on 09/24/2017


1 - 10ft X 10ft x 10" Leg Height Frame Tent


2 - 10ft X 10ft solid white walls


4 - 300lb cement blocks


1 - Battery Powered Light


2 - 10' Pipe and Drape Sections



18)



Pop Up Request 1


POC - TBD


Install at 12:00 AM on 09/26/2017


Remove by 08:00 PM 09/30/2017


1 - 10' X 10' Pop Up


4 - Sand Bags



19)



Pop Up Request 2


POC - TBD


Install at 12:00 AM on 09/26/2017


Remove by 08:00 PM 09/30/2017


1 - 10' X 10' Pop Up


4 - Sand Bags



20)



Pop Up Request 3


POC - TBD


Install at 12:00 AM on 09/26/2017


Remove by 08:00 PM 09/30/2017


1 - 10' X 10' Pop Up


4 - Sand Bags



21)



Pop Up Request 4


POC - TBD


Install at 12:00 AM on 09/26/2017


Remove by 08:00 PM 09/30/2017


1 - 10' X 10' Pop Up


4 - Sand Bags



22)



Pop up requirement 5


POC: TBD


Install by 06:00 AM on 9/25/2017


Remove by 06:00 PM on 9/26/2017


1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy)


3 - 9ft X 10ft solid white walls


4 - 300lb cement blocks


1 - Halogen light with 50ft cord


8 - Chairs


10 - Black Garbage Bags


1 - Power Strip


6 - Orange Safety Cones



23)



Pop up requirement 6


POC: TBD


Install by 06:00 AM on 9/25/2017


Remove by 06:00 PM on 9/26/2017


1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy)


3 - 9ft X 10ft solid white walls


4 - 300lb cement blocks


1 - Halogen light with 50ft cord


8 - Chairs


10 - Black Garbage Bags


1 - Power Strip


6 - Orange Safety Cones



24)



Pop up requirement 7


POC: TBD


Install by 06:00 AM on 9/25/2017


Remove by 06:00 PM on 9/26/2017


1 - 10ft X 10ft x 9'-3" Leg Height Frame Tent (preferably Tentnology or Ideal Canopy)


3 - 9ft X 10ft solid white walls


4 - 300lb cement blocks


1 - Halogen light with 50ft cord


8 - Chairs


10 - Black Garbage Bags


1 - Power Strip


6 - Orange Safety Cones



 



 



 



 



 



 


Site Visit:  A site visit can be arranged if required.


 


Contractor Screening:  The selected contractor will be required to provide the following information about the contractor's employees and subcontractors who may have direct or incidental access to information being provided by the U.S. Secret Service:  a) Employee's full name; b) Employee's date and place of birth; c)    Employee's social security number; and d) Employee's race and sex.


 


The U.S. Secret Service will conduct a background check of all named personnel.  The results of these checks will be used solely by the U.S. Secret Service in evaluating personnel.


 


USSS Points of Contact:


 


Joe Blevins  Office 202-406-5884, Cell 202-355-3313


           email - Joseph.Blevins@usss.dhs.gov


 


 


VENDORS MUST BE ABLE TO WORK 24/7 DURING PEAK PERIODS OF MISSION OPERATIONS


 


 