Hulah Lake Toe Drain, Bowring, Oklahoma

Closed Solicitation Posted

Solicitation number
W912BV25RA004
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
396120 State Hwy 10 Copan, OK 74022 74056

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Engineering District Tulsa is soliciting bids for infrastructure improvements at Hulah Lake in Bowring, Oklahoma, specifically for the demolition and reconstruction of the toe drain system and toe road culverts. The work encompasses demolishing existing toe drain piping, manholes, and relief well connections (excluding the system between manholes 6 and 8), removing three existing toe road culverts, and constructing new perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and new reinforced concrete pipe culverts with pre-cast flared ends and riprap protection. The new toe drain system will integrate with existing manholes 6 and 8 to maintain continuity of the overall drainage infrastructure. A pre-bid conference was held on July 10, 2025, with multiple potential contractors in attendance, and proposals are due by July 30, 2025.

This opportunity is designated as a Total Small Business set-aside under NAICS code 237990 (Other Heavy and Civil Engineering Construction) and PSC code Z1KA (Maintenance of Dams). The work will be performed at 396120 OK-10, Copan, OK 74022, with the project focusing on critical dam infrastructure maintenance and improvement. The sign-in sheet from the pre-bid conference indicates interest from multiple specialized contractors including C-Techno and Golder (USA), suggesting competitive bidding for this civil engineering project. The solicitation was posted on June 25, 2025, providing contractors with approximately five weeks to prepare their proposals for this dam maintenance and reconstruction project. No specific contract value or performance timeline details were provided in the available documentation.

Notice text

PROJECT NARRATIVE/ SUMMARY The work includes, but is not limited to, the following: 1. Demolition of the existing toe drain system, to include toe drain piping, manholes, and relief well connections. This excludes the existing toe drain system between existing manholes 6 and 8.2. Demolition of existing toe road culverts (three total), to include culvert pipe and flare ends. 3. Construction of new toe drain system including, but not limited to, perforated toe drain piping, non-perforated relief well piping, precast concrete manholes, and non-perforated relief well connector piping. The new toe drain system will tie into the existing manholes 6 and 8.4. Construction of new toe road culverts including, but not limited to, reinforced concrete pipe, pre-cast flared ends, and riprap around new flared ends.

Files

File Type Posted
Sign in Sheet.pdf PDF

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Hulah Lake Toe Drain, Bowring, Oklahoma Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Sewage Ejector and Line Assessment NAICS 237110 ENDIST Tulsa No set-aside
Tenkiller Hydropower Excitation System Replacement Gore, Oklahoma, United States · NAICS 237990 ENDIST Tulsa No set-aside
Arcadia Wet Well Rehabilitation NAICS 237990 ENDIST Tulsa No set-aside
Webbers Falls Excitation System Replacements NAICS 237990 ENDIST Tulsa No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity