HELENA-LEWIS & CLARK NATIONAL FOREST - Hay Canyon Campground Improvements

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1240LN22Q0034
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Hobson, Montana, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Amendment 002 - This amendment changes Page 11, Picnic Table Details, of the drawings. View all changes circled in red on attached sheet. General changes are:
- Adjust table and bench leg spacing to allow required 2 feet overhang on the table top (8') and add 1 foot to the concrete base (13') to ensure ADA accessibility
- Concrete base can be precast or cast-in-place
- Change rebar reinforcements for base from 11" to 12"

Amendment 001 - Confirms that the Schedule B is correct. An error exists in item 20440 in the Estimated Quantities table on page 2 of the plans document. It should read, Construct or Reconstruct Camping Spurs, Compaction Method 2, Tolerance Class E.

Description of Work.

The project consists of improvements to the existing Hay Canyon Campground.

Specific improvements to the Hay Canyon Campground include, but are not limited to removal and disposal of the existing campsite components; roadway excavation and embankment; construction of camping spurs; construction of camp unit items; barrier rock installation; aggregate surfacing; bulletin board installation; picnic table installation; fire ring installation; fee tube installation; sign installation; culvert installation; campsite numbering post installation; and all other incidental items necessary to complete the project in accordance with the plans and specifications. 

The contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and shall perform all work required to complete the project as shown on the plans, shown on the manufacturer’s shop drawings, and as described in the Standard Specifications (FP-14) and Forest Service Supplemental Specifications (FSSS).

Project Location

The project site is located in the Judith-Musselshell Ranger District of the Helena-Lewis and Clark National Forest - approximately 17 miles southwest of Utica in Judith Basin County, MT (Section 14, T 12N, R 11E). Refer to the location map on the title sheet of the plans.

Price Range.  $100,000 - $250,000

Update #2 ·

Amendment 001 - Confirms that the Schedule B is correct. An error exists in item 20440 in the Estimated Quantities table on page 2 of the plans document. It should read, Construct or Reconstruct Camping Spurs, Compaction Method 2, Tolerance Class E.

Description of Work.

The project consists of improvements to the existing Hay Canyon Campground.

Specific improvements to the Hay Canyon Campground include, but are not limited to removal and disposal of the existing campsite components; roadway excavation and embankment; construction of camping spurs; construction of camp unit items; barrier rock installation; aggregate surfacing; bulletin board installation; picnic table installation; fire ring installation; fee tube installation; sign installation; culvert installation; campsite numbering post installation; and all other incidental items necessary to complete the project in accordance with the plans and specifications. 

The contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and shall perform all work required to complete the project as shown on the plans, shown on the manufacturer’s shop drawings, and as described in the Standard Specifications (FP-14) and Forest Service Supplemental Specifications (FSSS).

Project Location

The project site is located in the Judith-Musselshell Ranger District of the Helena-Lewis and Clark National Forest - approximately 17 miles southwest of Utica in Judith Basin County, MT (Section 14, T 12N, R 11E). Refer to the location map on the title sheet of the plans.

Price Range.  $100,000 - $250,000

Update #1 ·

Description of Work.

The project consists of improvements to the existing Hay Canyon Campground.

Specific improvements to the Hay Canyon Campground include, but are not limited to removal and disposal of the existing campsite components; roadway excavation and embankment; construction of camping spurs; construction of camp unit items; barrier rock installation; aggregate surfacing; bulletin board installation; picnic table installation; fire ring installation; fee tube installation; sign installation; culvert installation; campsite numbering post installation; and all other incidental items necessary to complete the project in accordance with the plans and specifications. 

The contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and shall perform all work required to complete the project as shown on the plans, shown on the manufacturer’s shop drawings, and as described in the Standard Specifications (FP-14) and Forest Service Supplemental Specifications (FSSS).

Project Location

The project site is located in the Judith-Musselshell Ranger District of the Helena-Lewis and Clark National Forest - approximately 17 miles southwest of Utica in Judith Basin County, MT (Section 14, T 12N, R 11E). Refer to the location map on the title sheet of the plans.

Price Range.  $100,000 - $250,000

Files

File Type Posted
1240LN22Q0034Amendment002.pdf PDF
1240LN22Q0034Amend002RevisedPlansSheet11.pdf PDF
1240LN22Q0034Amendment001.pdf PDF
1240LN22Q0034Plans.pdf PDF
1240LN22Q0034ExperienceQuestionnaire.pdf PDF
1240LN22Q0034.pdf PDF
1240LN22Q0034WD.pdf PDF
1240LN22Q0034FSSS.pdf PDF

Notice history

Notice Type Posted
HELENA-LEWIS & CLARK NATIONAL FOREST - Hay Canyon Campground Improvements Award Award Notice
This notice Latest solicitation Solicitation
HELENA-LEWIS & CLARK NATIONAL FOREST - Hay Canyon Campground Improvements Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors