Install Turf Field, Bldg 724 on Hunter Army Airfield, (HAAF), GA

Award Notice Posted

Solicitation number
W9124M-17-B-0012
Agency
Awarded
to Siler Excavating LLC
Set-aside
HUBZone

Opportunity facts

Contract number
W9124M-17-C-0015 Federal contract award
NAICS code
238990 All Other Specialty Trade Contractors
PSC
Not on record
Place of performance
Contracting Office Address: Micc- Fort Stewart 976 William H. Wilson Ave Ste 100 Fort Stewart, Georgia 31314, United States

Notice details come from SAM.gov. Updated .

Notice text

The Mission and Installation Contracting Command (MICC), Installation Contracting Office (IOC) - Fort Stewart, Georgia anticipates issuing a Firm Fixed Price (FFP) Invitation for Bid (IFB): Install Turf Field, Bldg 724 on Hunter Army Airfield, (HAAF), GA Solicitation.

Solicitation Number W9124M-17-B-0012 will be available for downloading at the Army Single Face to Industry website at https://acquisition.army.mil.asfi on or about August 2017. A link is provided through FedBizOpps page at www.fbo.gov. Potential Bidders are responsible for monitoring this site for release of the solicitation package and any amendments. All Bidders must register with the Central Contractors Registry now known as the System for Award Management (sam.gov) per FAR 52.204-7.

The solicitation is 100% set aside for qualifying HUBZone firms under NAICS code 238990 (Size Standard $15,000,000.00). The magnitude of the procurement is between $100,000.00 and $250,000.00. Contract performance time is 45 days. Information concerning the HUBzone program can be found at http://www.sba.gov/content/hubzone.

The primary point of contract is Casey B. Close (Contract Specialist) 912-767-5296 or Mary L. Hightower (Contract Officer) 912-767-8472 or by E-mail casey.b.close.mil@mail.mil mary.l.hightower.civ@mail.mil. Please copy both Casey and Mary on all correspondence.


Install Turf Field, Bldg 724
IJO NO J1-5-7J


Work to be Done: The work covered by this contract consists of furnishing all plant, labor, materials and performing all operations required in connection with Install Turf Field, Bldg 724, Hunter Army Airfield, Georgia, complete in strict accordance with specifications and drawings, subject to the terms and conditions of the contract. The work includes, but is not necessarily restricted to, the following items:


1. Perform engineering work necessary to survey the site, layout the work, size drain piping based on storm water calculations, and prepare a storm water pollution prevention plan.

2. Install silt fence.

3. Excavate and haul soil, compact soil for field installation.

4. Install a geotextile liner in excavated site.

5. Install perimeter HDPE drain piping.

6. Install a storm drain manhole, with drain piping connected to it from the turf field
and drain piping connected to the existing field inlet box.

7. Install 4" of drain rock.

8. Install 2" of finish stone.

9. Install a concrete retaining wall where the elevation of the turf field is higher than the elevation of the surrounding ground.

10. Install a concrete curb with nailer along the perimeter of the turf field site.

11. Install artificial turf with rubber crumb infill on top of finish stone and attached to the concrete curb.

12. Install yard lines, hash marks, and yard line numbers.

13. Fine grade the site and install centipede sod on all disturbed areas.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors