JFK Air Traffic Control Tower Refurbishment Project

Closed Pre-Solicitation Posted

Solicitation number
DTFAEN-15-R-00011
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
More information

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Solicitation Amended, See Attached Amendment 0001



The Federal Aviation Administration is seeking competent and qualified contractors to provide labor, equipment, tools and materials and their use in connection with the Airport’s Air Traffic Control Tower (ATCT) 15th and 16th floors and Cab Refurbishment Project located at JFK International Airport, Jamaica, New York in accordance with the Specifications, Drawings and Contract Clauses.



NAICS 236220

Performance Time: 60 Calendar Days

Payment Bond: Required

Performance Bond: Required

Security Escort Services: Required

General Liability Insurance: $1,000.000.00

Automobile Liability Insurance: $1,000,000.00

Estimated Range: $100,000.00 - $250,000.00



A Mandatory Pre-Proposal Site Visit is scheduled for Wednesday April 01, 2014 at 10:00 A.M. at the Airport’s Air Traffic Control Tower (ATCT), Administration Base Building located JFK International Airport, Jamaica, New York 11430. Due to security reasons, no other dates are available. Offers will be ONLY accepted from those offerors that have attended site visit .



Offerors will contact Mr. Frederick A. Lockridge at (718)553-3087 or Email: fred.lockridge@faa.gov 48 hours prior to scheduled site visit date to make arrangements.



If you're viewing this announcement from a source other than Federal Aviation Administration Contract Opportunities (FAACO), visit https://faaco.faa.gov/index.cfm/announcement/view/20179 to view the original announcement.

Update #1 ·

The Federal Aviation Administration is seeking competent and qualified contractors to provide labor, equipment, tools and materials and their use in connection with the Airport’s Air Traffic Control Tower (ATCT) 15th and 16th floors and Cab Refurbishment Project located at JFK International Airport, Jamaica, New York in accordance with the Specifications, Drawings and Contract Clauses.



NAICS 236220

Performance Time: 60 Calendar Days

Payment Bond: Required

Performance Bond: Required

Security Escort Services: Required

General Liability Insurance: $1,000.000.00

Automobile Liability Insurance: $1,000,000.00

Estimated Range: $100,000.00 - $250,000.00



A Mandatory Pre-Proposal Site Visit is scheduled for Wednesday April 01, 2014 at 10:00 A.M. at the Airport’s Air Traffic Control Tower (ATCT), Administration Base Building located JFK International Airport, Jamaica, New York 11430. Due to security reasons, no other dates are available. Offers will be ONLY accepted from those offerors that have attended site visit .



Offerors will contact Mr. Frederick A. Lockridge at (718)553-3087 or Email: fred.lockridge@faa.gov 48 hours prior to scheduled site visit date to make arrangements.



If you're viewing this announcement from a source other than Federal Aviation Administration Contract Opportunities (FAACO), visit https://faaco.faa.gov/index.cfm/announcement/view/20082 to view the original announcement.

Files

File Type Posted
Amendment 0001.pdf PDF
Attachment 5.pdf PDF
Attchment 2.pdf PDF
Solicitation DTFAEN-15-R-00011.pdf PDF
Attachment 4.pdf PDF
Attachment 3.pdf PDF
Attachment 1.pdf PDF
Attachment 6.pdf PDF
Attachment 3.pdf PDF
Attachment 1.pdf PDF
Solicitation DTFAEN-15-R-00011.pdf PDF
Attchment 2.pdf PDF
Attachment 5.pdf PDF
Attachment 4.pdf PDF
Attachment 6.pdf PDF
Show all 15

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors