Notice text

2 versions

Update #2 · Latest ·


5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the
offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not,
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter
or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to
the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print)
(Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign)
(Signature of Contracting Officer)
1
1
P00001
07-15-2019
632-19-2-6044-0266
NONE
36C242
U.S. Department of Veterans Affairs
Network Contracting Office 2
VA Medical Center Northport NY
79 Middleville Road, Bldg. 10, Sec.138
Northport NY 11768
36C242
U.S. Department of Veterans Affairs
Network Contracting Office 2
VA Medical Center Northport NY
79 Middleville Road, Bldg. 10, Sec.138
Northport NY 11768
To all Offerors/Bidders
36C24219R0049
07-01-2019
X
X
X
1
** HOUR & DATE for Receipt of Offers is EXTENDED to:
X
1
AMENDMENT P00001 to Solicitation 36C24219R0049 Install Flooring Mental Health Units 21/22
The purpose of this Amenedment P00001 is to:
1. This Amenedment extends the Response Due Date Deadline to Wednesday July 24, 2019 11:59 PM ET. All responses must be
received by Wednesday July 24, 2019 11:59 PM ET. Response information remains the same, to email: joseph.ercole@va.gov
2. Site Visit will be conducted on Friday July 19, 2019 1:00 PM ET, meeting at front lobby Building 200, VA Medical
Center Northport NY, main entrance lobby at Flag Pole Building 200.
ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME AND UNCHANGED. THIS SOLICITATION AMENDEMENT MUST BE SIGNED ACKNOWLEDGED.
Joseph Ercole
copy on file signed by CO
V31OL3185.

Update #1 ·

Department of Veterans Affairs
VA Medical Center Northport NY
Install Flooring Unit 21& 22 Seclusion Rooms
Background
VA Northport NY is committed and proudly serves the VA community by providing the best possible health care and environment for health care to veterans and the highest standards of service to customers. We do this by improving and maintaining our physical structures and by providing the equipment, supplies, testing and preventive maintenance necessary to support excellence in health care.
This requirement is to install new sheet vinyl flooring in Seclusion Rooms Unit 21 and 22 at VAMC Northport NY. The procurement described herein is required to achieve the objectives as follows:
Objectives - The purpose of this solicitation is to install new sheet vinyl flooring in Seclusion Rooms of Mental Health Units 21 and 22 at VAMC Northport, Building 200.
2. Place of Performance
Department of Veterans Affairs
VA Medical Center Northport NY
79 Middleville Rd., Building 200, Units 21 and 22
Northport, NY 11768
3. Scope of Work/Statement of Work
Contractor shall furnish and provide all supplies, materials, services, labor, supervision, personnel necessary, safety, and equipment, for installing sheet vinyl flooring in Building #200. Department of Veterans Affairs Medical Center, 79 Middleville Road, Northport, N.Y. 11768.
All meetings, inspections and or work schedules must be coordinated and pre-approved prior to commencement by the Contracting Officer or Contracting Officer's representative (COR). All work shall be performed in a safe and reliable manner. The Contractor shall examine the work required and specified to determine the full scope of work prior to any estimate given to the D.V.A.M.C. representative.
The proposal shall be in writing, original and one 1 copy, an itemized breakdown (i.e. number of hours, trades, task and materials) and each of the trades and areas listed as separate line items (sample attached). Please refer to the attached specifications, General Requirements 01 00 00, Shop Drawings Product Data and Samples 01 33 23, Safety Requirements 01 35 26, Resilient Tile Flooring 09 65 19, Construction Waste Management 01 74 19, Subsurface Preparation for Floor Finishes 09 05 16, and Table of Contents - Specifications.
The Contractor shall supply a total of approximately 224 square feet of sheet vinyl flooring as specified (about 112 square feet per room), the color shall be a tan/brown mix, identical or equal to sample color grassland #15366
NOTE: In response to this Solicitation Contractor must include type of flooring (brand, type, color) to ensure product meets requirements and Specification Resilient Flooring 09 65 19.
Base molding as needed is included. Contractor is solely responsible for verification of measurements and of the procurement of all materials in sufficient quantities to ensure a complete installation (approximate room floors are each 8 x 12 ). Install new flooring sheet vinyl over the existing VCT flooring. Prepare subfloor to a smooth flat surface to ensure that existing imperfections do not show through the new flooring installation. Any floor preparation, sanding, and flooring application shall be properly vented. Any work during off hours/Other Than Normal Working Hours will be properly considered and shall be requested 72 hours in advance. The flooring is in 2 separate rooms in Mental Health Units 21 and 22, being 1 floor is in Unit 21 and the other floor is in Unit 22; see below for access.
The Contractor shall follow all manufacturer's requirements for proper installation, including the use of only manufacturer-authorized adhesives, welding rods, backing materials, tools, techniques and timeframes to ensure an installation that complies with all manufacturers requirements, VA specifications and generally accepted installation practices which result in a defect free finished product.
Contractor shall perform work in such a manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of the structure.
All flammable liquids shall be kept in approved safety containers. Only the amount necessary for immediate work shall be allowed in the building. Contractor shall supply the DVA. All MSDS sheets for any chemicals dry or liquid. Proper ventilation for any orders while applying adhesives.
Request for interruption of any services may be approved by Contracting Officer, however contractor shall first make a request in writing (email, letter, etc.) requesting any interruption of any services at least 48 hours in advance of interruption of services (aka Shut Down). There are no anticipated Shut Downs.
Contractor work is expected to be performed during regular working hours, 8:00 AM ET to 4:30 PM ET. Any off hours work, or off hours access shall be requested at minimum 72 hours in advance on the Other Than Normal Working Hours form, which will be provided to the contractor.
Work shall be provided by a schedule and contractor shall provide project calendar schedule showing dates of mobilization, start, work performed, demobilization, end, for project. Provide Safety Plan and have a designated Safety/Compliance Person and Site Supervisor onsite for duration of the project.
Contractor shall be responsible to plan and coordinate all work with Mark Brown, COR, and Mark will ensure full access to building at all times. The assigned Contracting Officer is Joseph Ercole. Contractor is responsible for record keeping, security monitoring, and inspection of area. Contractor shall maintain Certified Payroll and Daily Logs.
The Mental Health Units 21 and 22 are secured, therefore proper protocol is necessary All tools, materials and personal property shall be properly maintained and secured at all times. The job site shall be cleaned daily and all debris shall be removed. The COR may inspect the work site at any time, without notice.
The contractor shall be responsible for safety precautions, including warning signs and barricades during installation and shall have adequate personal on hand to insure a safe working environment.
All employees of general contractor and or sub-contractor shall comply with the Northport Department of Veterans Affairs security management program and obtain an I.D Badge from the DVAMC Police Department prior to commencing of work; badges shall be displayed on personal any time they are on DVAMC property. The general contractor is responsible for assuring that all contract or sub- contract workers of this project comply with these regulations, employees shall not enter project site without appropriate badges. No less than one week prior to commencement of work, the contractor shall provide the COR with a list of contractor staff participating in the work and shall submit in writing an ID request with company name, address, telephone number, name of each individual contractor employee and position title, SS#, address, copy of OSHA; see VA Specification for ID request.
Prior to commencing work, general contractor shall provide proof a OSHA CERTIFIED "competent person" with a 30-hour safety certificate (CP) (29 CFR 1926.20(b) (2) will maintain a presence at the work site whenever the general or sub-contractors are presence and all other employees shall have a 10-hour safety certificate issued by OSHA or other relevant competency training, as determine by the DVA.
Requirements:
(a) Contractor must be qualified and experienced to install this type of floor coverings. No unqualified worker shall do any type of work related to this project without the direct supervision of qualified personnel.
(b) Contractor shall conduct a site visit to verify site condition and the quantity of flooring product (s) required.
(c) Contractor shall notify VA Project Manager and COR in writing of any site conditions that may impair or prevent completion of the project as planned.
(d) Contractor shall provide to VA Contracting Officer, through VA COR, sample(s) of flooring prior to installation, as VA must accept first.
(e) Contractor shall obtain approval by VA Contracting Officer Representative (COR) before beginning any work.
(f) Contractor shall prep floor to accept new flooring in accordance with the new carpet manufacturer s requirements and specifications.
(g) Contractor shall install new floor covering in accordance with manufacturer s specifications.
(h) Contractor shall provide flooring manufacturer documentation providing material information/specifications for VA approval.
(i) Upon completion of installation, the contractor shall remove all unused materials, containers, wrappings, cuttings, trimmings and any other debris which has accumulated as a result of this service and transport/dispose of as required by law. Areas shall be clean.
(j) Contractor shall obtain certification of completion of work from the VA COR and VA Contracting Officer, see below.
A Certificate of Insurance (COI) shall be provided upon request.
There is no payment bonds, no performance bonds.
4. Inspection/Acceptance CO and COR will conduct final inspection and acceptance of contractor work. Contractor shall conduct all testing for their work portion and provide CO with validity or perform test in presence of CO. VA reserves the right to review contractor s work at any time.
5. Period of Performance Work is to begin after issuance of Notice to Proceed. Project completion time from Notice to Proceed is 15 calendar days.
6. Payment - Contractor shall submit 1 invoice at completion of work.
All work shall be performed as described herein and as specified in the body of the contract documents. Any other work not listed above but otherwise required as per Specification are included as the Statement of Work.
NAICS Code: 238330 Flooring Contractors Size Standard: $15 Million.

Files

File Type Posted
36C24219R0049-033.pdf PDF
36C24219R0049-029.docx DOCX document
36C24219R0049-031.pdf PDF
36C24219R0049-035.pdf PDF
36C24219R0049-032.pdf PDF
36C24219R0049-034.pdf PDF
36C24219R0049-036.pdf PDF
36C24219R0049-030.pdf PDF
36C24219R0049-024.pdf PDF
36C24219R0049-021.docx DOCX document
36C24219R0049-023.pdf PDF
36C24219R0049-025.pdf PDF
36C24219R0049-027.pdf PDF
36C24219R0049-022.pdf PDF
36C24219R0049-028.pdf PDF
36C24219R0049-026.pdf PDF
Show all 16

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity