Homeporting new fast response cutters (FRC) at USCG base miami, FL
Award Notice Posted
- Solicitation number
- HSCG47-10-J-A11054
- Agency
-
Coast Guard
Department of Homeland Security
- Awarded
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- HSCG47-10-J-A11054-MODS
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
Modifications P00006 and P00007 were issued to Tesoro Corporation who is the incumbent contractor on this project.
P00006: Description of Work/Requirement: Demobilization and remobilization of pile installation and crew. Removal and re-installation of the earthen berm for the piles installation. Demobilization and remobilization of the concrete crew and equipment. Excavate and remove excess concrete found during demolition of the bollard sites. Backfill bollard sites with gravel to allow access to those areas.
P00007: Description of Work/Requirement: Provide a 400 ampere, 480 VAC (Mil-C-24368/2) interlocked power module in the shore power enclosure at Berths 7/8. Provide 12 surge protective devices (SPD) on all remaining ungrounded shoretie stations (Berths 1-8 & 11).
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Award Notice | |
| Design and construct new and modified existing infrastructure required for homeporting new fast response cutters (FRC) at the U. S. Coast fuard base support unit miami, FL | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity