JOFOC: 68HERH25C0005:Portable High Throughput Integrated Laboratory Identification Systems (PHILIS) Platform Modernization, Change Order

Awarded Limited / Sole Source Justification Posted

Solicitation number
JOFOC_68HERH25C0005_PHIIS_Change_Order
Agency
Not on record
Set-aside
No set-aside

Opportunity facts

Contract number
68HERH25C0005 Federal contract award
Awardee
Mriglobal
PSC
2330 Trailers

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Environmental Protection Agency's Office of Chief Procurement Officer intends to modify an existing contract with MRIGLOBAL under FAR 6.302-1 (only one responsible source) to increase the ceiling by $244,900 for the Portable High Throughput Integrated Laboratory Identification Systems (PHILIS) Platform Modernization program, raising the total contract value to approximately $13.813 million.

The justification establishes that MRIGLOBAL is the only responsible source capable of executing the required design modifications. At fourteen months into contract performance, over 90 percent of final design has been completed. Introducing a new contractor at this stage would impose substantial learning curve requirements and create unacceptable risk of program delays. The modification incorporates design changes including custom generator exhaust adaptors, insulation upgrades from 2 inches to approximately 5.5 inches, and fire sensing and suppression system upgrades, along with increased labor and materials costs. The original contract was competitively awarded on January 22, 2025, under FAR Parts 15 and 12. A notice of the proposed modification was posted on SAM.gov on March 17, 2026, with closure on April 1, 2026, and received no responses. The modification was signed by Contracting Officer Adrianne Wells and approved by Supervisory Contracting Officer Heather Adams on May 7, 2026. The program designs and manufactures mobile and base-of-operations laboratory systems for detecting Chemical Warfare Agents and Toxic Industrial Chemicals. The contract is cited under authority 41 U.S.C. 253(c)(1).

Notice text

JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

in accordance with FAR Subpart 6.302-1

This document is being prepared pursuant to the content requirements prescribed in Federal Acquisition Regulation (FAR) Subpart FAR 6.303-2(b).

1. FAR 6.303-2(b)(1), Identification of the agency and the contracting activity, and specific

identification of the document as a "Justification for other than full and open competition":

Agency: U.S. Environmental Protection Agency

Contracting Activity: Office of Chief Procurement Officer (OCPO)

Office of Land, Enforcement and Air Division (LEAD)

Program Office: Office of Land and Emergency Management (OLEM)

Office of Emergency Management (OEM)

Program POC: Stuart Willison, OLEM/OEM

Project Identification: 68HERH25C0005: Portable High Throughput Integrated Laboratory

Identification Systems (PHILIS) Platform Modernization, Change Order

Proposed Source(s): MRIGLOBAL (UEI: HKQHNFKNKL15)

PLEASE SEE ATTACHED DOCUMENT Justification for Other Than Full and Open Competition_68HERH25C0005 signed.pdf FOR FULL DETAILS.

Awarded contract 68HERH25C0005 to unknown vendor for unknown amount on 2025-01-22.

Files

Notice history

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors