L065--"NEW REQUIREMENT" V5 Pharmacy Sterile Clean Certification
Closed Pre-Solicitation Posted
- Solicitation number
- 36C24523Q0622
- Agency
-
Veterans Integrated Service Network 5
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 333413 Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
- Place of performance
- Visn 5
Notice details come from SAM.gov. Updated .
Notice text
Page 16 of 16
RFI SOURCES SOUGHT
DISCLAIMER: This Sources Sought is issued solely for information and planning purposes and does not constitute a solicitation. Neither unsolicited proposals nor any other kind of offers will be considered in response to this Sources Sought. Responses to this notice are not offers and will not be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this Sources Sought. All information received in response to this RFI that is marked Proprietary will be handled accordingly. Responses to the Sources Sought will not be returned. At this time, questions concerning the composition and requirements for a future Request for Quote will not be entertained. The Department of Veterans Affairs is conducting market research in order to provide Testing and Certifications VISN 5. The Government anticipates awarding a Firm Fixed Price type contract that will provide the Testing and Certifications listed within the below Draft Statement of Work.
OBJECTIVE: See Draft SOW.
RESPONSE INSTRUCTIONS:
Name and Address of Company
Any small business designation as certified by the Small Business Administration
A through description of experience in managing support requirements of this nature.
CONTACT INFORMATION: Any questions related to this Sources Sought shall be directed to Mark Smith at Mark.Smith25@va.gov. All information regarding Capabilities Statements or any other proprietary information relative to this Sources Sought shall be submitted via email to Mark.Smith25@va.gov no later than 3:00 PM EST on 05/17/2023.
DESCRIPTION / SPECIFICATION / WORK STATEMENT
STATEMENT OF WORK PART A GENERAL INFORMATION
A.1 INTRODUCTION: This requirement is for testing and certification of all the VISN 5 facility s primary engineering controls (PECs), and sterile clean rooms used for preparation of Compounded Sterile Preparations (CSPs). PECs include biological safety cabinets (BSCs), laminar airflow workstations (LAFWs) hoods, compounding aseptic containment isolators (CACI), and compounding aseptic isolators (CAI). Testing and certification will be completed in accordance with United States Pharmacopeia (USP) Chapter 2022 (or most recent) guidelines and Controlled Environment Testing Association (CETA) Certification Guide for Sterile Compounding Facilities for USP Compliance (CAG-003).
A.2 BACKGROUND: VISN 5 is pursuing VISN-wide contract for standardizing testing criteria appropriate for all PECs used pursuant to USP Chapter and Chapter standards using Controlled Environment Testing Association (CETA) Certified National Board of Testing (CNBT) certified individuals/companies to establish consistent PEC certification procedures using the CETA Certification Guide for Sterile Compounding Facilities for USP Compliance (CAG-003) 2022 (or current) version).
The USP establishes standards for cleanroom design, environmental monitoring, and competencies for the preparation, handling, and storage of CSPs. The Joint Commission (TJC) Accreditation Manual for Home Care, effective January 13, 2018, established new Medication Compounding (MC) standards for non-sterile and sterile compounded preparations which are based on USP standards. The Food and Drug Administration (FDA) has the authority to inspect VA medical facilities under the FD&C Act and applying the Insanitary Conditions at Compounding Facilities Guidance for Industry, November 2020 (or current version).
Certification procedures defined in CETA CAG including, but not limited to, 003 (CETA Certification Guide for Sterile Compounding Facilities for USP Compliance), 014 (Airflow Visualization Study), and 009 (Viable Environmental Monitoring for Sterile Compounding Facilities) shall be performed by a CETA National Board of Testing (CNBT) certified testing individual/company no less than every 6 months or whenever the PEC or room is relocated or altered or when major service to the sterile compounding facility is performed.
A.3 SCOPE OF WORK:
A.3.1 NSF 49 Field Testing Requirements for Biological Safety Cabinets
The contractor shall certify all Class II biosafety cabinets to the current version of NSF/ANSI 49-2020 (or higher) specifications as well as CETA CAG 003. All equipment used to certify biological safety cabinets shall have ISO/IEC 17025 accredited calibration certification. Any unit that fails to meet specifications shall be clearly marked with a sign that will notify technicians that the unit is out of order until further notice. In addition, any failures shall be reported directly to the site identified point(s) of contact (POC) as soon as practicable.
For each PEC passing the required certification tests, the contractor will supply each unit with a certification sticker with the following information:
Company name and address
Unit make, model and serial number
Report number
Location (room number)
Certification date
Recertification date
Technician signature
A.3.2 Fume Hood/Testing and Certification
The contractor shall test and certify each fume hood to the manufacturer s specifications. Tests shall include: face velocity test, airflow smoke pattern test and low flow alarm test. In the event that the fume hood has an air flow monitor (AFM) or controller (AFC), the contractor shall confirm the unit is calibrated and operating within +/-10% of actual velocity. If it is not calibrated appropriately the contractor shall calibrate the AFM or AFC. The contractor shall use a NIST traceable or comparable calibrated piece of equipment to calculate the face velocity. The contractor shall report each individual face velocity reading and the average of those readings, a pass/fail grade for the airflow smoke pattern test and a pass/fail grade for the low flow alarm test. Any failures shall be reported directly to the POC(s) as soon as practicable.
For each PEC passing the required certification tests, the contractor will supply each unit with a certification sticker with the following information:
Company name and address
Certification date
Recertification date
Average face velocity
Sash height (only for fume hoods)
Technician name and signature
A.3.3 PEC Testing and Certification
The contractor shall test and certify each PEC to the most current version of The Institute of Environmental Sciences (IEST) RP CC002 (Unidirectional-flow, clean-air devices), CETA CAG -003, and to the manufacturer s specifications. The contractor shall use a NIST traceable or comparable calibrated piece of equipment to perform all testing. The contractor shall report each individual face velocity reading and the average of those readings, the downstream concentration reading of the HEPA filter leak test and the results of the induction leak test and backstreaming test. Any failures shall be reported directly to the identified site point of contact(s) as soon as practicable.
Horizontal laminar flow cabinets shall be certified according to IEST RP-CC-002 Testing Laminar Air Flow Devices and in accordance with CETA CAG -003. All annual and semi-annual on-site certifications for Biological Safety Cabinets (BSCs) must be accomplished in accordance with the most current National Sanitation Foundation/American National Standards Institute (NSF/ANSI) Standard 49 Class II (laminar flow) Biosafety Cabinetry. The list of tests includes, but is not limited to:
HEPA filter leak test
Cabinet leak test
Inflow velocity test to include exhaust airflow volume rate
Airflow Smoke pattern test
Electrical leakage and ground circuit resistance and polarity tests
Lighting intensity test
Vibration test
Noise level test
Ultraviolet (UV) lamp test
Laminar Flow Hoods certifications must be accomplished in accordance with the most current version of the National Sanitation Foundation/American National Standards Institute (NSF/ANSI) Standard 49 Class II Biosafety Cabinetry, Annex F, test method A-D, 1992 or most current issue.
Fume hoods certifications must be accomplished in accordance with the most current version of the ANSI/ASHRAE 110-2016.
For each PEC passing the required certification tests, the contractor will supply each unit with a certification sticker with the following information:
Company name and address
Unit make, model and serial number
Report number
Location (room number)
Certification date
Recertification date
Technician name and signature
A.3.4 Viable and Non-viable Particle Counts
For the PECs, viable and non-viable particle counts samples will be collected. Viable samples will be collected for each device (both bacterial and fungal) for the air and surface in accordance with USP . Refer to the description of these tests in the section A.3.5.3 and A.3.5.4 for details.
A.3.5 USP Testing for Pharmacy Clean Rooms
The contractor will provide comprehensive cleanroom testing and certification services every 6 months for required semi-annual certifications to include:
HEPA filter integrity testing
Airflow testing: Airflow testing is performed to determine acceptability of the air velocity, the room air exchange rate, and the room pressure differential in doorways between adjacent rooms to ensure consistent airflow and that the appropriate quality of air is maintained under dynamic operating conditions.
Total particle count testing
Room pressurization monitoring
Temperature and Humidity monitoring
Air pattern analysis
Microbiological air and surface monitoring
Dynamic airflow smoke pattern test for each PEC (contractor to leave video of smoke test on site prior to completion of certification process).
Written Report
Based upon findings noted in semi-annual certifications, or as necessary after an environmental excursion or physical change to the spaces or PECs occurs, additional applicable re-certification tests will be completed to reassess applicable areas and are included within this contract.
A.3.5.1 Air Changes per Hour
The contractor shall calculate the total room volume for each buffer, ante room, and hazardous drug storage room. A sketch of the room with dimensions, exhaust/supply diffuser locations and equipment locations shall be included in the report. The report provided will specify flow rates detailing returns and supply that were obtained during the testing. The contractor shall calculate air changes per hour (ACPH) for each buffer and ante room and include their findings in the report. Comparison of ACPH will be completed both for USP standards as well as those referenced VHA HVAC Design Manual, which are more stringent than USP .
In the event that a room does not meet USP or VHA HVAC Design Manual requirements for ACPH the identified site POC(s) shall be informed immediately.
A.3.5.2 Pressure Requirements
The contractor shall include in their report differential pressure readings from each buffer/ante room to all surrounding areas. The report shall indicate whether the room is required to be a negative or positive pressure room per USP. All readings and acceptance criteria shall be documented to at least one thousandths of an inch water column (e.g., 0.020 w.g. and not 0.02 w.g.) or one tenth of a pascal (e.g., 2.5 Pa). Pressure differentials will be reflected on a report showing the sketch of the room(s).
A.3.5.3 Viable Environmental Sampling
The contractor shall perform viable environmental (air and surface) sampling every 3 months for fungi and bacteria using high volume impaction samplers to conduct the sampling. While it is acceptable per USP standards to utilize Tryptic Soy Agar (TSA) media for bacteria, and another media specific to fungal VISN 5 requires all air samples to utilize TSA media which supports growth of both bacteria and fungi.
Air sampling: A sufficient volume of air (1000 liters) shall be tested at each location to maximize sensitivity. Samples of less than 1000 liters will not be acceptable.
Surface Sampling: Surface samples will be collected in each room, the interior of each ISO Class 5 PEC, pass through chambers connecting to classified areas, and frequently touched surfaces. Surface sampling will be performed at the end of the largest CSP batch of the day.
Any laboratory results equal to or greater than the action level will require notification of the POC(s) immediately upon receipt of results.
Reports to include at a minimum:
Date and time sampling was taken.
All Environmental sampling reports will contain both the quantitative number of bacterial/fungal isolates as well as the species grown to the genus level.
Medial lots used for samples
Comments indicating when dynamic conditions were used
Certificates of analysis of media used
Sketch identifying location of each sample obtained
A.3.5.4 Monthly Surface Sampling, Personnel Competency Assessment, and Gloved Fingertip (GFT) and Media Fill Test (MFT)
Monthly Surface Sampling:
For those months without a scheduled semi-annual certification or quarterly environmental sampling collection, the contractor shall collect surface samples for the assessment of ongoing compliance.
Surface samples will be taken from each of the following classified areas:
Class 5 PEC
Pass through chambers connecting to classified areas.
Equipment contained within PEC
Staging or work area(s) near the PEC
Frequently touched surfaces
Surface sample locations and quantity will be reviewed with and verified by local points of contact for each location by contractor.
Surface samples will be collected, sent through the same laboratory used for viable environmental sampling, incubated with appropriate temperature and storage time, and analyzed all in accordance with 2022 USP (or more recent) requirements.
Personnel Competency Assessment
Contractor shall offer service to complete and document assessment of competency of compounding personnel including gowning/garbing observation, GFT and MFT, and post-test surface sample. Facilities will have the option to utilize contractor to complete competency assessment during scheduled monthly contractor onsite visits. If facilities elect to utilize this service, they will clearly communicate with the contractor at the time of visit scheduling of this need, as well as the number of staff requiring competency assessment.
Gloved Fingertip (GFT) and Media Fill Test (MFT)
If facility elects for contractor to complete competency assessment, contractor will include materials and assessment of GFT/MFT results in accordance with 2022 USP (or more recent) requirements.
If facility elects to complete competency assessment internally, facility will capture GFT/MFT samples. Facility collected samples will be sent through contractor to same laboratory used for environmental sampling for consistency. Contractor and laboratory will ensure incubation temperatures, and storage times comply with 2022 USP (or more recent) requirements:
Report:
Through either contractor or facility captured GFT/MFT, contractor will utilize the same laboratory used for viable environmental sampling to incubate and analyze samples.
results will be reported as number of cfu per hand with notation of whether cfu action level is exceeded through reporting total number of cfu from both hands.
Competency assessment and documentation will be in accordance with 2022 USP (or more recent) requirements.
A.3.5.5 Environmental Wipe Sampling for Hazardous Drug Residue
The contractor will perform environmental wipe sampling for hazardous drug surface residue semiannually (e.g., every 6 months), or more frequently as needed to verify containment. The kits used to complete wipe sampling must be verified prior to use to ensure the method and reagent used have been tested to recover a specific percentage of known marker drugs.
The drugs required for testing include:
Cyclophosphamide
Ifosfamide
Methotrexate
Fluorouracil
Platinum-containing drugs
Additional Drugs
Additional drugs may be requested based upon identified need per site.
Upon identified need, the applicable site will work directly with the contractor where additional cost will be clarified and agreed upon by both parties prior to testing.
A minimum of 6 surface samples will be completed per certification. Facilities can elect to work with contractor to expand beyond the minimum as they see fit but will be coordinated and communicated with contractor prior to certification visit. Surface sampling will include the following minimum areas:
Interior of PEC and equipment contained in it.
Pass-through chambers
Surfaces in staging or work areas near PEC
Areas adjacent to PECs (e.g., floors directly under C-PEC, staging, and dispensing area)
Areas immediately outside the hazardous drug buffer room or C-SCA
Patient administration areas
A.3.5.6 Nonviable Particle Testing
The contractor shall perform environmental nonviable particle testing semiannually (e.g., every 6 months). The contractor shall derive the minimum number of sampling locations using Annex A in the ISO 14644-1.2 standard. Testing shall be performed by qualified operators using current, state-of-the-art electronic equipment with results of the following:
ISO Class 5: not more than 3520 particles 0.5 µm and larger size per cubic meter of air for any area primary engineering control (BSC or LAFW).
ISO Class 7: not more than 352,000 particles 0.5 µm and larger size per cubic meter of air for any buffer area or hazardous compounding ante room.
ISO Class 8: not more than 3,520,000 particles 0.5 µm and larger size per cubic meter of air for any non-hazardous compounding ante room.
A.3.5.7 HEPA Filter Replacement and Minor Repairs
The contractor shall complete any identified HEPA filter replacement during certification visit in instances where a need is identified, and replacement is available on site. If HEPA filter changes must be postponed until a filter can be supplied, the contractor will install the new HEPA filter and conduct leak testing at an agreed upon time with the facility.
The contractor shall complete additional minor repairs associated with clean room certification and operations that are identified during certification visit, and within contractor ability to resolve which may include, but are not limited to:
PEC Chemo Decontamination
LAFW filter or blower replacement
BSC filter or blower replacement
Repairs may include parts if agreed upon by facility prior to installation.
A.3.5.8 Report Requirements
All of the following information should be included in the report for clean room certification. Pass/Fail notifications (in addition to actual findings) should be included on a per-test basis where applicable.
Executive summary or summary of findings
Recommendations to resolve any identified discrepancies
Room number and/or location
Room type (e.g., oncology prep room)
Date of testing
Date of next required certification
Standards used to test room
Notes
Room sketch (location of supply/exhaust diffusers, equipment, room dimensions)
Total room area and volume
Humidity and Temperature of each room assessed for certification
Air changes per hour with assessment based both from USP standards as well as those referenced within the VHA HVAC Design Manual
Pressure differential
Particle Count Tests
Nonviable particle counts
Viable particle count analysis
Picture of viable particle test location in room
Number of personnel present in each PEC and SEC during total particle-count tests
Environmental viable sample results
Environmental Wipe Sampling for Hazardous Drug Residue results
Dynamic Airflow Smoke-Pattern Test Results
Smoke test video (either embedded in report, or a link to the video)
Number of personnel present in each PEC and SEC
Confirm/distinguish dynamic and static conditions if applicable
Note: All PECs shall follow report requirements for a non-USP units but shall include viable and nonviable particle sampling.
A.3.5.9 Report Distribution
The contractor will immediately notify identified points of contact with any results indicating failure. A formalized written report including all required aspects specified in this Statement of Work will be provided in a timely manner with receipt by identified points of contact no more than 14 days from certification evaluation.
All completed reports will be provided via email tovisn5cspadvisorycommittee@va.gov. In addition, facility specific reports will be provided to the following points of contact:
Baltimore VAMC:
Christopher Maltese (Christopher.Maltese@va.gov)
Shawnol Jemison (Shawnol.Jemison@va.gov)
Eugene DeLara (Eugene.DeLara@va.gov)
Ron Lilly (Ronald.Lilly@va.gov)
Robert Johnson (Robert.Johnson5@va.gov)
Bill Mytsak (Vasyl.Mytsak@va.gov)
Perry Point VAMC:
Christopher Maltese (Christopher.Maltese@va.gov)
Eugene DeLara (Eugene.DeLara@va.gov)
Ifeanyi Anadu (Ifeanyi.Anadu@va.gov)
Robert Johnson (Robert.Johnson5@va.gov)
Bill Mytsak (Vasyl.Mytsak@va.gov)
Loch Raven VAMC:
Christopher Maltese (Christopher.Maltese@va.gov)
Eugene DeLara (Eugene.DeLara@va.gov)
Frederick Soetje (Frederick.Soetje@va.gov)
Robert Johnson (Robert.Johnson5@va.gov)
Beckley VAMC:
Jack Wright (Jack.Wright2@va.gov)
Brianne Fairchild (Brianne.Fairchild@va.gov)
Austin Lilly (Austin.Lilly@va.gov)
Lawrence Woods (Lawrence.Woods@va.gov)
Justin Greene (justin.greene@va.gov)
John Montgomery (John.Montgomery3@va.gov)
Louis A. Johnson (Clarksburg) VAMC:
Carissa Bartlett (Carissa.Bartlett@va.gov)
Angela Dawkins (Angela.Dawkins@va.gov)
Barbie Covelli (Barbara.Covelli@va.gov)
Dan Young (Daniel.Young@va.gov)
Amy Gay (Amy.Gay@va.gov)
Alyssa Green (Alyssa.Green@va.gov)
Huntington VAMC:
Joey Nash (William.Nash4@va.gov)
Chris Waugh (Chris.Waugh@va.gov)
Charles Alex Noble (Charles.Noble@va.gov)
Dan Nicholson (Daniel.Nicholson@va.gov)
Eli Gillespie (Eli.Gillispie@va.gov)
Jamie Farley (Jamie.Farley@va.gov)
John Klim (John.Klim2@va.gov)
Martinsburg VAMC:
David Everhart (David.Everhart@va.gov)
Denise Canby (Denise.Canby@va.gov)
Sarah Mickanis (Sarah.Mickanis@va.gov)
Krista Bowen (Krista.Bowen@va.gov)
Jeff Miller (Jeffrey.Miller6@va.gov)
Andrew Faust (Andrew.Faust@va.gov)
Washington DC VAMC:
Isaac Buabeng (Isaac.Buabeng@va.gov)
Ivan Cephas (Ivan.Cephas@va.gov)
Mitiku Berhanu (Mitiku.Berhanu@va.gov)
Berook Addisu (Berook.Addisu@va.gov)
William T. Hagen (William.Hagen@va.gov)
Contractor will be notified by facility of any updates to identified points of contact list on an as needed basis.
Within the first 10 calendar days of each quarter, the contractor will provide via email to visn5cspadvisorycommittee@va.gov a schedule of pending visits for the quarter per site including scheduled dates and planned tests (i.e. semi-annual certification, re-certification, viable sampling, etc.)
Testing Frequency:
Certification procedures defined in CETA CAG-003 shall be performed by a CETA National Board of Testing (CNBT) certified testing individual/company no less than every 6 months or whenever the PEC or room is relocated or altered or when major service to the sterile compounding facility is performed.
Environmental sampling (air and surface) will be completed quarterly (every 3 months), or more frequently if required to assess corrective actions associated with prior negative results. Government captured surface samples will be completed each month between contractor captured results.
Recertification procedures may be required in between scheduled semi-annual certifications based upon certification findings which may include any applicable certification test or environmental sampling. Recertification visits will be scheduled and completed within 2 weeks of request from the facility.
Environmental wipe sampling for hazardous drug residue will be performed every 6 months, or more frequently if required to verify containment.
STATEMENT OF WORK PART C SUPPORTING INFORMATION
C.1 Place of Performance:
Facility Name
Address
Baltimore VAMC
10 North Greene Street, Baltimore, MD 21201
Perry Point VAMC
VA Medical Center, Perry Point, MD 21902
Loch Raven VAMC
3900 Loch Raven Blvd, Baltimore, MD 21218
Beckley VAMC
200 Veterans Avenue, Beckley, WV 25801
Louis A. Johnson (Clarksburg) VAMC
1 Medical Center Drive, Clarksburg, WV 26301
Hershel Woody Williams (Huntington) VAMC
1540 Spring Valley Dr., Huntington, WV 25704
Martinsburg VAMC
510 Butler Avenue, Martinsburg, WV 25405
Washington DC VAMC
50 Irving St. NW Washington DC 20422
Specific PEC and Clean Room Information Per Site:
Baltimore VAMC:
Hood
Baltimore VAMC
1
2
3
Physical Location (Building #)
BA121K
BA121KÂ
BA121LÂ
Manufacturer
BakerÂ
 NuAire
 Baker
Model Number
 EG-6252
 NU-407-400
 SG400
Serial Number
 90751
68736ADUÂ
 60541
Make
 LFU
 Class II Type A/B3
 Class II Type A/B3Â
EE#
 EE81086
EE41397Â
EE46875Â
Clean Rooms:
Cleanroom Suite:
Anteroom (ISO 7)
Non-Hazardous IV Prep (Buffer) Room (ISO 7)
Hazardous IV Prep (Buffer) Room (ISO 7)
HEPA Filter Information:
Quantity:
8 Total HEPA Filters (7 Supply and 1 exhaust)
Location(s)
7 Ceiling Supply Diffusers
1 Above Ceiling not in interstitial space
Test Port Status:
installed by Winergy circa 2018/2019 and are functional.
Perry Point VAMC:
Hood
New hood purchased and enroute to site
Perry Point VAMC
CAI
Physical Location (Building 361)
GC108B
Manufacturer
Baker
Model Number
SS500
Serial Number
Unknown currently
Make
Class 5 CAI
EE#
Not onsite yet
Clean Rooms:
Segregated Compounding Area CAI certification only.
HEPA Filter Information:
Quantity:
N/A - SCA
Location(s)
N/A - SCA
Test Port Status:
N/A - SCA
Loch Raven VAMC: (under construction with completion tentative for April 2023)
Hood
Hood
Loch Raven VAMC
CAI
CACI
Physical Location (Loch Raven Campus)
TBD
TBD
Manufacturer
Baker
Baker
Model Number
SS500
CS600
Serial Number
TBD
TBD
Make
class 5 CAI
Class 5 CAI
EE#
Not onsite yet
Not onsite yet
Clean Rooms:
Segregated Compounding Area CAI certification only.
Containment Segregated Compounding Area CACI certification only.
HEPA Filter Information:
Quantity:
N/A - SCA
Location(s)
N/A - SCA
Test Port Status:
N/A - SCA
Beckley VAMC
Hood
Beckley VAMC
IVPB
CHEMO
LAFW
BSC
Cleanroom Pass Through
Physical Location (Building #)
1AB-108B-B
1AB-108B-C
Manufacturer
LABCONO
NUAIRE
BAKER
NuAire
Terra Universal
Model Number
36100000
NU-430-600
EG4320-19930
NU-543-410UB00
2634-80A
Serial Number
08283192 P
123452052208
140856
212883040722
2634-80A-P173983
Make
Class II Type A2
Class II Type A2
EE#
EE13673
EE13921
Clean Rooms:
Cleanroom Suite:
Anteroom (ISO 8)
Non-Hazardous IV Prep (Buffer) Room (ISO 7)
Hazardous IV Prep (Buffer) Room (ISO 7)
HEPA Filter Information:
Quantity:
Nine (9) 2x4 filters
Location(s)
3 Diffusers in Room 4AB-110 Anteroom; 3 Diffusers in Room 4AB-110B IV Compounding; 3 Diffusers in Room 4AB-110C Chemo Compounding
Test Port Status:
Available
Louis A. Johnson (Clarksburg) VAMC
Hood
Louis A. Johnson (Clarksburg) VAMC
Chemo
BSC 1
BSC 2
Physical Location (Building #)
Clinical Addition B215G-1
Clinical Addition B215F-1
Clinical Addition B215F-1
Manufacturer
LabConco
LabConco
LabConco
Model Number
3441000
346100
346100
Serial Number
091118151B
091118140B
091118141B
Make
4' purifier biosafety cabinet Class II Type B2
6' purifier biosafety cabinet Class II Type B2
6' purifier biosafety cabinet Class II Type B2
EE#
EE17187
EE17188
EE17189
Clean Rooms:
Cleanroom Suite:
Non-Hazardous Anteroom (ISO 8)
Non-Hazardous IV Prep (Buffer) Room (ISO 7)
Hazardous Anteroom (ISO 7)
Hazardous IV Prep (Buffer) Room (ISO 7)
Hazardous Drug Storage
HEPA Filter Information:
Quantity:
13 HEPA Filters (ceiling supply)
Location(s)
3 Anteroom
8 Non-HD Buffer Room
2 HD Buffer Room
Test Port Status:
Unknown
Huntington VAMC
Hood
Huntington VAMC
LAFW
LAFW
BSC
CACI
Physical Location (Building #)
1B101a
1B101a
1B101b
Research Building Room 101
Manufacturer
Baker
Baker
Nu-Aire
Nu-Aire
Model Number
EG-4252
EG-6252
NU-430-600
NU-NR800-400
Serial Number
109952
107979
153119100912
206990071221
Make
EdgeGARD
EdgeGARD
LabGard ES
FlowGard
EE#
37066
35809
35769
59777
Clean Rooms:
Cleanroom Suite: (Pending Construction Completion-TBD)
Non-Hazardous Anteroom (ISO 8)
Non-Hazardous IV Prep (Buffer) Room (ISO 7)
Hazardous Anteroom (ISO 7)
Hazardous IV Prep (Buffer) Room (ISO 7)
SCA
Hazardous IV SCA Room
HEPA Filter Information:
Quantity:
3 HEPA Filters
Location(s)
2 located in air handling above ceiling in ante room
1 filter located in air handler above break room table
Test Port Status:
Unknown
Martinsburg VAMC
Clean Rooms:
Cleanroom Suite:
Non-Hazardous Anteroom (ISO 8)
Non-Hazardous IV Prep (Buffer) Room (ISO 7)
Hazardous Anteroom (ISO 7)
Hazardous IV Prep (Buffer) Room (ISO 7)
HEPA Filter Information:
Washington DC VAMC
WASHINGTON DC VAMC HOOD INVENTORY
LAFT
LAFT
BSC
BSC
IVPB ISOLATOR
CHEMO ISOLATOR
Physical Location
1E-141
1E-141
1E-144
1E-144
4E-122
4E-124
Manufacturer
BAKER
BAKER
BAKER
BAKER
NUAIRE
NUAIRE
Model Number
EG-6252
EG-6252
SG604
SG604
NU-PR797-600
NU-NR797-600
Serial Number
131988
131987
131989
131990
1.43161E+11
1.42613E+11
Make
EdgeGARD® HF
Clean Benches
EdgeGARD® HF
Clean Benches
Class II, Type A2
Class II, Type A2
 CAI
 CACI
EE#
NA
NA
NA
NA
EE1288022
EE1292025
Clean Rooms:
Cleanroom Suite:
Anteroom: ISO 7
Non-Hazardous IV Prep (Buffer) Room (ISO 7)
Hazardous IV Prep (Buffer) Room (ISO 7)
Segregated Compounding Area
IVPB Isolator (CAI)
Chemo Isolator (CACI)
HEPA Filter Information:
Quantity:
5 Total HEPA Filters
Location(s)
5 filters within ceiling supply diffuser
Test Port Status:
5 test ports
Changes to facility PEC will be communicated in a timely manner to contractor and facility costs will be adjusted accordingly based on these changes. Contractor to provide unit-based costs for services to allow for adjustments in equipment.
C.2 Period of Performance: Contract period is from date of award for five (5) years. Performance is to begin 15 calendar days from date of award.
C.3 Special Considerations:
C.3.1 Contractor Furnished Materials:
All materials and tools to complete the work identified.
Contractor to ensure all staff that perform on-site testing arrive wearing non-shedding clothing.
C.3.2 Government Furnished Materials and Services:
The Government will provide all necessary personnel protective equipment (PPE) required for contractors on site.
The Government will provide oversight and verification of contractor personnel completion of donning of PPE and hand hygiene prior to testing/sampling.
The Government will, on rare occasion, provide office or meeting space to discuss test results, projects, or plans.
The Government will provide replacement HEPA filters, when applicable.
May also provide desk phone service as needed.
C.3.3 Qualifications of Key Personnel: VISN 5 is seeking a qualified contractor that meets the following specifications:
Provide three references showing the completion of at least 3 jobs of similar size and scope at other hospital facilities with at least one of those facilities being a VA Medical Center.
All certifications must be signed by an NSF 49 certified technician. A copy of NSF 49 certifications must be attached to the bid documentation for any technicians that will be performing work at the facility.
All cleanroom performance testing must be supervised by a technician with a CETA National Board of Testing (CNBT) certification. A copy of the certification must be attached to the bid documentation for the supervisor or project manager of the team that will be performing work at the facility.
Provide AIHA accredited laboratory certification for all USP viable sampling analysis. Certification must be attached with bid documentation.
Provide copy of clean room certification report for evaluation.
C.3.4 Security Requirements: There are no security requirements required for this work, as samples are retrieved by the vendor and a test report is received in return.
C.3.5 Additional Considerations
The contractor (or Representative) shall contact the facility identified POC(s) to schedule work and prior to the beginning of work. Scheduling of work will be at the direction of facility identified POC(s) to ensure services are incorporated into current facility certification cycles.
Local facility POC(s) will provide the contractor with additional facility specific procedures which include: check in and check out procedures; contractor badging requirements; parking procedures; and any additional facility specific procedures. The contractor will be expected to adhere to those procedures. Services are to be performed during the hours between 8:00 AM and 4:00 PM Eastern Standard Time (EST), excluding federal holidays. Due to the workload of the pharmacy during business hours, the contractor may need to work after 4:00 PM EST to accommodate the compounding schedule at the pharmacy. Contractors that are willing to perform after-hours work should include this information in their bid documentation. If a contractor is willing to perform services after 4:00pm EST this service must be included within the bid pricing as no extra charge. The ability to perform work after hours is not required; however, preferences will be given to contractors that offer flexible work hours.
C3.6 Invoicing
Payment will be made monthly in arrears, invoices will be prepared by the Contractor, and submitted through Tungsten Network (formerly known as OB10) http://www.tungstennetwork.com/us/en/. A properly prepared invoice shall contain:
Invoice Number and Date
Contractor s Name and Address
Accurate Purchase Order Number
Itemized service(s) and applicable cost:
Supply or Service provided (i.e., PEC certification, travel costs, etc.)
Period Supply or Service Provided
Total Amount Due
Contractor questions about the e-invoicing program (Tungsten Network), contact information is as follows:
Tungsten e-Invoice Setup Information: 1-877-489-6135
Tungsten e-Invoice email: VA.Registration@Tungsten-Network.com
FSC e-Invoice Contact Information: 1-877-353-9791
FSC e-invoice email: vafsccshd@va.gov
Web Address: HTTP://WWW.FSC.VA.GOV/EINVOICE.ASP
The contractor will provide an electronic copy of each invoice to the identified POC(s) referenced in A.3.5.6
C.3.7 Liable Insurance Requirements
Files
| File | Type | Posted |
|---|---|---|
| 36C24523Q0622.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity