Hybrid vessel Charging System Project at Caven Point Marine Terminal
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912DS24S0055
- Agency
-
ENDIST New York
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 713930 Marinas
- Place of performance
- Jersey City, New Jersey 07305, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District New York is seeking to procure the construction and installation of a new shore power station at the Caven Point Marine Terminal. The work will include the demolition of existing infrastructure and the installation of new mooring dolphins, fender systems, and utility services. The key objectives are to provide 480VAC 3 phase power at 550 amps to a DCV DRIFTMASTER II vessel to recharge its batteries. The procurement will be evaluated based on the contractor's ability to meet the technical requirements and timeline for the project. The pre-solicitation notice has a due date of August 22, 2024.
This procurement is not set aside for any specific business category. There are no identified incumbent contractors. The award value or budget range for this project is not provided in the pre-solicitation notice. The work includes the installation of seven new mooring dolphins and associated infrastructure at the Caven Point Marine Terminal.
Notice text
The work that will be performed under this contract will includes demolition of existing timber fender piles, timber rub rail, and removal of existing pavement and trench drain for the installation of seven (7) new mooring dolphins. Each mooring dolphin is comprised of six tubular steel casing pipe piles (micropiles) connected to a reinforced concrete cap. Each mooring dolphin micropile is socketed to rock using a threaded bar anchoring system. Each mooring dolphin is furnished with a new steel bollard for mooring and tubular steel rub rail connected to the existing concrete cap beam using post installed epoxy anchors. The new fender system is comprised of foam-filled camels braced against vertical steel pipe piles that are connected to molded rubber cone fenders with a fabricated steel guide pile sleeve assembly. Work also includes installation of new utility service and powering of project equipment. This work will consist of the construction and installation of a new shore power station capable of delivering 480VAC 3 phase power at 550 amps to the DCV DRIFTMASTER II to recharge the vessels batteries.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Hybrid vessel Charging System Project at Caven Point Marine Terminal | Award Notice | |
| Hybrid vessel Charging System Project at Caven Point Marine Terminal | Solicitation | |
| Hybrid vessel Charging System Project at Caven Point Marine Terminal | Pre-Solicitation | |
| This notice | Pre-Solicitation | |
| Hybrid vessel Charging System Project at Caven Point Marine Terminal | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity