Hybrid vessel Charging System Project at Caven Point Marine Terminal

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W912DS24S0055
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
713930 Marinas
Place of performance
Jersey City, New Jersey 07305, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Engineering District New York is seeking to procure the construction and installation of a new shore power station at the Caven Point Marine Terminal. The work will include the demolition of existing infrastructure and the installation of new mooring dolphins, fender systems, and utility services. The key objectives are to provide 480VAC 3 phase power at 550 amps to a DCV DRIFTMASTER II vessel to recharge its batteries. The procurement will be evaluated based on the contractor's ability to meet the technical requirements and timeline for the project. The pre-solicitation notice has a due date of August 22, 2024.

This procurement is not set aside for any specific business category. There are no identified incumbent contractors. The award value or budget range for this project is not provided in the pre-solicitation notice. The work includes the installation of seven new mooring dolphins and associated infrastructure at the Caven Point Marine Terminal.

Notice text

The work that will be performed under this contract will includes demolition of existing timber fender piles, timber rub rail, and removal of existing pavement and trench drain for the installation of seven (7) new mooring dolphins. Each mooring dolphin is comprised of six tubular steel casing pipe piles (micropiles) connected to a reinforced concrete cap. Each mooring dolphin micropile is socketed to rock using a threaded bar anchoring system. Each mooring dolphin is furnished with a new steel bollard for mooring and tubular steel rub rail connected to the existing concrete cap beam using post installed epoxy anchors. The new fender system is comprised of foam-filled camels braced against vertical steel pipe piles that are connected to molded rubber cone fenders with a fabricated steel guide pile sleeve assembly. Work also includes installation of new utility service and powering of project equipment. This work will consist of the construction and installation of a new shore power station capable of delivering 480VAC 3 phase power at 550 amps to the DCV DRIFTMASTER II to recharge the vessels batteries.

Notice history

Notice Type Posted
Hybrid vessel Charging System Project at Caven Point Marine Terminal Award Award Notice
Hybrid vessel Charging System Project at Caven Point Marine Terminal Latest solicitation Solicitation
Hybrid vessel Charging System Project at Caven Point Marine Terminal Pre-Solicitation
This notice Pre-Solicitation
Hybrid vessel Charging System Project at Caven Point Marine Terminal Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity