Heart Butte Dam Safety of Dams Modification

Closed Pre-Solicitation Posted

Solicitation number
DOIRFBO260003
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

PSC
Not on record

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Interior Bureau of Reclamation is conducting market research through this Sources Sought Notice for the Heart Butte Dam Safety of Dams Modification project near Elgin, North Dakota. The procurement encompasses comprehensive civil, geotechnical, and structural construction services to enhance the safety, stability, and performance of the dam infrastructure, including dewatering and unwatering systems, cofferdam works, and foundation void remediation through injection grouting. This is a pre-solicitation notice issued for advanced planning and market research purposes only, with no proposals requested and no contract to be awarded as a result of this announcement. Contractors should reference the Industry Day Event previously held for this project (special notice number DOIRFB0240024 on sam.gov) for additional details regarding the project scope and requirements. The notice was posted on December 18, 2025, with a due date for questions or industry input by January 4, 2026, allowing interested parties approximately two weeks to provide feedback during this market research phase.

This opportunity carries no set-aside designation and remains open to all eligible contractors. The specific award value, budget range, and final contract timeline have not been disclosed in this pre-solicitation notice, as the announcement is structured for information gathering rather than formal solicitation. The work is classified under NAICS category 237990 (Other Heavy and Civil Engineering Construction), indicating the technical nature of the required services. While no incumbent contractor is identified in this notice, interested parties should monitor sam.gov for the formal solicitation announcement and subsequent contract opportunities related to the Heart Butte Dam Safety Modification project. This Sources Sought Notice represents an initial step in the procurement process, with a formal Request for Proposals anticipated to follow after completion of the market research phase.

Notice text

Heart Butte Dam Modification
Sources Sought Notice
December 18, 2025

This announcement is being used for market research and advanced planning purposes. Proposals are not requested and will not be accepted from this Sources Sought Notice. THIS IS NOT A SOLICITATION FOR PROPOSALS AND A CONTRACT WILL NOT BE AWARDED AS A RESULT OF THIS NOTICE.

In accordance with FAR 15.201 Exchanges with Industry Before Receipt of Proposals, the United States Bureau of Reclamation (Reclamation), Missouri Basin Regional Office, previously hosted an Industry Day Event for the Heart Butte Dam Safety of Dams Modification (HBSDM) project located near Elgin, North Dakota. Please see special notice number DOIRFB0240024 on sam.gov for additional information regarding the industry day previously held in relation to this Sources Sought notice.

Heart Butte Dam Safety Modification (HBSDM) Project ¿ Scope of Work
The Heart Butte Dam Safety Modification project encompasses a comprehensive suite of civil, geotechnical, and structural construction activities designed to enhance the long-term safety, stability, and performance of the dam infrastructure. The scope of work includes, but is not limited to, the following major components:

1. Dewatering and Unwatering Systems
¿ Design, installation, operation, and maintenance of temporary dewatering and unwatering systems to facilitate dry working conditions within the outlet works and adjacent excavation zones.
¿ Systems shall be capable of managing both surface water and groundwater inflows throughout all phases of construction.
2. Cofferdam Works
¿ Engineering design, construction, and subsequent removal of temporary cofferdams to isolate work areas from reservoir and tailwater influences.
¿ Cofferdams shall meet all applicable safety and hydraulic performance criteria and be coordinated with dewatering operations.
3. Foundation Void Remediation
¿ Injection grouting to fill and stabilize voids or discontinuities within the foundation materials, accessed from within the outlet works conduit.
¿ Grouting operations shall be performed using low-mobility or chemical grout, as specified, to ensure compatibility with existing geologic conditions.
4. Outlet Works Conduit Rehabilitation
¿ Selective demolition of deteriorated concrete sections using saw cutting and hydro-demolition techniques.
¿ Installation of temporary structural shoring to support conduit integrity during repair operations.
¿ Reinforcement repair and reconstruction of the conduit to restore structural capacity and hydraulic performance.
5. Jet Grouting Operations
¿ Execution of jet grouting from both interior and exterior access points of the outlet works conduit to improve ground strength and reduce permeability.
¿ Grouting shall be performed in accordance with engineered patterns and quality control protocols to ensure uniform treatment.
6. Embankment Excavation
¿ Controlled excavation of designated portions of the existing dam embankment to facilitate installation of new filter and drainage systems.
¿ Excavation shall be staged and supported to maintain embankment stability and minimize risk to existing structures.
7. Filter and Drainage System Construction
¿ Construction of a new sand filter trench to intercept and manage seepage flows.
¿ Installation of a zoned filter and drain system, including sand filter layers, gravel drainage zones, and protective berms, designed to meet modern dam safety standards.
8. Toe Drain System Installation
¿ Placement of high-density polyethylene (HDPE) toe-drain piping systems, including associated observation wells and cleanouts, to enhance seepage monitoring and control.
¿ All components shall be installed to specified grades and alignments to ensure long-term functionality.
9. Earth Retaining Structures
¿ Furnishing and installation of pre-fabricated earth retaining wall systems to support excavation faces and permanent embankment features.
¿ Retaining walls shall be designed for site-specific loading conditions and integrated with adjacent structures.
10. Outlet Conduit Joint Sealing
¿ Application of chemical grouting techniques to seal joints within the outlet works conduit, preventing internal leakage and mitigating potential piping pathways.

This scope of work is intended to address critical dam safety concerns through a combination of structural rehabilitation, seepage control, and foundation improvement measures. All work shall be executed in accordance with applicable federal, state, and local regulations, as well as project-specific technical specifications and quality assurance requirements.

The government intends on awarding a Firm Fixed Price contract with a period of performance of approximately December 31, 2026, to June 30, 2030, or 1,277 calendar days.

The Government is seeking interest from large businesses, 8(a) and small businesses, small-disadvantaged businesses, woman-owned small businesses, HubZone small businesses and/or service-disabled veteran owned small business concerns who have the specialized knowledge, experience, and resources necessary to successfully complete a project of this size, scope, and complexity. The NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction with a business size standard of $45.0 million.

The Government will not reimburse any costs associated with responding to this Sources Sought Notice. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. The Government will not be bound by this information if a solicitation is issued.

Responses to this Sources Sought notice may include capability statements, past performance information, and any additional details that respondents believe demonstrate their company's capacity to undertake the size, scope, complexity, and magnitude of this effort. All responses should be submitted to Contracting Officer Mitchell Frost at mfrost@usbr.gov by 1700 EST on January 4, 2026.

Similar open opportunities

Opportunity Agency Set-aside Responses due
Sources Sought:Neopit Dam Remediation Construction NAICS 237990 Central Office No set-aside
White Horse Hill National Game Preserve Water Main Extension NAICS 237110 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors