JFK Air Traffic Control Tower Refurbishment Project
Closed Pre-Solicitation Posted
- Solicitation number
- DTFAEN-15-R-00011
- Agency
-
Eastern Region
Federal Aviation Administration, Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- More information
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Solicitation Amended, See Attached Amendment 0001
The Federal Aviation Administration is seeking competent and qualified contractors to provide labor, equipment, tools and materials and their use in connection with the Airport’s Air Traffic Control Tower (ATCT) 15th and 16th floors and Cab Refurbishment Project located at JFK International Airport, Jamaica, New York in accordance with the Specifications, Drawings and Contract Clauses.
NAICS 236220
Performance Time: 60 Calendar Days
Payment Bond: Required
Performance Bond: Required
Security Escort Services: Required
General Liability Insurance: $1,000.000.00
Automobile Liability Insurance: $1,000,000.00
Estimated Range: $100,000.00 - $250,000.00
A Mandatory Pre-Proposal Site Visit is scheduled for Wednesday April 01, 2014 at 10:00 A.M. at the Airport’s Air Traffic Control Tower (ATCT), Administration Base Building located JFK International Airport, Jamaica, New York 11430. Due to security reasons, no other dates are available. Offers will be ONLY accepted from those offerors that have attended site visit .
Offerors will contact Mr. Frederick A. Lockridge at (718)553-3087 or Email: fred.lockridge@faa.gov 48 hours prior to scheduled site visit date to make arrangements.
If you're viewing this announcement from a source other than Federal Aviation Administration Contract Opportunities (FAACO), visit https://faaco.faa.gov/index.cfm/announcement/view/20179 to view the original announcement.
Update #1 ·
The Federal Aviation Administration is seeking competent and qualified contractors to provide labor, equipment, tools and materials and their use in connection with the Airport’s Air Traffic Control Tower (ATCT) 15th and 16th floors and Cab Refurbishment Project located at JFK International Airport, Jamaica, New York in accordance with the Specifications, Drawings and Contract Clauses.
NAICS 236220
Performance Time: 60 Calendar Days
Payment Bond: Required
Performance Bond: Required
Security Escort Services: Required
General Liability Insurance: $1,000.000.00
Automobile Liability Insurance: $1,000,000.00
Estimated Range: $100,000.00 - $250,000.00
A Mandatory Pre-Proposal Site Visit is scheduled for Wednesday April 01, 2014 at 10:00 A.M. at the Airport’s Air Traffic Control Tower (ATCT), Administration Base Building located JFK International Airport, Jamaica, New York 11430. Due to security reasons, no other dates are available. Offers will be ONLY accepted from those offerors that have attended site visit .
Offerors will contact Mr. Frederick A. Lockridge at (718)553-3087 or Email: fred.lockridge@faa.gov 48 hours prior to scheduled site visit date to make arrangements.
If you're viewing this announcement from a source other than Federal Aviation Administration Contract Opportunities (FAACO), visit https://faaco.faa.gov/index.cfm/announcement/view/20082 to view the original announcement.
Files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| Attachment 5.pdf | ||
| Attchment 2.pdf | ||
| Solicitation DTFAEN-15-R-00011.pdf | ||
| Attachment 4.pdf | ||
| Attachment 3.pdf | ||
| Attachment 1.pdf | ||
| Attachment 6.pdf | ||
| Attachment 3.pdf | ||
| Attachment 1.pdf | ||
| Solicitation DTFAEN-15-R-00011.pdf | ||
| Attchment 2.pdf | ||
| Attachment 5.pdf | ||
| Attachment 4.pdf | ||
| Attachment 6.pdf |
Show all 15
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity