Industry Day - Selma AL Flood Management Risk and Bank

Closed Special Notice Posted

Not the latest version. See the latest special notice from .

Solicitation number
W9127827RA009
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Selma, Alabama, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Mobile District, will conduct an industry day on October 28, 2026, from 9:00 to 11:00 a.m. CDT to discuss design and construction of a flood risk management and bank stabilization project near downtown Selma, Alabama. The event location has been updated to the Mobile District Office, 100 Canal St., Mobile, AL 36602; virtual attendance is available via Microsoft Teams. This is a Request for Information only; no award will result from the event.

The project involves approximately 1,000 linear feet of soldier-pile wall along the Alabama River, a secondary retaining wall, and rip-rap protection, with an estimated construction magnitude of $30 million to $40 million. The Corps will procure this as a Design-Build-to-Budget contract under NAICS 237990. Interested parties must email Jonas White at jonas.white@usace.army.mil by 5:00 PM CDT on October 23, 2026, providing name, contact information, company name, number of attendees, and participation preferences. The industry day includes a 45-minute presentation followed by open discussion and optional 30-minute individual breakout sessions. Key discussion topics include pile installation methods to minimize vibrations to historic structures, vibration monitoring protocols, tieback anchor systems, testing methodologies, site access and staging requirements, alternative stabilization methods, and contractor experience with projects in this cost range.

Notice text

2 versions

Update #2 · Latest ·

The U.S. Army Corps of Engineers, Mobile District, will conduct an industry day to discuss the design and construction of a flood risk management and bank stabilization project near downtown Selma, Alabama. The current design is anticipated to consist of approximately 1,000 linear feet of soldier-pile wall along the Alabama River. The soldier pile wall would be constructed to a top elevation of 100-ft NAVD88, and a secondary retaining wall would be constructed to a top elevation of 110-ft NAVD88. Rip-rap protection would be placed at the toe of the wall to a top elevation of 90-ft NAVD88.

*UPDATE - The event is scheduled from 9:00 to 11:00 a.m. CDT on Thursday, October 28, 2026, at the Mobile District Office, 100 Canal St., Mobile, AL 36602.

Update #1 ·

The U.S. Army Corps of Engineers, Mobile District, will conduct an industry day to discuss the design and construction of a flood risk management and bank stabilization project near downtown Selma, Alabama. The current design is anticipated to consist of approximately 1,000 linear feet of soldier-pile wall along the Alabama River. The soldier pile wall would be constructed to a top elevation of 100-ft NAVD88, and a secondary retaining wall would be constructed to a top elevation of 110-ft NAVD88. Rip-rap protection would be placed at the toe of the wall to a top elevation of 90-ft NAVD88.

The event is scheduled from 9:00 to 11:00 a.m. CDT on Thursday, October 28, 2026, at the Mobile District Annex Building, 201 Saint Michael St, Mobile, AL 36602.

Files

Notice history

Notice Type Posted
Industry Day Update: Selma Alabama Flood Risk Management and Bank Stabilization Project Latest special notice Special Notice
This notice Original Special Notice

Similar open opportunities

Opportunity Agency Set-aside Responses due
Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office Tuscaloosa, Alabama, Tuscaloosa County 35404 · NAICS 236220 ENDIST Mobile No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors