HYDMECH V-18-45 Vertical Mitering Semi-Automatic Band Saw
Closed Solicitation Posted
- Solicitation number
- M67004-25-Q-0048
- Agency
-
Marine Corps
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 333515 Cutting Tool and Machine Tool Accessory Manufacturing
- PSC
- 3414 Gear Cutting And Finishing Machines
- Place of performance
- Yermo, California 92398, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Marine Corps is seeking to procure a HYDMECH V-18-45 Vertical Mitering Semi-Automatic Band Saw through a direct solicitation for commercial items. The procurement is specifically for a brand-name band saw with precise technical requirements, including a 440V, three-phase electrical configuration. The solicitation (M67004-25-Q-0048) will evaluate quotes based on three primary factors: technical capabilities, price reasonableness, and past performance, with the intent to award to the most advantageous responsible offeror. No substitute products will be accepted, making this a highly specific procurement. The solicitation was posted on March 11, 2025, with quotes due by March 24, 2025, following federal acquisition regulations under FAR Subpart 12.6.
The contract is designated as a Total Small Business set-aside under NAICS code 333515, with a size standard of 500 employees. The procurement will include the band saw itself along with additional components such as a chip bucket, drag chain chip conveyor, fixed 3" canted head, mist lubrication system, two in-feed idler conveyors, and machine start-up assistance with operator training. The place of performance is located in Yermo, California, with an expected delivery date by April 30, 2025. While specific award value was not explicitly stated, the solicitation indicates a comprehensive equipment package with multiple line items. The government reserves the right to evaluate option pricing and may consider the total price of options during the assessment process, potentially declaring offers unacceptable if option prices are significantly unbalanced.
Notice text
4 versions
Update #4 · Latest ·
*** THE VENDOR MUST ACKNOWLEDGE AND COMPLY WITH ALL UPDATES TO THE QUESTIONS AND ANSWERS (Q&A) AND EXPLICITLY CONFIRM THIS COMPLIANCE IN THEIR PRICING SUBMISSION. ***
Questions and Answers #4 - March 19, 2025 - See attachment for details.
Questions and Answers #3 - March 18, 2025 - See attachment for details.
Questions and Answers #2 - March 17, 2025 - See attachment for details.
Questions and Answers #1 - March 11, 2025
- What voltage is necessary?
- 440V, three-phase.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This procurement is under a Total Small Business set-aside under NAICS code 333515 size standard of 500 employees. An Offeror’s submission of a quote does not constitute a contract or authorize work to begin. This document is not legally binding and does not commit the US Government in any way.
This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-03 and Defense Federal Acquisition Regulations Supplement Publication Notice (DPN) 20250117.
In accordance with FAR 12.102(c), when a policy in another part is inconsistent with FAR Part 12, Part 12 shall take precedence.
Basis for Award: The Government intends to award a contract resulting from this solicitation to the responsible offeror whose quotation conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors are listed in no specific order of precedence and will be used to evaluate quotations:
- Technical
- Price
- Past performance
Evaluation:
Technical: Quotes meeting all specifications outlined in this solicitation will be deemed technically capable. This is a brand-name requirement and only quotes for the brand-name product will be considered for award. No substitutes will be accepted.
Price Reasonableness: Will be conducted in accordance with FAR 13.106-3(a). The total quoted price, to include shipping costs, will be used in the price evaluation.
Past Performance: Evaluation will use procedures outlined in DFARS 204.7603 and described in provision 252.204-7024, incorporated herein.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
Update #3 ·
*** THE VENDOR MUST ACKNOWLEDGE AND COMPLY WITH ALL UPDATES TO THE QUESTIONS AND ANSWERS (Q&A) AND EXPLICITLY CONFIRM THIS COMPLIANCE IN THEIR PRICING SUBMISSION. ***
Questions and Answers #3 - March 18, 2025 - See attachment for details.
Questions and Answers #2 - March 17, 2025 - See attachment for details.
Questions and Answers #1 - March 11, 2025
- What voltage is necessary?
- 440V, three-phase.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This procurement is under a Total Small Business set-aside under NAICS code 333515 size standard of 500 employees. An Offeror’s submission of a quote does not constitute a contract or authorize work to begin. This document is not legally binding and does not commit the US Government in any way.
This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-03 and Defense Federal Acquisition Regulations Supplement Publication Notice (DPN) 20250117.
In accordance with FAR 12.102(c), when a policy in another part is inconsistent with FAR Part 12, Part 12 shall take precedence.
Basis for Award: The Government intends to award a contract resulting from this solicitation to the responsible offeror whose quotation conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors are listed in no specific order of precedence and will be used to evaluate quotations:
- Technical
- Price
- Past performance
Evaluation:
Technical: Quotes meeting all specifications outlined in this solicitation will be deemed technically capable. This is a brand-name requirement and only quotes for the brand-name product will be considered for award. No substitutes will be accepted.
Price Reasonableness: Will be conducted in accordance with FAR 13.106-3(a). The total quoted price, to include shipping costs, will be used in the price evaluation.
Past Performance: Evaluation will use procedures outlined in DFARS 204.7603 and described in provision 252.204-7024, incorporated herein.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
Update #2 ·
*** THE VENDOR MUST ACKNOWLEDGE AND COMPLY WITH ALL UPDATES TO THE QUESTIONS AND ANSWERS (Q&A) AND EXPLICITLY CONFIRM THIS COMPLIANCE IN THEIR PRICING SUBMISSION. ***
Questions and Answers #2 - March 17, 2025 - See attachment for details.
Questions and Answers #1 - March 11, 2025
- What voltage is necessary?
- 440V, three-phase.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This procurement is under a Total Small Business set-aside under NAICS code 333515 size standard of 500 employees. An Offeror’s submission of a quote does not constitute a contract or authorize work to begin. This document is not legally binding and does not commit the US Government in any way.
This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-03 and Defense Federal Acquisition Regulations Supplement Publication Notice (DPN) 20250117.
In accordance with FAR 12.102(c), when a policy in another part is inconsistent with FAR Part 12, Part 12 shall take precedence.
Basis for Award: The Government intends to award a contract resulting from this solicitation to the responsible offeror whose quotation conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors are listed in no specific order of precedence and will be used to evaluate quotations:
- Technical
- Price
- Past performance
Evaluation:
Technical: Quotes meeting all specifications outlined in this solicitation will be deemed technically capable. This is a brand-name requirement and only quotes for the brand-name product will be considered for award. No substitutes will be accepted.
Price Reasonableness: Will be conducted in accordance with FAR 13.106-3(a). The total quoted price, to include shipping costs, will be used in the price evaluation.
Past Performance: Evaluation will use procedures outlined in DFARS 204.7603 and described in provision 252.204-7024, incorporated herein.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
Update #1 ·
Questions and Answers #1 - March 11, 2025
- What voltage is necessary?
- 440V, three-phase.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This procurement is under a Total Small Business set-aside under NAICS code 333515 size standard of 500 employees. An Offeror’s submission of a quote does not constitute a contract or authorize work to begin. This document is not legally binding and does not commit the US Government in any way.
This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-03 and Defense Federal Acquisition Regulations Supplement Publication Notice (DPN) 20250117.
In accordance with FAR 12.102(c), when a policy in another part is inconsistent with FAR Part 12, Part 12 shall take precedence.
Basis for Award: The Government intends to award a contract resulting from this solicitation to the responsible offeror whose quotation conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors are listed in no specific order of precedence and will be used to evaluate quotations:
- Technical
- Price
- Past performance
Evaluation:
Technical: Quotes meeting all specifications outlined in this solicitation will be deemed technically capable. This is a brand-name requirement and only quotes for the brand-name product will be considered for award. No substitutes will be accepted.
Price Reasonableness: Will be conducted in accordance with FAR 13.106-3(a). The total quoted price, to include shipping costs, will be used in the price evaluation.
Past Performance: Evaluation will use procedures outlined in DFARS 204.7603 and described in provision 252.204-7024, incorporated herein.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
Files
| File | Type | Posted |
|---|---|---|
| M6700425Q0048_Q and A 4.docx | DOCX document | |
| M6700425Q0048_Q and A 3.docx | DOCX document | |
| M6700425Q0048_Q and A 2.docx | DOCX document | |
| M6700425Q0048_Q and A 1.docx | DOCX document | |
| Brand Name Justification_HYDMECH Band Saw.pdf | ||
| M6700425Q0048_HYDMECH V18_45.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Cutter per 13052983-102 | ACC Rock Island | No set-aside | |
| Cutter bit, tool HOL | Naval Supply Systems Command | No set-aside | |
| Pin | Naval Supply Systems Command | No set-aside | |
| Blue check tool | Naval Supply Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity