Ice Harbor Dam Charbonneau Park Septic System Upgrades
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912EF25BA011
- Agency
-
ENDIST Walla Walla
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238910 Site Preparation Contractors
- Place of performance
- Washington 99323, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Walla Walla District is seeking construction services for septic system upgrades at Ice Harbor Dam Charbonneau Park in Washington State along the Snake River. The project involves upgrading the existing wastewater treatment system, which is classified as a Large On-site Septic System (LOSS) with a peak design capacity of 6,875 gallons per day serving a comfort station, 54 campsites, and a marina boat pump-out station. The contractor must be licensed for septic work in Washington State and will be required to install new tankage including one feed tank with two attached surge storage tanks and five treatment tanks in parallel configuration, while utilizing existing septic tanks. The work must comply with Washington State Department of Health requirements and Corps of Engineers Safety and Health Requirements Manual EM 385-1-1. The solicitation will be posted on sam.gov in July 2025 with proposals due approximately 30 days after posting, and the government expects to award the contract in September 2025.
This opportunity is set aside for Total Small Business under NAICS code 238910 (Site Preparation Contractors) with a size standard of $19.0 million. The contract value is estimated between $1,000,000 and $5,000,000 as a firm-fixed-price construction contract. The contractor will be required to provide 100% performance and payment bonds and must be registered in the System for Award Management (SAM) prior to award. The project involves replacing existing marina pump and two lift station pumps, with all work performed using the Government-furnished Resident Management System (RMS) for documentation and reporting. The contractor must develop and submit comprehensive safety documentation including an Accident Prevention Plan, Activity Hazard Analyses, and Fall Protection Plan for government acceptance.
Notice text
The U.S. Army Corps of Engineers (USACE) Walla Walla District intends to issue a construction solicitation for a project titled Ice Harbor Dam Charbonneau Park Septic System Upgrades. The work is located at Charbonneau Park located in Washington State along the Snake River. This will be a firm-fixed-price construction contract. The magnitude of construction is between $1,000,000 and $5,000,000. 100% performance and payment bonds will be required. The government expects to award one contract in September 2025. The North American Industry Classification System (NAICS) code for this project is 238910 - Site Preparation Contractors and the associated small business size standard is $19.0 million.
The solicitation will be made available for download on the sam.gov Contract Opportunities website in July 2025. Offerors are responsible for checking the referenced page for any updates to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted at the referenced website. Proposals will be due approximately 30 days after the solicitation is posted. The exact proposal due date will be indicated in the solicitation.
The existing Charbonneau Park wastewater treatment system in the scope of this planned contract is considered a Large On-site Septic System (LOSS), as its peak design capacity of 6,875 gallons per day (gpd) exceeds the 3,500 gpd On-site Sewage System (OSS) permit capacity threshold. The LOSS serves a comfort station, 54 campsites (18 of which have sewer connections, 16 are public sites and two are caretaker sites), and a marina boat pump-out station. The existing septic tank treatment system consists of a collection tank, two septic tanks in series (6,000-gallon primary tank and 3,000-gallon secondary tank) and a lift station tank for pressurized distribution to the drain field.
Under the planned Contract, the contractor will be required to provide the following construction services: The objective is to install a LOSS upgrade that meets the requirements of Washington State Department of Health (WADOH). The planned tankage for the system upgrade includes the use of the existing primary 6,000-gallon and 3,000-gallon septic tanks. Additionally, there will be one feed tank with two attached surge storage tanks, in series, located downstream of the existing two septic tanks, and five treatment tanks, in parallel, located downstream of the feed tank and upstream of the drain field lift station. All new tanks will be selected from the List of Registered Sewage Tanks, as established under WAC 246-272C as part of Washington State DOH 337-046.
The contractor will be required to install one feed tank with two attached surge storage tanks, in series, located downstream of the existing two septic tanks, and five treatment tanks, in parallel, located downstream of the feed tank and upstream of the drain field lift station. Septic system upgrade will also include replacement of the existing marina pump and two existing lift station pumps. Install specified materials by a licensed septic Contractor licensed for such work in Washington State. After award, Contractor must submit License showing they are a current licensed installer with the Washington State Department of Health.
System for Award Management (SAM): Offerors must register in the SAM at https://sam.gov/content/home prior to receiving an award.
Point of contact for this procurement is Preston Jones, Contract Specialist at Preston.E.Jones@usace.army.mil
All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).
The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1.
Use the Government-furnished Resident Management System (RMS) – Contractor Mode to record, maintain, and submit various information throughout the contract period. RMS is a Windows-based program capable of operating on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor at time of notice to proceed.
The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Ice Harbor Dam Charbonneau Park Septic System Upgrades | Award Notice | |
| Ice Harbor Dam Charbonneau Park Septic System Upgrades | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Jennifer Brown (COW) | Indian Health Service | Total Small Business | |
| Camp wooten/starbuck levee rehab | ENDIST Walla Walla | No set-aside | |
| Kelly Pierson OSS | Indian Health Service | Total Small Business | |
| FY26 Willapa Harbor Maintenance Dredging | ENDIST Seattle | No set-aside | |
| Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement | ENDIST Portland | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity