Jump Tower Inspection Services
Closed Solicitation Posted
- Solicitation number
- W91247
- Agency
- Mission and Installation Contracting Command Army Materiel Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 333923 Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
- Place of performance
- Fort Bragg, North Carolina 28310, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
- Inspection of 34’ towers and supplemental equipment
(1) First will be a thorough inspection of the condition for each jump tower system to include the tower structure, guy wire and pulley system, guy wire anchor and foundation, building structure, and other areas as needed. Price includes a man lift for the 40ft pole inspection. (2) Contractor will include a safety assessment of the towers to identify any areas that place trainees, Cadre, or others at risk to bodily harm. The safety inspection findings will be cataloged separately from the condition findings but many if not will be items that pertain to both.
The contractor will perform a comprehensive inspection in compliance with the TIA 222-H standard. The inspection will encompass two areas of focus. Within 30 days of Contractor arrival on-site.
**See attached PWS for further details.
Reason for Amendment 1: Updated NAICS and PSC
NAICS changed from 333923 to 541350
PSC changed from H140 to H340
Solicitation amendment date extend from 18 November 2022 to 22 November 2022 at 2 p.m.
Reason for Amendment 2: Updated NAICS
NAICS changed from 541350 to 333923
Solicitation amendment date extend from 22 November 2022 to 23 November 2022 at 2 p.m.
Update #2 ·
- Inspection of 34’ towers and supplemental equipment
(1) First will be a thorough inspection of the condition for each jump tower system to include the tower structure, guy wire and pulley system, guy wire anchor and foundation, building structure, and other areas as needed. Price includes a man lift for the 40ft pole inspection. (2) Contractor will include a safety assessment of the towers to identify any areas that place trainees, Cadre, or others at risk to bodily harm. The safety inspection findings will be cataloged separately from the condition findings but many if not will be items that pertain to both.
The contractor will perform a comprehensive inspection in compliance with the TIA 222-H standard. The inspection will encompass two areas of focus. Within 30 days of Contractor arrival on-site.
**See attached PWS for further details.
Reason for Amendment: Updated NAICS and PSC
NAICS changed from 333923 to 541350
PSC changed from H140 to H340
Solicitation amendment date extend from 18 November 2022 to 22 November 2022 at 2 p.m.
Update #1 ·
- Inspection of 34’ towers and supplemental equipment
(1) First will be a thorough inspection of the condition for each jump tower system to include the tower structure, guy wire and pulley system, guy wire anchor and foundation, building structure, and other areas as needed. Price includes a man lift for the 40ft pole inspection. (2) Contractor will include a safety assessment of the towers to identify any areas that place trainees, Cadre, or others at risk to bodily harm. The safety inspection findings will be cataloged separately from the condition findings but many if not will be items that pertain to both.
The contractor will perform a comprehensive inspection in compliance with the TIA 222-H standard. The inspection will encompass two areas of focus. Within 30 days of Contractor arrival on-site.
**See attached PWS for further details.
Attachments
| File | Type | Posted |
|---|---|---|
| PWS v3.docx | DOCX document |