IDIQ-miscellaneour repairstask order 0006-fulton county rock

Award Notice Posted

Solicitation number
W912EQ-11-D-0003
Agency
Awarded
to My Company, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W912EQ-11-D-0003-0003 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

The work consists of furnishing all plant, labor and materials for covering riprap Fulton County, KY, to include placement of clay gravel fill, impervious fill for embankment, clearing, grubbing, and disposal of debris there from, aggregate surfacing, establishment of turf, and environmental protection. The work shall be located in Fulton County, Kentucky. The exact location will be indicated on the contract drawings.

Update #4 ·


The work consists of furnishing all plant, labor and materials for covering riprap Fulton County, KY, to include placement of clay gravel fill, impervious fill for embankment, clearing, grubbing, and disposal of debris there from, aggregate surfacing, establishment of turf, and environmental protection. The work shall be located in Fulton County, Kentucky. The exact location will be indicated on the contract drawings.

Update #3 ·

All work shall be performed at two separate sites as shown on enclosed plans. Gravel will be tailgated along gravel (haul) road identified on the enclosed plan sheet. Area Office Engineer (Jack Ratliff) and/or Site Supervisor (Matt Pierce) shall assist with identify areas for gravel placement. Contractor shall contact the Area Office Engineer prior to deliveries.

Update #2 ·

All work shall be performed at two separate sites as shown on enclosed plans. Gravel will be tailgated along gravel (haul) road identified on the enclosed plan sheet. Area Office Engineer (Jack Ratliff) and/or Site Supervisor (Matt Pierce) shall assist with identify areas for gravel placement. Contractor shall contact the Area Office Engineer prior to deliveries.

Update #1 ·

Deliver 5,000 tons of filter material to a dedicated stock pile near the Birds Point-New Madrid Levee in Mississippi County Missouri, stock pile location shown on the enclosed map.
(Hauling distance was calculated assuming 65 mile trip from quarry to stockpile.)

All turfing shall be performed at two separate sites (upper and lower) located along the levee. Area Office Engineer (Jack Ratliff) and/or Site Supervisor (Matt Pierce) shall identify areas for turfing with flagging. Contractor shall contact the Area Office Engineer prior to turfing. Enclosed are plans for the north (upper site) and south (lower site) areas.

Notice history

Notice Type Posted
Miscellaneous repairs Latest Award Notice
This notice Original Award Notice