About this opportunity

The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5 is seeking qualified contractors to upgrade electrical panels in the Office of Information and Technology (OIT) Server Room at the Washington DC VA Medical Center located at 50 Irving St NW, Washington, DC 20422. The procurement involves comprehensive electrical panel replacement services including surveying existing infrastructure, removing old panels, installing new panels with appropriate capacity, integrating with existing systems, and ensuring compliance with VA and electrical code standards while minimizing server room downtime. Contractors must be licensed electrical contractors with demonstrated experience in data center environments and must employ OSHA 30-hour certified supervisors for the work. The evaluation will focus on the contractor's business information, socio-economic status, capability statements, previous experience with Veterans Health Administration or similar facilities, available contract vehicles, service categories, certifications for local requirements, and their capability to self-perform while complying with subcontracting limitations. Interested parties must submit their responses via email to William.Galletta@va.gov by Friday, September 3, 2025, at 10:00 AM EST.

This opportunity is specifically set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under solicitation number 36C24525Q0814, with the NAICS code 238210 for Electrical Contractors and Other Wiring Installation Contractors. No incumbent contractors or current service providers are identified in the notice. The document does not specify award values, budget ranges, or contract duration, as this is a sources sought notice designed to identify qualified potential contractors rather than a formal solicitation. Key coordination requirements include working closely with VA OIT and Engineering staff throughout the project execution, and contractors must demonstrate their ability to maintain critical server room operations during the electrical upgrade process. The 60-day archive period following the response deadline indicates the government's timeline for evaluating responses and potentially moving forward with a formal solicitation process.

Notice text

Department of Veterans Affairs NCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for Washington DC VA Medical Center.

Please respond to this RFI/Sources Sought 36C24525Q0814 with your:

1. Business name (including Unique Entity ID (SAM.gov)

2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned,

Disadvantaged Small Business, 8(a), etc.), and

3. Person of contact (including telephone number & email address).

4. Capability statement and summary of previous experience providing these types of

services for the Veterans Health Administration or other similar facilities.

5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (include

applicable NAICS)

6. Brief Summary of categories of services that your company can/cannot provide.

7. Certification(s) / Licenses for meeting the local requirements to provide these

services at the Huntington VAMC (if applicable)

8. Confirmation that your organization has the capability & expertise to meet the

performance requirements while complying with applicable limitations in

subcontracting by responding to the questions below with your response:

a. Do you intend to self-perform this effort?

b. If you are located outside the immediate area, how will you self-perform?

c. Or do you intend to subcontract work under this contract?

d. If you intend to subcontract work under this contract, how will you ensure

compliance with the limitations on subcontracting?

Response Instructions:

Responses must be received by Friday 9/03/ 2025 @ 10:00 AM EST. Responses to the

information requested above must be submitted via email to William.Galletta@va.gov

OIT Server Room Panel Upgrade

Washington DC VA Medical Center

50 Irving St NW, Washington, DC 20422

1.0 INTRODUCTION

This Statement of Work (SOW) outlines the requirements for upgrading the electrical panel(s) serving the Office of Information and Technology (OIT) Server Room at the Washington DC VA Medical Center. The upgrade is necessary to support current and future power demands, improve system reliability, and ensure compliance with all applicable codes and VA standards.

2.0 SCOPE OF WORK

The contractor shall provide all labor, materials, equipment, supervision, testing, and incidentals required in:

- Survey the existing server room electrical panel(s) and associated infrastructure.

- Remove and properly dispose of existing panel(s) and associated components as required.

- Furnish and install new electrical panel(s) of appropriate capacity and configuration, as specified by VA OIT and Engineering.

- Integrate new panel(s) with existing electrical distribution systems, including all required connections, breakers, and labeling.

- Ensure compatibility with existing and planned IT equipment loads.

- Minimize server room downtime and coordinate all outages with VA OIT and Engineering.

- Test and commission the new panel(s) and provide all required documentation.

3.0 DETAILED TASKS & INSTRUCTIONS

3.1 Pre-Installation Activities

- Attend a pre-installation meeting with VA OIT and Engineering staff.

- Conduct a detailed site survey to assess existing conditions and finalize panel requirements.

- Submit product data, electrical drawings, and cut sheets for proposed panels and components for VA approval.

- Develop and submit a project schedule, phasing plan, and safety plan for review.

3.2 Demolition and Removal

- Shut down and lock out/tag out (LOTO) circuits and equipment in accordance with VA and OSHA standards.

- Remove existing electrical panel(s) and associated components as required.

- Properly dispose of all removed materials in compliance with environmental and VA regulations.

3.3 Installation of New Panel(s)

- Prepare mounting surfaces and install new panel(s) and all required support.

- Install all the new breakers, bus bars, and accessories as specified.

- Integrate panel(s) with existing circuits, feeders, and grounding systems.

- Ensure all the wiring is neat, labeled, and installed to NEC and VA standards.

- Coordinate with VA OIT to minimize disruption to server room operations.

3.4 Testing and Commissioning

- Inspect and test all new installations for proper operation, including load testing, breaker function, and grounding.

- Verify compatibility with all server room equipment and confirm power redundancy as applicable.

- Document all test results and submit to VA for review.

3.5 Project Closeout

- Provide as-built drawings, updated panel schedules, and equipment submittals.

- Submit warranty documentation for all new equipment.

- Clean all work areas and remove debris.

- Provide training for VA OIT and Engineering staff on operation and maintenance of the new panel(s).

4.0 DELIVERABLES

- Project schedule, phasing plan, and safety plan.

- Submittals for all equipment and materials.

- Test and commissioning reports.

- As-built drawings and updated panel schedules.

- Warranty certificates and O&M manuals.

5.0 CONTRACTOR QUALIFICATIONS

- Licensed electrical contractor with demonstrated experience in data center/server room environments.

- All work to be performed by qualified, licensed electricians.

- OSHA 30-hour certified supervisor to always be on site.

6.0 SAFETY & SECURITY

- Comply with all VA, OSHA, and NEC safety requirements.

- Maintain secure work areas and always protect sensitive IT equipment.

- Implement infection control and dust mitigation measures as required.

7.0 COORDINATION & SCHEDULING

- All work affecting server room operations must be coordinated with VA OIT and Engineering.

- Schedule all outages and major activities during approved windows to minimize impact on operations.

Files

File Type Posted
36C24525Q0814.docx DOCX document

Similar open opportunities

Opportunity Agency Set-aside Responses due
Z2DA--652-24-101 Improve Electrical Distribution Department of Veterans Affairs Richmond, Virginia 23249, United States · NAICS 236220 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
J061--SOURCES SOUGHT NOTICE - Triennial Electrical Inspection Testing and Maintenance Services Requirement - Louis A Johnson VA Medical Center 36C24527Q0039 Department of Veterans Affairs Louis A Johnson VA Medical Center Clarksburg, West Virginia 26301, United States · NAICS 238210 Veterans Integrated Service Network 5 No set-aside
Z1DA--NRM| 460-26-007 Electrical Distribution Inspection Repairs | NCO 4 Construction East (VA-26-00057558) Department of Veterans Affairs Wilmington DE 19805 · NAICS 236220 Veterans Integrated Service Network 4 Service-Disabled Veteran-Owned Small Business
657A5-26-111, Triennial Electrical Testing Marion, Illinois 62959, United States · NAICS 238210 Veterans Integrated Service Network 15 Service-Disabled Veteran-Owned Small Business Sole Source
Brooklyn Upgrade Life Safety/Critical Branch Electrical Construction - 630A4-16-430 Brooklyn, New York 11209, United States · NAICS 238210 VA Technology Acquisition Center Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity