Houston Ship Channel Placement Area Improvements, Harris County, TX
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912HY23B0021
- Agency
-
ENDIST Galveston
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KF Maintenance Of Dredging Facilities
- Place of performance
- Galveston, Texas 77554, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Galveston District, intends to issue a solicitation for construction services for improvements to the Pelican Island Placement Area in Harris County, Texas. Work will include dewatering, raising dikes, and replacing an outfall structure. The solicitation will be an Invitation for Bid evaluated on price in accordance with FAR 41.1 and will result in a single firm fixed price construction contract with an estimated performance period of 330 days from notice to proceed. Bids are due on or about August 31, 2023.
This procurement has been set aside as 100% small business and falls under NAICS code 237990 with a size standard of $45,000,000. The estimated value of the contract is between $10,000,000 and $25,000,000. Registration on Sam.gov is required to view the solicitation, which will be available on or about August 1, 2023. Payment and bid bonds will be required, and the point of contact is listed as Jaclyn Yocum of the U.S. Army Corps of Engineers, Galveston District.
Notice text
The U.S. Army Corps of Engineers, Galveston District, intends to issue a Solicitation for construction services for the project titled “Houston Ship Channel Peggy Lake Placement Area Improvements, Harris County, TX.”
The work entails dewatering, dike raising, and replacement of the existing outfall structure (NE end of the PA) at Pelican Island PA. Pelican PA, an upland siter for the Galveston Harbor and Channel Project, is located west of the Galveston Harbor and Channel and South of the Texas City Channel on Pelican Island. Work will consist of a varying amount of dewatering ditches to dry material and facilitate interior drainage as well as a kike raise and outfall structure replacement.
At this time, no Pre-Solicitation Conference is planned for this solicitation. If the government does elect to hold a Pre-Solicitation Conference, the pre-solicitation announcement will be modified accordingly.
At this time, no organized site visit is planned for this solicitation. If the government does schedule a site visit, the details will be included in the solicitation.
If there is any change to the scheduled site visit, the correct time and location will be included in the solicitation, or amendments as applicable.
There are no option CLINs that have been identified for this project.
In accordance with FAR 36.204 and DFARS 236.204, the estimated magnitude of this construction project is between $10,000,000 and $25,000,000.
This solicitation will be issued as an Invitation for Bid (IFB) and evaluated based on price and in accordance with FAR 41.1 The IFB will result in the award of a single firm fixed price (FFP) construction contract.
The estimated performance period for completion of construction is 330 days from Notice to Proceed (NTP).
The solicitation will be available on or about August 1, 2023 and bids will be due on or about August 31, 2023. The solicitation, including any amendments, shall establish the official opening and closing dates and times.
Bid Bonds and Payment bonds will be required. Payment bonds will be required for the full amount (100%) of the awarded contract before Notice to Proceed can be issued. See FAR Clause 52.228-13.
The North American Industry Classification System (NAICS) Code for this project is 237990 – Other Civil and Civil Engineering Construction, with a size standard of $45,000,000.00. For the purposes of this procurement, a concern is considered a small business if its annual average gross revenue, taken for the last 3 fiscal years, does not exceed the size standard stated above.
This solicitation is being issued as 100% Small Business Set-Aside.
To view or download the solicitation requires registration at the Contracting Opportunities via the Sam.gov website at http://www.sam.gov. Downloads are available only through the Contracting Opportunities – Sam.gov website. Any amendments will only be available from the Contracting Opportunities – Sam.gov website. Offerors are responsible for checking the Contracting Opportunities – Sam.gov website frequently for any update(s) to this Pre-Solicitation Announcement or amendments to the Solicitation. The website is occasionally inaccessible due to maintenance. The government is not responsible for any loss of internet connectivity or for an offerors inability to access the document at the referenced website.
Prior to bidding, vendors must be actively registered in the System for Award Management (SAM) system. The System for Award Management (SAM) is a Federal Government owned and operated free web site that consolidates the capabilities in CCR, ORCA, and EPLS. All vendors must verify their information through this web site.
The point-of-contact for administrative for contractual questions is Jaclyn Yocum via email: Jaclyn.C.Yocum@usace.army.mil.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Houston ship channel peggy lake placement area improvements, harris county TX | Award Notice | |
| Houston ship channel peggy lake placement area improvements, harris county TX | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FY26 Harlingen Placement Area (PA)13 and 10 Improvements | ENDIST Galveston | No set-aside | |
| FY27 Texas City Ship Channel Main Channel and Turning Basin | ENDIST Galveston | No set-aside | |
| FY26 houston ship channel, texas bayport flare hopper dredging | ENDIST Galveston | No set-aside | |
| Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging | ENDIST Galveston | No set-aside | |
| Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM25011) | ENDIST New Orleans | No set-aside |