Hoskins Creek Maintenance Dredging Project

Closed Solicitation Posted

Solicitation number
W9123623B5017
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Hoskins Creek Maintenance Dredging Project - USACE NAO is seeking a small business capable of providing maintenance dredging comprising of hydraulic maintenance dredging of Hoskins Creek, transport of material by pipeline with placement within the confined upland placement site as shown in the drawings and contract specifications, and minor site-work of the confined upland placement site. Dredging will include the entirety of the authorized channel to a depth of -11 feet mean lower low water (MLLW) and will include 1 foot of allowable overdepth. The confined upland placement site will require clearing and grubbing only within the inner cell in addition to grading within the inner cell to promote proper flow of dredge material to the spillbox. It will be the responsibility of the Contractor to determine the extent of repairs necessary for proper functionality and safety standards stated in the solicitation. Period of performance to complete the work will be 300 days from Notice to Proceed. All time of year restrictions and requirements stated in paragraph 1.3.1 have been considered in the given period of performance timeframe.

Update #1 ·

Hoskins Creek Maintenance Dredging Project - USACE NAO is seeking a small business capable of providing maintenance dredging comprising of hydraulic maintenance dredging of Hoskins Creek, transport of material by pipeline with placement within the confined upland placement site as shown in the drawings and contract specifications, and minor site-work of the confined upland placement site. Dredging will include the entirety of the authorized channel to a depth of -11 feet mean lower low water (MLLW) and will include 1 foot of allowable overdepth. The confined upland placement site will require clearing and grubbing only within the inner cell in addition to grading within the inner cell to promote proper flow of dredge material to the spillbox. It will be the responsibility of the Contractor to determine the extent of repairs necessary for proper functionality and safety standards stated in the solicitation. Period of performance to complete the work will be 300 days from Notice to Proceed. All time of year restrictions and requirements stated in paragraph 1.3.1 have been considered in the given period of performance timeframe.

Files

File Type Posted
W9123623B5017_Abstract of Offerors_FINAL_20230821.pdf PDF

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Hoskins Creek Maintenance Dredging Pre-Solicitation
Hoskins Creek Maintenance Dredging Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors