IFB Award for Shoreline protection at Camp Cronin fishing area and repair East shore Arm breakwater, Point Judith Harbor of refuge federal navigation project (FNP), Narragansett, Rhode Island.

Award Notice Posted

Solicitation number
W912WJ-14-B-0010
Agency
Awarded
to Rc&D, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W912WJ14C0019 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
More information

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

The work of this project involves constructing an ocean shoreline stone revetment at the Camp Cronin fishing area in Narragansett, Rhode Island, and constructing emergency repairs to the adjacent East Shore Arm Breakwater of the Point Judith Harbor of Refuge Federal Navigation Project, also in Narragansett, Rhode Island. The existing shoreline and breakwater were both damaged during Hurricane Sandy in October 2012. The shoreline revetment work tasks to construct the revetment involve excavation; furnishing and placing gravel bedding, stone filter materials, underlayer stone (up to 2,600 pounds in weight per stone), 2 ton stone (up to 2.2 tons in weight per stone), armor stone (up to 12 tons in weight per stone), cobble fill, crushed stone, and parking lot fill. Removing, stockpiling, and resetting existing cobble and boulders currently at the site of the work is required. Repairs to the breakwater will require the furnishment, delivery, and placement of new armor stone (up to 15 tons per stone) to replace stones displaced during Hurricane Sandy, and the filling in of existing gaps and low points along the breakwater. The repairs shall be performed to restore the breakwaters to their original profiles and cross-sections.

The tolerances required for the placement of stone in both profiles and cross-sections is extremely tight. Repairs will require substantial moving and manipulation of both new and existing stones to achieve both the required interlocking placement and design grades. The revetment and breakwater construction site is directly exposed to ocean waves, wind, and tides, and work shall be performed in wet and restricted tidal conditions.

Update #1 ·

The U.S. Army Corps of Engineers, New England District is issuing a unrestricted solicitation for Shoreline Protection at Camp Cronin Fishing Area and Repair East Shore Ann Breakwater, Point Judith Harbor of Refuge Federal Navigation Project (FNP), Narragansett, Rhode Island. The NAICS code for this procurement is 237990. The project is planned to be issued on or about May 30, 2014. The estimated construction cost is between $10,000,000.00 and $15,000,000.00.

The work of this project involves constructing an ocean shoreline stone revetment at the Camp Cronin fishing area in Narragansett, Rhode Island, and constructing emergency repairs to the adjacent East Shore Arm Breakwater of the Point Judith Harbor of Refuge Federal Navigation Project, also in Narragansett, Rhode Island. The existing shoreline and breakwater were both damaged during Hurricane Sandy in October 2012. The shoreline revetment work tasks to construct the revetment involve excavation; furnishing and placing gravel bedding, stone filter materials, underlayer stone (up to 2,600 pounds in weight per stone), 2 ton stone (up to 2.2 tons in weight per stone), armor stone (up to 12 tons in weight per stone), cobble fill, crushed stone, and parking lot fill. Removing, stockpiling, and resetting existing cobble and boulders currently at the site of the work is required. Repairs to the breakwater will require the furnishment, delivery, and placement of new armor stone (up to 15 tons per stone) to replace stones displaced during Hurricane Sandy, and the filling in of existing gaps and low points along the breakwater. The repairs shall be performed to restore the breakwaters to their original profiles and cross-sections. The tolerances required for the placement of stone in both profiles and cross-sections is extremely tight. Repairs will require substantial moving and manipulation of both new and existing stones to achieve both the required interlocking placement and design grades. The revetment and breakwater construction site is directly exposed to ocean waves, wind, and tides, and work shall be performed in wet and restricted tidal conditions.

This is not a request for proposals at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about May 30, 2014. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation, offerors must access the Federal Business Opportunities website (www.fbo.gov). All responsible sources may submit a proposal which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at kimberly.b.pumyea@usace.army.mil.

Files

File Type Posted
BidAbstractFullBreakdown.pdf PDF
BidSummary.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors