Hose Assemblies
Closed Solicitation Posted
- Solicitation number
- N4523A25Q4111
- Agency
-
Naval Supply Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
- PSC
- 4720 Hose And Flexible Tubing
- Place of performance
- Bremerton, Washington 98314, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Puget Sound Naval Shipyard & Intermediate Maintenance Facility is seeking to procure various hose assemblies through this combined synopsis solicitation under NAICS code 332999. The requirement includes seven different hose assembly configurations with varying specifications: 1/2 inch ID hoses in lengths of 120, 780, and 1500 inches, and a 2-inch ID hose of 64.5 inches, all designed for high-pressure applications with 2,000 PSI working pressure and specific material requirements including PTFE liners, stainless steel wire braiding, and silicone outer jackets. Contractors must demonstrate technical capability through rigorous hydrostatic testing, maintain strict cleanliness standards, and provide Certificates of Compliance for all deliverables. The evaluation will consider ability to meet delivery schedule, technical capability, past performance, and price, with technical and past performance combined being approximately equal to price in importance. After multiple amendments extending the deadline, quotes are now due by August 25, 2025 at 9:00 AM, with vendors required to submit completed vendor information sheets, signed solicitation amendments, manufacturer part number submittals, and specification sheets.
This procurement is designated as a total small business set-aside under NAICS code 332999 with a size standard of 750 employees, and no current contractors or incumbents are identified in the documentation. The solicitation covers a total of 20 hose assemblies across all line items, with quantities ranging from 2 to 6 units per configuration. The required delivery date has been extended from October 10, 2025 to November 5, 2025, with all hose assemblies to be delivered to the Puget Sound Naval Shipyard and Intermediate Maintenance Facility in Bremerton, Washington. While specific contract values are not disclosed in the available documentation, the requirement allows for partial delivery and emphasizes the critical nature of the technical specifications for supporting naval operations. The solicitation period has been amended multiple times, ultimately running from August 15, 2025 through August 25, 2025, providing vendors additional time to prepare comprehensive technical responses.
Notice text
3 versions
Update #3 · Latest ·
AMENDMENT 2: A potential vendor requested to have the solicitation due date extended. A copy of the request/response is added to the attachments page. The solicitation is extended to August 25, 2025 at 9:00AM. (solicitation period 8.15.2025 - 8.25.2025)
AMENDMENT:
8.15.2025: This requirement is being re-solicited and specific new requirements added. Please pay attention to the all documents and requirements. Added to the attachments: solicitation modification that must be electronically signed and returned as verification of receipt. NOTE: A conformed copy of the solicitation with additonal information and new attachments are included.
> return 1) vendor information sheet (filled-in), 2) solicitation amendment (signed), 3) conformed copy of solicitation, 4) Mfr & Part number submittal
> the solicitation period is 8.15.2025 - 8.20.2025 (time due is on solicitation ).
------
NOTE: Read all paperwork carefully for compliance and pay special attention to the NAICS Code being used. The NAICS Code must be listed in your SAM profile.
1. Make sure there is a Point of Contact Name, Email, and Phone Number on your submittal.
2. RETURN all paperwork requested (RFQ & any attached forms).
This is a combined synopsis solicitation for a HOSE ASSEMBLIES
See the attached RFQ and other documents for details of the requirement and submittal instructions.
Note- all ordering data sheets are imbedded into the solicitation document. PARTIAL DELIVERY AUTHORIZED
Update #2 ·
AMENDMENT:
8.15.2025: This requirement is being re-solicited and specific new requirements added. Please pay attention to the all documents and requirements. Added to the attachments: solicitation modification that must be electronically signed and returned as verification of receipt. NOTE: A conformed copy of the solicitation with additonal information and new attachments are included.
> return 1) vendor information sheet (filled-in), 2) solicitation amendment (signed), 3) conformed copy of solicitation, 4) Mfr & Part number submittal
> the solicitation period is 8.15.2025 - 8.20.2025 (time due is on solicitation ).
------
NOTE: Read all paperwork carefully for compliance and pay special attention to the NAICS Code being used. The NAICS Code must be listed in your SAM profile.
1. Make sure there is a Point of Contact Name, Email, and Phone Number on your submittal.
2. RETURN all paperwork requested (RFQ & any attached forms).
This is a combined synopsis solicitation for a HOSE ASSEMBLIES
See the attached RFQ and other documents for details of the requirement and submittal instructions.
Note- all ordering data sheets are imbedded into the solicitation document. PARTIAL DELIVERY AUTHORIZED
Update #1 ·
NOTE: Read all paperwork carefully for compliance and pay special attention to the NAICS Code being used. The NAICS Code must be listed in your SAM profile.
1. Make sure there is a Point of Contact Name, Email, and Phone Number on your submittal.
2. RETURN all paperwork requested (RFQ & any attached forms).
This is a combined synopsis solicitation for a HOSE ASSEMBLIES
See the attached RFQ and other documents for details of the requirement and submittal instructions.
Note- all ordering data sheets are imbedded into the solicitation document. PARTIAL DELIVERY AUTHORIZED
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Hose assembly, nonme | Naval Supply Systems Command | No set-aside | |
| Hose assembly, nonme | Naval Supply Systems Command | No set-aside | |
| Hose assy | Naval Supply Systems Command | No set-aside | |
| Hose, pump, 60X1050MM | Naval Supply Systems Command | No set-aside | |
| Hose, nonmetallic | Naval Supply Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity