Horizontal Construction MATOC

Closed Solicitation Posted

Solicitation number
W9127826RA088
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Various locations in the Mobile District AOR in MS, AL, and FL. 36602

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Mobile District seeks one MATOC for a full range of horizontal construction, renovation, repair, and incidental design task orders for general construction at 12 locations in Alabama, Florida, Georgia, and Mississippi, with proposals due September 24. The procurement is a Total Small Business set-aside and is structured as a Best Value, two-phase design-build solicitation under a single solicitation document.

Phase One will evaluate all offerors on technical approach and performance capability to determine which firms advance to Phase Two. A limited number of selected offerors will receive an amendment with detailed project design requirements at the start of Phase Two and will submit Phase Two proposals. The RFP package includes a detailed project description and overall performance requirements; the solicitation criteria rely on industry standards where allowable to provide offerors design flexibility while meeting specific project requirements. The successful contractor must design and construct complete and usable facilities as described in the RFP documents.

Place of performance spans 12 locations across Alabama, Florida, Georgia, and Mississippi. NAICS code 237990 (Other Heavy and Civil Engineering Construction) and PSC Z2JZ (Repair or Alteration of Miscellaneous Buildings) apply. Amendment 0001 was posted September 21, 2026.

Notice text

2 versions

Update #2 · Latest ·

The Mobile District COE has a need for one MATOC for a full range of horizontal construction, renovation, repair, and some incidental design task orders for general construction primarily at 12 locations in AL, FL, GA, and MS. This project is a Best Value, two-phase design-build solicitation. A detailed project description and overall project performance requirements for this project will be included in the Request For Proposals (RFP) package. The solicitation criteria relies upon industry standards, where allowable, to afford the offeror a degree of design flexibility while meeting certain specific project requirements. The successful Contractor must design and construct complete and usable facilities, as described in the RFP documents. One solicitation will be issued covering both phases. Proposals will be evaluated in Phase One to determine which offerors will submit proposals for Phase Two, and an amendment will be issued to those selected offerors. Selection of offerors for involvement in Phase Two will be based on technical approach and performance capability. Detailed project design requirements will then be added by amendment to the solicitation at the start of the Phase Two stage of the Request For Proposals. A limited number of firms will be invited to participate in the second phase. Amendment 0001 is posted 21 September 2026.

Update #1 ·

The Mobile District COE has a need for one MATOC for a full range of horizontal construction, renovation, repair, and some incidental design task orders for general construction primarily at 12 locations in AL, FL, GA, and MS. This project is a Best Value, two-phase design-build solicitation. A detailed project description and overall project performance requirements for this project will be included in the Request For Proposals (RFP) package. The solicitation criteria relies upon industry standards, where allowable, to afford the offeror a degree of design flexibility while meeting certain specific project requirements. The successful Contractor must design and construct complete and usable facilities, as described in the RFP documents. One solicitation will be issued covering both phases. Proposals will be evaluated in Phase One to determine which offerors will submit proposals for Phase Two, and an amendment will be issued to those selected offerors. Selection of offerors for involvement in Phase Two will be based on technical approach and performance capability. Detailed project design requirements will then be added by amendment to the solicitation at the start of the Phase Two stage of the Request For Proposals. A limited number of firms will be invited to participate in the second phase.

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Horizontal Construction MATOC Original Special Notice

Similar open opportunities

Opportunity Agency Set-aside Responses due
Vertical Construction MATOC Multiple Locations in the Mobile District AOR, AL, FL, GA, and MS. 36602 · NAICS 238990 ENDIST Mobile Total Small Business
Small Business D/B Military Construction MATOC NAICS 236220 ENDIST Louisville Total Small Business
Sources sought notice - VISN 7 construction MATOC 36C24726R0026 Decatur, Georgia 30033, United States · NAICS 236220 Veterans Integrated Service Network 7 Service-Disabled Veteran-Owned Small Business
Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office Tuscaloosa, Alabama, Tuscaloosa County 35404 · NAICS 236220 ENDIST Mobile No set-aside
Multiple Award Task Order Contract (MATOC) Healthcare Facility Construction, Repair, and Renovation Services, California DVA healthcare and administrative facilities throughout California · NAICS 236220 ENDIST Los Angeles No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity