Interlock Control System Replacement at Maxwell Locks and Dam
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W911WN25B8012
- Agency
- ENDIST Pittsburgh US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KA Construction Of Dams
- Points of contact
-
- Connie L. Ferguson connie.l.ferguson@usace.army.mil (412) 395-7551
- Aaron Barr aaron.m.barr@usace.army.mil (412) 395-7157
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Pittsburgh District is procuring a new lock interlock control system replacement for Maxwell Locks and Dam on the Monongahela River in East Millsboro, Fayette County, Pennsylvania. The project involves installing a comprehensive valve interlock control system with valve-to-gate, gate-to-valve, and valve-to-valve interlocks that must comply with the current Inland Marine Transportation System (IMTS) Minimum Interlock Control Standard. Key requirements include installing UL 508 certified interlock control panels for each lock chamber, hardwiring all limit switches on miter gates and filling/emptying valves to relays, providing key-operated bypass switches with visual and audible alarms, and installing new cables throughout the lock chambers including crossovers. The scope also encompasses miscellaneous electrical equipment installation, hydraulic system modifications, and equipment such as manifolds, solenoid operated four-way valves, and manual bypass valves. The solicitation was originally posted on December 6, 2024, with the response deadline extended from January 23 to January 28, 2025, and bids were opened on January 28, 2025.
This procurement is designated as a Service-Disabled Veteran-Owned Small Business set-aside under NAICS code 237990 for Other Heavy and Civil Engineering Construction. The bid results show six contractors submitted proposals ranging from $1,545,123.00 to $3,257,713.00, with GFM Partners, LLC of Lancaster, PA submitting the lowest bid against a government estimate of $1,454,713.42 without profit. Construction work will occur in close proximity to active lock and dam operations, requiring coordination with government personnel since the facility operates 24 hours a day, 365 days per year. A pre-bid site visit was conducted on December 18, 2024, with significant contractor interest evidenced by attendees from multiple companies including Thoroughbred Construction, MRP Stahanks, IEC, AIG, BCI, and ALGO. The project involves critical infrastructure work on an operational inland waterway transportation system that requires careful coordination of all shutdowns with the Contracting Officer or designated representative.
Notice text
5 versions
Update #5 · Latest ·
A new lock interlock control system shall be procured by the USACE Pittsburgh District for the lock chambers at Maxwell Locks and Dam on the Monongahela River. The project includes the installation of a valve interlock control system with valve-to-gate, gate-to-valve, and valve-to-valve interlocks in accordance with the current Inland Marine Transportation System (IMTS) Minimum Interlock Control Standard. General project features include the installation of cables, limit switches, control panels, miscellaneous electrical equipment and hydraulic equipment. The new interlock control system shall consist of a centrally located UL 508 certified interlock control panel for each lock chamber. The interlock control panel shall be the main control enclosure for the interlock control system. All limit switches on the miter gates, filling valves, and emptying valves shall be hardwired to relays in the enclosure. The enclosure shall contain key operated bypass switches for each limit switch and shall indicate when a limit switch has been bypassed. Visual indication and an audible alarm at each control panel shall be provided if a lock operation is interrupted or cannot be performed due to an interlock permissive being violated. New cables shall be installed throughout the lock, including the lock chamber cross overs, to achieve a fully functional system. Miscellaneous electrical equipment such as conduit, channel strut, clamps, and cable trays shall be utilized to properly route cables. The existing hydraulic system shall be modified as necessary to support the IMTS interlock standard. Equipment such as manifolds, solenoid operated four-way valves, manual bypass valves, and piping shall be installed to achieve a fully functional interlock control system. Construction work will occur in close proximity to lock and dam areas. The existing facilities are currently operated and staffed by Government personnel 24 hours a day 365 days of the year. All shutdowns are to be coordinated with the Contracting Officer or designated representative. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?. 20 December 2024 - Administrative Amendment 0100 issued to correct Response Date for solicitation from 11:00AM ET, 23 January 2025 to 11:00AM ET, 28 January 2025. Solicitation response date on SF1442 is correct. No changes to solicitation or attachments. 22 January 2025 - Amendment 0001 issued to Update Attachment 1 - Specifications - Maxw ell Replace Interlock Control Systems, and 2) Update Attachment 8 - Wage Determination from PA2024002 - 10-25-2024 to PA20250002 - 1-17-2025.
29 January 2025 - Public Bid Opening held yesterday, 28 January 2025; bid results and attendance posted.
Update #4 ·
A new lock interlock control system shall be procured by the USACE Pittsburgh District for the lock chambers at Maxwell Locks and Dam on the Monongahela River. The project includes the installation of a valve interlock control system with valve-to-gate, gate-to-valve, and valve-to-valve interlocks in accordance with the current Inland Marine Transportation System (IMTS) Minimum Interlock Control Standard. General project features include the installation of cables, limit switches, control panels, miscellaneous electrical equipment and hydraulic equipment. The new interlock control system shall consist of a centrally located UL 508 certified interlock control panel for each lock chamber. The interlock control panel shall be the main control enclosure for the interlock control system. All limit switches on the miter gates, filling valves, and emptying valves shall be hardwired to relays in the enclosure. The enclosure shall contain key operated bypass switches for each limit switch and shall indicate when a limit switch has been bypassed. Visual indication and an audible alarm at each control panel shall be provided if a lock operation is interrupted or cannot be performed due to an interlock permissive being violated. New cables shall be installed throughout the lock, including the lock chamber cross overs, to achieve a fully functional system. Miscellaneous electrical equipment such as conduit, channel strut, clamps, and cable trays shall be utilized to properly route cables. The existing hydraulic system shall be modified as necessary to support the IMTS interlock standard. Equipment such as manifolds, solenoid operated four-way valves, manual bypass valves, and piping shall be installed to achieve a fully functional interlock control system. Construction work will occur in close proximity to lock and dam areas. The existing facilities are currently operated and staffed by Government personnel 24 hours a day 365 days of the year. All shutdowns are to be coordinated with the Contracting Officer or designated representative. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?. 20 December 2024 - Administrative Amendment 0100 issued to correct Response Date for solicitation from 11:00AM ET, 23 January 2025 to 11:00AM ET, 28 January 2025. Solicitation response date on SF1442 is correct. No changes to solicitation or attachments. 22 January 2025 - Amendment 0001 issued to Update Attachment 1 - Specifications - Maxw ell Replace Interlock Control Systems, and 2) Update Attachment 8 - Wage Determination from PA2024002 - 10-25-2024 to PA20250002 - 1-17-2025.
Update #3 ·
A new lock interlock control system shall be procured by the USACE Pittsburgh District for the lock chambers at Maxwell Locks and Dam on the Monongahela River. The project includes the installation of a valve interlock control system with valve-to-gate, gate-to-valve, and valve-to-valve interlocks in accordance with the current Inland Marine Transportation System (IMTS) Minimum Interlock Control Standard. General project features include the installation of cables, limit switches, control panels, miscellaneous electrical equipment and hydraulic equipment. The new interlock control system shall consist of a centrally located UL 508 certified interlock control panel for each lock chamber. The interlock control panel shall be the main control enclosure for the interlock control system. All limit switches on the miter gates, filling valves, and emptying valves shall be hardwired to relays in the enclosure. The enclosure shall contain key operated bypass switches for each limit switch and shall indicate when a limit switch has been bypassed. Visual indication and an audible alarm at each control panel shall be provided if a lock operation is interrupted or cannot be performed due to an interlock permissive being violated. New cables shall be installed throughout the lock, including the lock chamber cross overs, to achieve a fully functional system. Miscellaneous electrical equipment such as conduit, channel strut, clamps, and cable trays shall be utilized to properly route cables. The existing hydraulic system shall be modified as necessary to support the IMTS interlock standard. Equipment such as manifolds, solenoid operated four-way valves, manual bypass valves, and piping shall be installed to achieve a fully functional interlock control system. Construction work will occur in close proximity to lock and dam areas. The existing facilities are currently operated and staffed by Government personnel 24 hours a day 365 days of the year. All shutdowns are to be coordinated with the Contracting Officer or designated representative. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?. 20 December 2024 - Administrative Amendment 0100 issued to correct Response Date for solicitation from 11:00AM ET, 23 January 2025 to 11:00AM ET, 28 January 2025. Solicitation response date on SF1442 is correct. No changes to solicitation or attachments.
Update #2 ·
A new lock interlock control system shall be procured by the USACE Pittsburgh District for the lock chambers at Maxwell Locks and Dam on the Monongahela River. The project includes the installation of a valve interlock control system with valve-to-gate, gate-to-valve, and valve-to-valve interlocks in accordance with the current Inland Marine Transportation System (IMTS) Minimum Interlock Control Standard. General project features include the installation of cables, limit switches, control panels, miscellaneous electrical equipment and hydraulic equipment. The new interlock control system shall consist of a centrally located UL 508 certified interlock control panel for each lock chamber. The interlock control panel shall be the main control enclosure for the interlock control system. All limit switches on the miter gates, filling valves, and emptying valves shall be hardwired to relays in the enclosure. The enclosure shall contain key operated bypass switches for each limit switch and shall indicate when a limit switch has been bypassed. Visual indication and an audible alarm at each control panel shall be provided if a lock operation is interrupted or cannot be performed due to an interlock permissive being violated. New cables shall be installed throughout the lock, including the lock chamber cross overs, to achieve a fully functional system. Miscellaneous electrical equipment such as conduit, channel strut, clamps, and cable trays shall be utilized to properly route cables. The existing hydraulic system shall be modified as necessary to support the IMTS interlock standard. Equipment such as manifolds, solenoid operated four-way valves, manual bypass valves, and piping shall be installed to achieve a fully functional interlock control system. Construction work will occur in close proximity to lock and dam areas. The existing facilities are currently operated and staffed by Government personnel 24 hours a day 365 days of the year. All shutdowns are to be coordinated with the Contracting Officer or designated representative. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.
18 December 2024 - Organized Pre-bid site visit conducted; sign in sheet posted.
Update #1 ·
A new lock interlock control system shall be procured by the USACE Pittsburgh District for the lock chambers at Maxwell Locks and Dam on the Monongahela River. The project includes the installation of a valve interlock control system with valve-to-gate, gate-to-valve, and valve-to-valve interlocks in accordance with the current Inland Marine Transportation System (IMTS) Minimum Interlock Control Standard. General project features include the installation of cables, limit switches, control panels, miscellaneous electrical equipment and hydraulic equipment. The new interlock control system shall consist of a centrally located UL 508 certified interlock control panel for each lock chamber. The interlock control panel shall be the main control enclosure for the interlock control system. All limit switches on the miter gates, filling valves, and emptying valves shall be hardwired to relays in the enclosure. The enclosure shall contain key operated bypass switches for each limit switch and shall indicate when a limit switch has been bypassed. Visual indication and an audible alarm at each control panel shall be provided if a lock operation is interrupted or cannot be performed due to an interlock permissive being violated. New cables shall be installed throughout the lock, including the lock chamber cross overs, to achieve a fully functional system. Miscellaneous electrical equipment such as conduit, channel strut, clamps, and cable trays shall be utilized to properly route cables. The existing hydraulic system shall be modified as necessary to support the IMTS interlock standard. Equipment such as manifolds, solenoid operated four-way valves, manual bypass valves, and piping shall be installed to achieve a fully functional interlock control system. Construction work will occur in close proximity to lock and dam areas. The existing facilities are currently operated and staffed by Government personnel 24 hours a day 365 days of the year. All shutdowns are to be coordinated with the Contracting Officer or designated representative. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.
Attachments
| File | Type | Posted |
|---|---|---|
| Bid Results W911WN25B8012.pdf | ||
| Bid Opening Attendance.pdf | ||
| Sign In Sheet.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Interlock Control System Replacement at Maxwell Locks and Dam | Award Notice | |
| Interlock Control System Replacement at Maxwell Locks and Dam | Solicitation | |
| Replace Interlock Control Systems at Maxwell Locks & Dams | Special Notice | |
| Replace Interlock Control Systems at Maxwell Locks & Dams | Pre-Solicitation |
On GovTribe