Hurricane shutter installation airsta savannah
Award Notice Posted
- Solicitation number
- HSCG-12-N-PMW131
- Agency
-
Coast Guard
Department of Homeland Security
- Awarded
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- HSCG-12-N-PMW131
- NAICS code
- 332321 Metal Window and Door Manufacturing
- PSC
- Not on record
- Place of performance
- Uscg Air Station Savannah 1297 N Lighting Rd Savannah, Georgia 31409, United States
Notice details come from SAM.gov. Updated .
Notice text
This combined synopsis/solicitation for commercial
services is prepared in accordance with the format in subpart 12.6 of the
Federal Acquisition Regulation (FAR). Air Station Savannah requires the
installation of permanent hurricane shutters for the north facing
windows on the Operations building. The solicitation number is HSCG28-12-N-PMW131. Some
Applicable North American Industry Classification
Standard (NAICS) codes are:332321/332999/236220/236210
The contract will be awarded using simplified acquisition procedures in
accordance with FAR part 13.Quotes are to be received no later than
close of business(4 p.m.)on September 7,2012. Faxed quotations will be accepted
at 305-415-7092. SCOPE of WORK See attached SOW for complete requirements.
The estimated price of this requirement is $38,000 to $48,000.
Quotes will be evaluated on lowest cost technically acceptable.
FAR 28.102-1 states construction contracts greater than $30,000 but less than $150,000, the selected supplier shall provide a Payment Bond.
Quotes are to be received no later than close of business (4 p.m.) on September 7, 2012. Faxed quotations will be accepted at 305-415-7092.
Quotations sent via the US Postal Service or hand delivered should be sent to:
Commanding Officer
USCG Base Miami Beach (P&C)
Attn: Pedro Tirado
909 SE 1st Ave, Room 512
Miami, FL 33131.
Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable) will be issued in FEDBIZOPS (www.fbo.gov).
Wage determinations: GA31409 08/24/2012 Construction type: Building
SCOPE OF WORK: See attached SOW for the complete statement of requirements.
Performance Period: Contractor will be provided a 30 day period for completion of project once a start date has been agreed upon by the Contracting Officers Technical Rep and Contractor.
Site visit: is highly recommended that prospective bidders arrange for a site visit with the Facilities Engineering Officer or his direct representative to visually inspect the areas that are listed on the Scope of Work. Facilities Engineer can be reached at 586-419-7706, LCDR GREG HOUGHTON.
Work hours: Monday through Friday, 0800 1700 ( 8 a.m 5 p.m) No weekends or Holidays.
The following FAR provisions/clauses apply to this solicitation. Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far
Fixed-Price Construction Contract Clauses
The following Clauses are incorporated by Reference
FAR 52.204-7 Central Contractor Registration (Feb 2012)
FAR 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011)
FAR 52.213-4 Terms and Conditions-Simplified Acquisition (Other Than Commercial
Items) (Mar 2012)
FAR 52.219-1 Small Business Program Representations (Apr 2012)
FAR 52.219-6 Notice of Total Small business Set-Aside (Nov 2011)
FAR 52.222-3 Convict Labor (Jun 2003)
FAR 52.222-6 Davis-Bacon Act (Jul 2005)
FAR 52.222-7 Withholding of Funds (Feb 1988)
FAR 52.222-8 Payrolls and Basic Records (Jun 2010)
FAR 52.222-9 Apprentices and Trainees (Jul 2005)
FAR 52.222-10 Compliance with Copeland Act Requirements (Feb 1988)
FAR 52.222-11 Subcontracts (Labor Standards) (Jul 2005)
FAR 52.222-12 Contract Termination-Debarment (Feb 1988)
FAR 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (Feb 1988)
FAR 52.222-14 Disputes Concerning Labor Standards (Feb 1988)
FAR 52.222-15 Certification of Eligibility (Feb 1988)
FAR 52.222-21 Prohibition of Segregated Facilities (Feb 1999)
FAR 52.222-26 Equal Opportunity (Mar 2007)
FAR 52.222-27 Affirmative Action Compliance Requirements for Construction (Feb 1999)
FAR 52.222-36 Affirmative Action for Workers with Disabilities (Oct 2010)
FAR 52.222-50 Combating Trafficking in Persons (Feb 2009)
FAR 52.223-5 Pollution Prevention and Right-to-know Information (May 2011)
FAR 52.223-18 Encouraging Contractor Policies to Ban Test Messaging While Driving
(Aug 2011)
FAR 52.225-13 Restrictions on Certain Foreign Purchases (Jun 2008)
FAR 52.227-1 Authorization and Consent (Dec 2007)
FAR 52.227-4 Patent Indemnity Construction Contracts (Dec 2007)
FAR 52.228-2 Additional Bond Security (Oct 1997)
FAR 52.228-11 Pledges of Assets (Jan 2012)
FAR 52.228-12 Prospective Subcontractor Request for Bonds (Oct 1995)
FAR 52.228-13 Alternative Payment Protections (Jul 2000)
(a) The Contractor shall submit one of the of the following payment protections:
(i) A payment bond (100% of the total contract price)
(ii) An irrevocable letter of credit (ILC)
(iii) A deposit of the type of security listed in FAR 28.204-1
and FAR 28.204-2.
(b) The submission of the payment protection is required with five (7)
calendar days of contract award.
(c) Payment bonds are retained for a period of one-year following
final payment or until resolution of all claims filed again the
payment bond.
FAR 52.232-5 Payments under Fixed-Price Construction Contracts (Sep 2002)
FAR 52.232-27 Prompt Payment for Construction Contracts (Oct 2008)
FAR 52.232-33 Payment by Electronic Funds Transfer-CCR (Oct 2003)
FAR 52.233-1 Disputes (Jul 2002)
FAR 52.233-3 Protest After Award (Aug 1996)
FAR 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004)
FAR 52.236-2 Differing Site Conditions (1984)
FAR 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984)
FAR 52.236-5 Material and Workmanship (Apr 1984)
FAR 52.236-7 Permits and Responsibilities (Nov 1991)
FAR 52.236-14 Availability and Use of Utility Services (Apr 1984)
FAR 52.236-17 Layout of Work
FAR 52.236-27 Site Visit (Construction)(Feb 1995)
FAR 52.242-14 Suspension of Work (Apr 1984)
FAR 52.243-5 Changes and Changed Conditions (April 1984)
FAR 52.249.1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (Apr 2984)
FAR 52.249-10 Default (Fixed Price Construction) (Apr 1984)
FAR 52.252-2 Clauses Incorporated by Reference (Feb 1998). This contract incorporates
One or more clauses by reference, with the same force and effect as if they
were given in full test. Upon request, the Contracting Officer will make
their full text available. Also, the full text of a clause may be accessed
electronically at this/these address(es): http://www.arnet.gov/far
DEPARTMENT OF HOMELAND SECURITY REGULATION (48 CFR CHAPTER 30)
3052.228-90 Notification of Miller Act Payment Bond Protection (Dec 2003)
NOTE: Once Payment Bond is received, a Notice to Proceed will be issued.
Files
| File | Type | Posted |
|---|---|---|
| Wage Deter PMW131.pdf | ||
| SF1142 2312282PMW131.pdf | ||
| SOW PMW131.pdf | ||
| SF30PMW131.pdf | ||
| SF1142 2312282PMW131.pdf | ||
| SOW PMW131.pdf | ||
| Wage Deter PMW131.pdf | ||
| Wage Deter PMW131.pdf | ||
| SOW PMW131.pdf | ||
| SF1142 2312282PMW131.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity