Health Facitilities Solutions Company - Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Awarded Award Notice Posted
- Solicitation number
- VA10116R0042
- Agency
- Headquarters Department of Veterans Affairs
- Awarded
- to Alesia Architecture PC
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- Contract number
- VA101F-17-D-2904 Federal IDV award
- NAICS code
- 541310 Architectural Services
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
17 versions
Update #17 · Latest ·
Added: May 04, 2016 7:56 am
Modified: Dec 04, 2017 1:24 pmTrack Changes
Awarded Firm: Health Facilities Solutions, Company. The contract was awarded with burdened labor rates for the base year and four (4) one year options. The maximum capacity for the contract is $25,000,000 over the course of 5 years.
DESCRIPTION OF CONTRACT: Central Region Architect and Engineering contract to provide Architectural and Engineering services as required for an Indefinite Delivery Indefinite Quantity type contract at various location throughout the United States and its territories for the Office of Construction and Facilities Management (CFM). CFM has the need for AE services for a variety of tasks throughout the regions. These include, but are not limited to, facility assessments, design projects, peer review, and value engineering. in support of VA s major and minor construction effort.
Update #16 ·
Added: May 04, 2016 7:56 am
Modified: Dec 04, 2017 1:23 pmTrack Changes
Awarded Firm: Toland Mizell Molnar. The contract was awarded with burdened labor rates for the base year and four (4) one year options. The maximum capacity for the contract is $25,000,000 over the course of 5 years.
DESCRIPTION OF CONTRACT: Central Region Architect and Engineering contract to provide Architectural and Engineering services as required for an Indefinite Delivery Indefinite Quantity type contract at various location throughout the United States and its territories for the Office of Construction and Facilities Management (CFM). CFM has the need for AE services for a variety of tasks throughout the regions. These include, but are not limited to, facility assessments, design projects, peer review, and value engineering. in support of VA s major and minor construction effort.
Update #15 ·
Added: May 04, 2016 7:56 am
Modified: Dec 04, 2017 1:23 pmTrack Changes
Awarded Firm: Spur Design, Inc. The contract was awarded with burdened labor rates for the base year and four (4) one year options. The maximum capacity for the contract is $25,000,000 over the course of 5 years.
DESCRIPTION OF CONTRACT: Central Region Architect and Engineering contract to provide Architectural and Engineering services as required for an Indefinite Delivery Indefinite Quantity type contract at various location throughout the United States and its territories for the Office of Construction and Facilities Management (CFM). CFM has the need for AE services for a variety of tasks throughout the regions. These include, but are not limited to, facility assessments, design projects, peer review, and value engineering. in support of VA s major and minor construction effort.
Update #14 ·
Added: May 04, 2016 7:56 am
Modified: Dec 04, 2017 1:22 pmTrack Changes
Awarded Firm: Schwab-KAL JV. The contract was awarded with burdened labor rates for the base year and four (4) one year options. The maximum capacity for the contract is $25,000,000 over the course of 5 years.
DESCRIPTION OF CONTRACT: Central Region Architect and Engineering contract to provide Architectural and Engineering services as required for an Indefinite Delivery Indefinite Quantity type contract at various location throughout the United States and its territories for the Office of Construction and Facilities Management (CFM). CFM has the need for AE services for a variety of tasks throughout the regions. These include, but are not limited to, facility assessments, design projects, peer review, and value engineering. in support of VA s major and minor construction effort.
Update #13 ·
Added: May 04, 2016 7:56 am
Modified: Dec 04, 2017 1:21 pmTrack Changes
Awarded Firm: Nagel Design, Inc. The contract was awarded with burdened labor rates for the base year and four (4) one year options. The maximum capacity for the contract is $25,000,000 over the course of 5 years.
DESCRIPTION OF CONTRACT: Central Region Architect and Engineering contract to provide Architectural and Engineering services as required for an Indefinite Delivery Indefinite Quantity type contract at various location throughout the United States and its territories for the Office of Construction and Facilities Management (CFM). CFM has the need for AE services for a variety of tasks throughout the regions. These include, but are not limited to, facility assessments, design projects, peer review, and value engineering. in support of VA s major and minor construction effort.
Update #12 ·
Added: May 04, 2016 7:56 am
Modified: Dec 04, 2017 1:21 pmTrack Changes
Awarded Firm: Romanyk Consulting, Inc. The contract was awarded with burdened labor rates for the base year and four (4) one year options. The maximum capacity for the contract is $25,000,000 over the course of 5 years.
DESCRIPTION OF CONTRACT: Central Region Architect and Engineering contract to provide Architectural and Engineering services as required for an Indefinite Delivery Indefinite Quantity type contract at various location throughout the United States and its territories for the Office of Construction and Facilities Management (CFM). CFM has the need for AE services for a variety of tasks throughout the regions. These include, but are not limited to, facility assessments, design projects, peer review, and value engineering. in support of VA s major and minor construction effort.
Update #11 ·
Added: May 04, 2016 7:56 am
Modified: Dec 04, 2017 1:20 pmTrack Changes
Awarded Firm: Guidon Design, Inc. The contract was awarded with burdened labor rates for the base year and four (4) one year options. The maximum capacity for the contract is $25,000,000 over the course of 5 years.
DESCRIPTION OF CONTRACT: Central Region Architect and Engineering contract to provide Architectural and Engineering services as required for an Indefinite Delivery Indefinite Quantity type contract at various location throughout the United States and its territories for the Office of Construction and Facilities Management (CFM). CFM has the need for AE services for a variety of tasks throughout the regions. These include, but are not limited to, facility assessments, design projects, peer review, and value engineering. in support of VA s major and minor construction effort.
Update #10 ·
Added: May 04, 2016 7:56 am
Modified: Dec 04, 2017 1:19 pmTrack Changes
Awarded Firm: FourFront Design, Inc. The contract was awarded with burdened labor rates for the base year and four (4) one year options. The maximum capacity for the contract is $25,000,000 over the course of 5 years.
DESCRIPTION OF CONTRACT: Central Region Architect and Engineering contract to provide Architectural and Engineering services as required for an Indefinite Delivery Indefinite Quantity type contract at various location throughout the United States and its territories for the Office of Construction and Facilities Management (CFM). CFM has the need for AE services for a variety of tasks throughout the regions. These include, but are not limited to, facility assessments, design projects, peer review, and value engineering. in support of VA s major and minor construction effort.
Update #9 ·
Added: May 04, 2016 7:56 am
Modified: Dec 04, 2017 1:18 pmTrack Changes
Awarded Firm: FFE Environmental Services, Inc. The contract was awarded with burdened labor rates for the base year and four (4) one year options. The maximum capacity for the contract is $25,000,000 over the course of 5 years.
DESCRIPTION OF CONTRACT: Central Region Architect and Engineering contract to provide Architectural and Engineering services as required for an Indefinite Delivery Indefinite Quantity type contract at various location throughout the United States and its territories for the Office of Construction and Facilities Management (CFM). CFM has the need for AE services for a variety of tasks throughout the regions. These include, but are not limited to, facility assessments, design projects, peer review, and value engineering. in support of VA s major and minor construction effort.
Update #8 ·
Added: May 04, 2016 7:56 am
Modified: Dec 04, 2017 1:16 pmTrack Changes
Awarded Firm: Commander s Concepts Commissioning, LLC The contract was awarded with burdened labor rates for the base year and four (4) one year options. The maximum capacity for the contract is $25,000,000 over the course of 5 years.
DESCRIPTION OF CONTRACT: Central Region Architect and Engineering contract to provide Architectural and Engineering services as required for an Indefinite Delivery Indefinite Quantity type contract at various location throughout the United States and its territories for the Office of Construction and Facilities Management (CFM). CFM has the need for AE services for a variety of tasks throughout the regions. These include, but are not limited to, facility assessments, design projects, peer review, and value engineering. in support of VA s major and minor construction effort.
Update #7 ·
Added: May 04, 2016 7:56 am
Modified: Dec 04, 2017 1:14 pmTrack Changes
Awarded Firm: Calvin L. Hinz Architects. The contract was awarded with burdened labor rates for the base year and four (4) one year options. The maximum capacity for the contract is $25,000,000 over the course of 5 years.
DESCRIPTION OF CONTRACT: Central Region Architect and Engineering contract to provide Architectural and Engineering services as required for an Indefinite Delivery Indefinite Quantity type contract at various location throughout the United States and its territories for the Office of Construction and Facilities Management (CFM). CFM has the need for AE services for a variety of tasks throughout the regions. These include, but are not limited to, facility assessments, design projects, peer review, and value engineering. in support of VA s major and minor construction effort.
Update #6 ·
Added: May 04, 2016 7:56 am
Modified: Dec 04, 2017 1:14 pmTrack Changes
Awarded Firm: Apogee-CEMS JV. The contract was awarded with burdened labor rates for the base year and four (4) one year options. The maximum capacity for the contract is $25,000,000 over the course of 5 years.
DESCRIPTION OF CONTRACT: Central Region Architect and Engineering contract to provide Architectural and Engineering services as required for an Indefinite Delivery Indefinite Quantity type contract at various location throughout the United States and its territories for the Office of Construction and Facilities Management (CFM). CFM has the need for AE services for a variety of tasks throughout the regions. These include, but are not limited to, facility assessments, design projects, peer review, and value engineering. in support of VA s major and minor construction effort.
Update #5 ·
Added: May 04, 2016 7:56 am
Modified: Jun 06, 2016 3:14 pmTrack Changes
Amendment to VA101F-16-R-0042
The purpose of this amendment is to provide RFI responses 66 - 71 and incorporate the RFI responses into the procurement. In addition, the following item is changed:
1) SF 330 submission date has been EXTENDED to June 15, 2016 at 2 PM Central Time.
Update #4 ·
Added: May 04, 2016 7:56 am
Modified: May 26, 2016 9:58 amTrack Changes
Amendment to VA101F-16-R-0042
The purpose of this amendment is to provide RFI responses 44 - 65 and incorporate the RFI responses into the procurement. In addition, the following items are changed:
1) SF 330 submission date has been EXTENDED to June 8, 2016 at 2 PM Central Time.
2) Change Note 1 as reads: "Note 1: If the combining of two or more companies (joint venture (JV)) for the purpose of this requirement, then include each company's role under Part I, Item H of the SF 330. If the JV partners have never worked together on similar jobs, so indicate. The JV will be evaluated as one. The experience of each JV partner will be evaluated based on each partner's role in cited past projects and in the proposed JV role for this project. To identify the JV, provide the DUNS number for each entity and the JV entity. As this is a 100% SDVOSB Set-Aside, a Joint Venture proposing will need to have the Center for Veteran Enterprises SDVOSB JV Certification and the certification must be in place at the time of SF330 submission. For questions regarding the certification, please contact the Center for Veteran Enterprise (CVE):
Help Desk: (866) 584-2344
Monday-Friday 8:00am to 8:00pm (Eastern)
Status Updates: verificationfollowup@va.gov
Profile Questions: vip@va.gov
To read: "Note 1: If the combining of two or more companies (joint venture (JV)) for the purpose of this requirement, then include each company's role under Part I, Item H of the SF 330. If the JV partners have never worked together on similar jobs, so indicate. The JV will be evaluated as one. The experience of each JV partner will be evaluated based on each partner's role in cited past projects and in the proposed JV role for this project. To identify the JV, provide the DUNS number for each entity and the JV entity. Submit a copy of the JV Agreement. As this is a 100% SDVOSB Set-Aside, a SDVOSB Joint Venture proposing must provide evidence of Center for Veteran Enterprises application submission with the SF330 package and must be Center for Veteran Enterprises SDVOSB JV Certified prior to the conclusion of the interview process . For questions regarding the certification, please contact the Center for Veteran Enterprise (CVE):"
Help Desk: (866) 584-2344
Monday-Friday 8:00am to 8:00pm (Eastern)
Status Updates: verificationfollowup@va.gov
Profile Questions: vip@va.gov
Update #3 ·
Added: May 04, 2016 7:56 am
Modified: May 19, 2016 6:27 amTrack Changes
Amendment to VA101F-16-R-0042
The purpose of this amendment is to provide RFI responses 34 -43 and incorporate the RFI responses into the procurement.
VA101-16-R-0042 RFI RESPONSES 34 - 43
RFI NUMBER RFI RESPONSE
34 With regard to the Project Information / Statement of Work (paragraph #2), it begins with a list of items that CFM provides to support its customers (e.g., Design programs; Schematic Design; ⦠Commercial office building design, commercial interior space planning, ⦠etc), then it lists the types of projects to expect (bulleted items beginning with facilities demolition, repairs, etc.), and then states that the contracts may be for "all types of new and existing facilities including ⦠community-based outpatient clinics, administrative/office buildings ⦠etc). My guess is that the projects we select as examples for the Task Groups should be related to this first list of project items. For example, if we give an example in Task Group 1 of Energy Analysis, we will do well to make sure the project to represent that aspect of Task Group 1 is a clinic, a medical research facilities, or the like. Is that correct? The first paragraph of Section 2. Project Information/Statement of work states: "CFM supports its customers with services and products including (but not exclusively)â¦" Submit examples of similar work for each of the Task Groups 1 - 4 that your firm may have.
The paragraph below the bulleted items states, "Additionally, there may be contracts for all types of new and existing facilities, including but not limited toâ¦" The paragraph provides a list of potential facilities. Firms should submit examples for each of the Task Groups 1 - 4 that your firm has completed.
35 With regard to the Selection Criteria (paragraph #3), my reading of paragraph 3.b. appears to request that the examples we provide under each Task Group also needs to include the team members who worked with us on that project; however, the only team members we mention should be the ones on this particular team for submission. In other words, if we worked with Company WWW on a project, but that company is not on the team for this submission, we won't mention them. Is that correct? As Paragraph 3. Selection Criteria, states: "Information for each factor should be submitted for the office and/or employee performing the work in response to this announcement."
36 Should we be asking for Task Group projects from team members we haven't necessarily worked with in the past? As an example, one of our team member has offices in a number of locations, including Chicago and St. Louis and Des Moines. We've worked with people from the Des Moines office, but we've not worked with people from the Chicago or St. Louis offices. Should every team member be supplying project examples under the Task Groups, or are you looking for projects only from the Prime with a mention of which current team firms were also on that project? As Paragraph 3. Selection Criteria, states: "Information for each factor should be submitted for the office and/or employee performing the work in response to this announcement."
37 With regard to Past Performance (paragraph #3. II.) and the tabular listing of excellent performance ratings and letters of recommendation,
Would these be aggregate Excellent performance ratings (as on Past Performance Questionnaires), or is it that rating within a group of evaluation criteria (as on a CPARs) report?
We recently learned that on many CPARs evaluations from VA projects reviewers opted to select "Satisfactory" because any higher rating would require writing a justification. Will CPARs evaluations be weighed differently than, for example, a PPQ or a letter of recommendation?
Excellent Past Performance ratings may be from Past Performance Questionnaires or CPARS. CPARS has the following ratings: Exceptional, Very Good, Satisfactory, Marginal, and Satisfactory.
CPARS evaluations will not be weighed differently.
38 We are planning to submit as the prime for the A/E IDIQ for CFM Central Region. We have also been asked to join other teams as a subconsultant. Is this acceptable or is there any reason we should not be on another firms' team when it comes time to making an award? It is firm's business decision on team composition when proposing for this procurement.
39 This solicitation specifically calls for an "environmental science" degree, however that specific degree title was not used/available until more recently. Instead, the more senior staff that we would normally use for a solicitation like this have degrees in 'geology' or a related field. Do you think that discrepancy will be okay? We've started seeing this more often in environmental engineering role requirements. Environmental engineering or an engineering degree with emphasis on environmental studies.
Appendix 1, #11 Environmental Engineer(s) is changed to read, "11. Environmental Engineer(s) - Shall be an environmental engineer with experience in industrial facilities and hazardous waste. Shall have a Bachelor's Degree in environmental engineering, or an engineering degree with emphasis on environmental studies. Shall have a working knowledge of OSHA, RCRA and CERCLA and the National Emission Standards for Hazardous Air pollutants, National Environmental Policy Act regulations (NEPA), Federal Water Pollution Control Act, and National Pollutant Discharge Elimination System (NPDES), pollution standards for, soil, waste, lead and asbestos sampling."
40 The current STANDARD FORM 330 (REV. 3/2013) that I downloaded from the GSA's website today (see attached) has a ½" top margin, 3/8" side margins, a ¾" bottom margin. Do you want us to redesign the form to meet the 1" margins? Or can we use the existing margins from the existing form? Please use the existing margins on the SF330.
41 May we add color to personalize the forms?
This is permissible.
42 In your recent Modification to a Previous Notice for the subject solicitation, you request the margins for the SF 330 be set to 1 inch. Are you requiring all submitters to modify the published SF 330 PDF form (attached) from a ½" margin to a 1" margin?
Would you consider waiving the 1" requirement for this submittal? Please use the existing margins on the SF330.
43 My A/E team is considering submitting our SF330 package for the A/E IDIQ for the CFM Central Region. Currently all of our A/E team members are not licensed in all of the 21 states listed in the solicitation. Getting this accomplished will take some time, effort, and expense. We have been doing work for the VA in Indiana and Michigan for the past 4 years, and I know that we have to be licensed in each state in order to do the work on each Task Order. Is this the same for the CFM Central Region IDIQ? If so, can we submit our SF330 and work on getting reciprocity for each state as needed - if awarded a contract? Team members will need to be licensed in each state by contract award.
Update #2 ·
Added: May 04, 2016 7:56 am
Modified: May 16, 2016 2:41 pmTrack Changes
Amendment to VA101F-16-R-0042
The purpose of this amendment is to provide RFI responses 1 - 33 and incorporate the RFI responses into the procurement. In addition, the following items are changed:
1) To Section 3: Selection Criteria, Paragraph I, Key Personnel, subparagraph (b) Specialized and Technical Experience, add the following sentence: "Indicate how each project is relevant to Section 2: Project Information/Statement of Work tasks."
2) Firms shall submit using the latest SF330 version: SF330 (Rev 3/2013).
3) Change Section 3, Paragraph I. Key Personnel, as reads: "Key personnel are required to be licensed, registered, and/or certified in the discipline for which they are filling. Resumes for qualified personnel should be presented in Section E of the SF 330 for the following key personnel: architect, structural engineer, civil engineer, mechanical engineer, electrical engineer, fire protection engineer (registered with evidence of successful completion of Fire Protection Examination), geotechnical engineer, land surveyor, historical preservation engineer, and environmental engineer. Resumes shall be provided for other key personnel as follows: project manager, interior designer, cost estimator/engineer, value engineer, scheduler, risk analyst, landscape architect, medical equipment planner, and space planner. Appendix I, Primary Key Personnel and Consultant Qualifications, provides the qualifications required for the key personnel. Registration or certification for all is encouraged. All key personnel shall be shown on the organizational chart."
To read: "Key personnel are required to be licensed, registered, and/or certified in the discipline for which they are filling. Resumes for qualified personnel should be presented in Section E of the SF 330 for the following key personnel: architect, structural engineer, civil engineer, mechanical engineer, electrical engineer, fire protection engineer, geotechnical engineer, land surveyor, historic preservationist, environmental engineer, Senior project manager, interior designer, cost estimator/engineer, transport engineer, construction inspection/specification manager, medical equipment planner, and space planner. Resumes shall be provided for other personnel as follows: value engineer, scheduler, risk analyst, and landscape architect. Appendix I (Revised), Primary Key Personnel and Consultant Qualifications, provides the qualifications required for the key personnel. Registration or certification for all is encouraged. All key personnel shall be shown on the organizational chart."
4) Change Section 3, III. Firm's Professional Qualifications. Paragraph (c) Volume as reads: "Volume of work previously awarded to the firm by the Department of Veterans Affairs. Interested firms must list in block 11 of the SF 330 the amount and dates of all VA fees for A/E Services awarded and negotiated with awards pending between 2006 and the present."
To read: "Volume of federal and non-federal work previously awarded to the firm in the last three years. Firms shall follow the SF330 Part II Block 11 instructions for the Annual Average Professional Services Revenue of Firm for the Last 3 Years."
5) Change the last sentence in Selection Criteria 3, Paragraph II) Past Performance as reads: "Interested firms must list on the SF 330, Part II, block 10, the type, amount and dates of all fees for relevant A/E Services awarded and negotiated with awards between 2006 and the present"
To read: "Interested firms must list on the SF 330, Part II, Block 10, the type, amount and dates of all fees for all A/E Services awarded and negotiated with awards for the last five years."
6) Change Page 13 of 18, 4. SUBMISSION REQUIREMENTS as reads: "Interested sources are invited to respond to this announcement by providing two (2) CD's, one (1) original hard copy and five (5) hard copies of the submittal package including an original SF 330, Parts 1 and 2, for the prime and an SF 330 for each subcontracted consultant proposed."
To read: "Interested firms having the capability to perform this work must submit one (1) original and five (5) copies of a current completed SF 330 Part I for the prime firm and one (1) original and five (5) copies of SF 330 Part II for the prime firm and all consultants. Include the firm's DUNS number in SF 330, Part II, Block 4. Offerors shall also submit two (2) copies of the submitted package on a CD or DVD in a searchable PDF format."
7) Add to Section 4. SUBMISSION REQUIREMENTS: There is not a page limit for the submission. Please ensure that SF330 submissions include all information requested and are presented in a clear, concise organized manner. Font size shall be 10 point Times Roman Font or greater. Page size shall be 8 ½" x 11" with the exception of the sections identified in RFI responses 22 & 23. Margins should be 1".
8) Change Note 1 as reads: "Note 1: If the combining of two or more companies (joint venture (JV)) for the purpose of this requirement, then include each company's role under Part I, Item H of the SF 330. If the JV partners have never worked together on similar jobs, so indicate. The JV will be evaluated as one. The experience of each JV partner will be evaluated based on each partner's role in cited past projects and in the proposed JV role for this project. To identify the JV, provide the DUNS number for each entity and the JV entity. A signed letter of intent to form a JV shall accompany the SF330 submission. If the JV firm is rated as one of the most highly qualified, a signed JV agreement must be provided prior to negotiation. Failure to submit a signed copy of the JV agreement will result in the JV's submission being excluded from consideration for award."
To read: "Note 1: If the combining of two or more companies (joint venture (JV)) for the purpose of this requirement, then include each company's role under Part I, Item H of the SF 330. If the JV partners have never worked together on similar jobs, so indicate. The JV will be evaluated as one. The experience of each JV partner will be evaluated based on each partner's role in cited past projects and in the proposed JV role for this project. To identify the JV, provide the DUNS number for each entity and the JV entity. As this is a 100% SDVOSB Set-Aside, a Joint Venture proposing will need to have the Center for Veteran Enterprises SDVOSB JV Certification and the certification must be in place at the time of SF330 submission. For questions regarding the certification, please contact the Center for Veteran Enterprise (CVE):
Help Desk: (866) 584-2344
Monday-Friday 8:00am to 8:00pm (Eastern)
Status Updates: verificationfollowup@va.gov
Profile Questions: vip@va.gov
Update #1 ·
Added: May 04, 2016 7:56 am
ALL INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT A STANDARD FORM 330, ARCHITECT ENGINEER QUALIFICATIONS, IS CONTAINED HEREIN. THERE IS NO SEPARATE RFP PACKAGE TO DOWNLOAD. SF330 Package is due by June 3, 2016 at 2:00 PM Central Time.
1. CONTRACT INFORMATION: This contract is being procured in accordance with the Brooks A-E Act (Public Law 92-582) as implemented in FAR Subpart 36.6. Firms will be selected for negotiations based on demonstrated competence and qualifications for the required work.
The Department of Veterans Affairs (VA), Office of Construction & Facilities Management (CFM), Central Region proposes to obtain the services for facilities support, design, project management , maintenance of design and construction standards, historic preservation services, and design and facilities expertise to the Department of Veterans Affairs to deliver high quality, cost effective facilities in support of our Nation's Veterans.
CFM key customers are, but are not limited to the VA Districts, the VA Central Office (VACO), the Veterans Health Administration (VHA), National Cemetery Administration (NCA), Veterans Benefits Administration (VBA) and subordinate Veteran Integrated Services Networks (VISN), VA Medical Centers (VAMC), National Acquisition Centers (NAC), CFM Regional Offices and VBA field offices, across the country who proudly work at the front lines of service delivery. Firms should be advised that CFM's key customers may be given ordering authority to use the CFM Central Region AE IDIQ contracts. The majority of the requirements satisfied by issuance of task orders against this contract will originate within the boundaries of the Central Region of the United States (See the attached CFM Region Map). Central Region States include MI, OH, IN, WI, IL, MN, IA, MO, ND, SD, NE, KS, MT, WY, CO, UT, OK, AR, MS, LA, and TX.
The VA anticipates awarding at least three (3) AE IDIQ Contracts100% Set Aside for Service Disabled Veteran Owned Small Business (SDVOSB) for the Central Region. The IDIQ contracts will be awarded for five (5) years (base one year period and four (4), one year options, if exercised). The amount of contract capacity for the 5 year period shall be $25,000,000. If the capacity is exhausted before the five (5) year time frame, the contract will be considered complete. The minimum guarantee amount shall be $2,000.00. The contract is anticipated to be awarded in 2016 and completed in 2021.
Using the fair opportunity procedures listed at FAR 16.505(b), Task Orders will be competed among the AE IDIQ Firms. A Request for Qualifications containing the selection criteria listed at FAR Part 36.602-1 and VAAR 836.602-1 will be sent to the selected firms. The Government will evaluate the qualifications and the most highly qualified firm will receive a request for fee. The Task Orders will then be negotiated as firm-fixed price using the contract audited rates. In accordance with FAR 52.216-19 -- Order Limitations the minimum order shall not be below $2,000 and the maximum single order shall not be greater than $2,000,000. If remaining capacity falls below $2,000.00, the Government will consider the contract complete.
North American Industrial Classification System (NAICs) codes are Architect or Architect/Engineer Firms with an approved NAICS Code of 541310 which has a size standard of $7,500,000 in average annual. This announcement is being competed as 100% Set-Aside for Service Disabled Veteran Owned Small Businesses.
To be eligible for contract award, a firm must be registered in the System for Award Management (SAM) database. Representations and Certifications must be completed electronically via this site as well. Register via the SAM Internet site at www.sam.gov or by contacting the SAM Customer Service at 1-866-606-8220. The SDVOSB must be listed in the Vendor Information Pages database (http://www.VetBiz.gov) as a certified SDVOSB. Additionally firms must supply type(s) and amount of insurance along with insurance carrier(s).
Quality Control Plans will be required at the time of award. The wages and benefits of service employees (see FAR 22.10) performing under the resulting contract must be at least equal to those determined by the Department of Labor under the Service Contract Labor Standards, as determined relative to the employee's office location (not the location of the work). Also, in accordance with Executive Order 13658 the current minimum wage for certain Federal contractors are $10.15 per hour.
The Task Order Ombudsman for these contracts is the following:
Department of Veterans Affairs
ADAS for Procurement Policy, Systems, and Oversight
Risk Management and Compliance Service
810 Vermont Ave, NW
Washington, DC
VARiskManagement @va.gov
2. PROJECT INFORMATION/STATEMENT OF WORK: CFM supports its customers with services and products including (but not exclusively): Design programs; Schematic Design ; Pre-construction documents studies; Design Development; Construction Documents; Cost Estimates; Value Engineering; Construction Period Services; Schematic Design, Design Development, and Construction Documents Peer Review; Specialty Consultant; Constructability Review; QA/QC; Construction Submittal Review; RFP for Design-Build; Facility Condition Assessments; Electrical Studies; and Design Services for Minor and Non-Recurring Maintenance Projects, Commercial office building design, commercial interior space planning, furniture design and layouts, and signage and wayfinding.
The multiple award contracts are for licensed architectural, multi-disciplined engineering and design (A/E) services for the following types of projects:
" facilities demolition
" repairs
" alterations
" new construction
" utility/infrastructure upgrades
" leases
Additionally, there may be contracts for all types of new and existing facilities including, but not limited to medical centers, hospitals, clinics, community based outpatient clinics, administrative/office buildings, training and education buildings, medical research facilities, community living centers, domiciliaries, parking garages, central plants, support buildings, and campus infrastructure and utilities.
Standards: Work will be prepared in compliance with VA/CFM standards, guidelines and criteria, such as PG 18-15 and Space and Equipment Planning System (SEPS), which can be found on the VA/CFM Technical Information Library (http://www.cfm.va.gov/til/index.asp) and the statement of work associated with each task order issued. Successful firms must be able to demonstrate experience and success in working with these standards, or similar system wide standards from other Federal, State, private healthcare systems or corporations.
Tasks for the Contract: The various tasks associated with the AE IDIQ contracts that will be awarded are identified in the following paragraphs (Task Group1 - Task Group 4).
Task Group 1 - Assessments
Pre-Construction Documents - Technical Studies:
Example of the tasks includes but not limited to: Preparation of studies involving systems evaluation. Reports on the inspections of VA facilities assessing site development, utilities investigations, Federal, State, and Local permit requirements and recommendations. Analyses of existing and selected systems also, including determining available capacity involving structural, electrical, and HVAC systems. Evaluation of equipment proposed for VA facilities. Development of cost comparison studies on building systems, renovation alternatives versus building additions versus new buildings. Develop time analyses studies of different phasing alternatives.
Facility Condition Assessments (FCA):
Example of the tasks includes but not limited to: Provide consulting, assessment, and inspection services utilizing experts skilled in appropriate technical areas necessary for the evaluation of existing VA facilities. (Reports will indicate all systems, conditions, life expectancies, etc.)
Utility Studies:
Description of work to be performed: See link for description of services to perform: http://www.cfm.va.gov/til/aeDesSubReq.asp A/E design Submission Requirements, Site, Topo, Utility, Landscape, and Soil Surveys Scope of Services.
ASSESSMENT CONSULTING SERVICES
Example of the tasks include but not limited to: Provide assessment consulting services and technical studies on a wide variety of facility design and construction issues including seismic studies indoor air quality, national codes and standards review, cost estimating, facility operations, control of indoor air quality, impact of facility standards on building performance and facility life cycle, interoperability electronic standards for facility design, construction, operation, project documentation and construction management. Services may require on-site inspections.
Energy Analysis:
Example of the tasks include but not limited to: Perform analysis and provide studies of energy usage including electric, gas, steam solar or other systems utilized or proposed to be utilized in the assigned facilities and medical center complexes.
Façade Studies: Example of the tasks includes but not limited to: - Perform both no-destructive and destructive evaluations of existing and proposed building facades. Special emphasis should be placed on methods used, determining longevity, thermal properties and description of aesthetic themes and intent.
Seismic Studies:
Description of work to be performed: Perform seismic research on the locations identified to indicate current seismic zones; analyze existing building structure for compliance with current seismic criteria. Determine needed improvements to meet current requirements and estimate cost of compliance. See guidance on the VA TIL website: http://www.cfm.va.gov/til/seismic.asp
Infrastructure Assessment:
Description of work to be performed: Perform analysis of existing or proposed infrastructure on medical center complexes to including defining and documenting: utility capacities, physical security elements in place, fencing, pedestrian and vehicular roads, sidewalks and amenities, all associated elements of the built environment composing the medical center campus. The intent of the studies is to identify supporting facilities and conditions to accommodate proposed future expansions, renovations, and new construction. See the TIL for guidance regarding Physical Security studies: http://www.cfm.va.gov/til/dManual.asp
Site survey, soil/geotechnical investigation: See link for description and instructions of services to be performed: http://www.cfm.va.gov/til/aeDesSubReq.asp also follow ASCE industry standards.
Risk Analysis Services: Quantify the largest risks to a project or mitigate those risks (for example, GAO conducted a schedule risk analysis for a medical center and found that there is a 50 percent chance that the project won't be finished until more than 6 months after its estimated completion date). VA will require an integrated master schedule that includes VA and contractor efforts for all project phases.
Task Group 2 - Professional Reviews
Peer review - Schematic through CDs:
DESIGN REVIEWS THROUGH DESIGN DEVELOPMENT STAGE
Example of the desired tasks include: The evaluation, review and recommendation on all architectural and engineering disciplines' designs, calculations, specifications, reports, system analyses, conformance with sustainable design criteria and thorough completeness and coordination based upon development of the final approved Schematic Plan. Evaluations will be based upon the submission requirements established in PG-18-15. Site visits to VA facilities for participation in reviews and meetings with CFM personnel in Washington, DC
CONSTRUCTION DOCUMENT REVIEW
Example of the tasks include but not limited to: The evaluation, review and recommendations on the complete drawings and specifications, soil borings, VA testing lab recommendations, and other documents necessary for the bidding and construction of this project. These documents will be provided by the project A/E from the approved design development documents. The AE IDIQ shall evaluate and ensure the coordination of the drawings between disciplines; conformance with sustainable design criteria; identification of errors, omissions or conflicts found within or between drawings and specifications. The AE IDIQ shall evaluate the schedule to meet the operating plan due dates for the Request for Proposal or Invitation for Bids and award dates. Review and comment on project phasing. Evaluate market conditions that may affect bidding. Review any resubmitted construction documents with recommendations as to their acceptability in accordance with PG-18-15.
Constructability Review
Example of the tasks includes but not limited to: The Contractor will provide a detailed analysis of the construction documents to assure clarity, accuracy, coordination and completeness of the documents. The review will focus on the suitability of the drawings and specifications for ease of construction and the placement and maintenance of equipment. Review will identify conflicts and/or claims that may arise during construction.
Value Engineering Review: The Contractor will be tasked to establish a VE Task Team, be a participant within this team or make recommendations based upon an analysis of a VE report. If tasked to establish a VE Task Team, the Contractor will provide at least one architect, structural engineer, mechanical engineer and electrical engineer with additional support as necessary. A submission comprised of the individuals' name, background and experiences and other relevant information is required for approval by the Contracting Officer. Experience requirements are as follows.
(A) Engage a qualified VE Consultant to provide the full service. The consultant shall have a recognized background in the field of VE; or
(B) Engage a qualified VE Consultant to work with the guide staff members; or
(C) Use a staff member who has had a adequate formal VE training (e.g. attendance at a 40 hour VE Workshop based upon the conventional formalized method of the Society of American Value Engineers)
Construction Submittal Review not anticipated through the design A/E Contract: The Contractor shall provide submittal review services covering products that may not have been listed within the contract documents but not limited to cut sheets, manufacturers data/performance sheets, samples, shop drawings which are beyond the services provided by the VA selected A/E. Review periods will be established by the Contracting Office. Compatibility analyses of different materials and recommendations associated with acceptance or rejection of alternate materials and products. Review duration will meet requirements established by Contracting Officer.
Specialty Consultants not available through the design A/E: The Contractor will be tasked to provide additional design services, construction and inspection services, expert witnesses or claims consultants skilled in design analysis, CPM, phasing development, construction techniques and other associated specialties. The Contractor will be required to present the technical, professional and experience background for evaluation and approval of the Contracting Officer to support construction activities or preparation of reports involving design or investigation and evaluation of issues associated with design and construction.
Task Group 3 - Technical expertise/Studies
Cost Estimates - Description of work to be performed is found on the VA TIL website Manual for preparation of cost Estimates. http://www.cfm.va.gov/cost/index.asp
On site Construction Support; QA/QC: Construction Change Support; Submittal Review -
Example of the tasks include but not limited to: Provide on-site quality assurance and control through witnessing performance tests of various types of structural, electrical, HVAC equipment, elevators, sprinkler systems, fire alarm, communication systems and other systems integral to a fully operational building system. Prepare reports associated with on-site inspections or analyses of test reports, review of submittal material and evaluation of contract modifications, cost estimates, daily logs, and preparation of requests for information (RFI), monitoring of submittals and other duties assigned by the Senior Resident Engineer (SRE). Prepare reports associated with on-site investigations of materials, equipment and systems components. Test performance and operation in compliance with contract requirements.
Medical Equipment Planning and Design: Description of work to be performed is found on the VA TIL website. See PG-18-9 and other Design Guides for information.
http://www.cfm.va.gov/til/planning.asp, http://www.cfm.va.gov/til/space.asp
As-built preparation/updates: Description of work to be performed is similar to industry standard as-built preparation services. In some cases updating as-builts will be required whereby measuring existing facilities and reviewing completed contact documents are required to update the as-builts. Work will be performed in accordance with VA CAD Standards, information can be found on the VA TIL.
Preparation of BIM documentation: Description of work to be performed is found on the VA TIL at http://www.cfm.va.gov/til/projReq.asp
Laser Measurement: Description of work to be performed: Provide laser measurement of existing facilities. Provide CAD and electronic submittals of results that may be used to created BIM files of existing facilities and or updates to as-built documents.
Update Corporate Facility Standards and Guidelines
Description of work to be performed: Investigate industry standards, current CFM requirements, trends and functional needs, as necessary to prepare new DVA Design and Construction specifications, standards and guides. Provide detailed, updates and revision of the existing CFM Master Specification, Design Guides, Space and Equipment Planning System (SEPS) criteria and any other design and/or construction standard as maintained by CFM.
Physical Security: Description of work to be performed: In accordance with the latest version of the VA Physical Security Design Manual found on the VA TIL website.
Traffic Studies: Description of work to be performed: Provide analysis of vehicular and pedestrian circulation in designated areas of medical center campuses and surrounding areas. The traffic studies shall be produced in compliance with industry standards and accepted by local government authorities.
Structural Studies: Description of work to be performed: In accordance with the latest version of the VA Design Requirement H-18-8 on the VA TIL website.
http://www.cfm.va.gov/til/seismic.asp
Operations and Maintenance Systems and Information support (MAXIMO is VA standard platform): Prepare, compile and provide comprehensive OMSI support information in compliance with the construction contract requirements. Provide in MAXIMO when directed.
Health Care Design Research: Conduct research and submit reports on current trends, concepts and best practices in various areas of the health care industry concerning design and construction. Research may also involve studies of staff circulation patterns and best practices in patient care.
Mock ups: Design and construct mockups of various areas typical in medical centers. Areas may include patient rooms, treatment areas, BIM simulations, etc.
Destructive Testing: Conduct forensic testing and provide written reports and recommendations to resolve and correct deficiencies in existing conditions in built facilities. Testing and investigations may require removal some building materials to unveil areas that require examination.
Task Group 4 - DESIGN
Space programming, evaluation and planning: Develop project space programs in the VA/DoD Space and Equipment Planning System (SEPS), using available workload and space data and information (demonstrated ability to use SEPS, or similar system, required). The current SEPS system produces BIM outputs which could be used as rudimentary schematic design. Space programs may require modification to account existing facility conditions or templated departments. Perform health care operation simulation and/or modelling to assist in cost/benefit decision processes. See guidance on the TIL: http://www.cfm.va.gov/til/planning.asp
Schematic, Concept, Design Development : Perform and prepare designs utilizing planning documentation, evaluations, review and recommendation of all architectural and engineering discipline calculations, specifications, reports, system analyses, drawings, cost estimates meeting the approved space program, compliance with established sustainable design criteria, Facility Development Plan (FDP) and Design Program in accordance with the minimum requirements for A/E Submissions, Program Guide PG-18-15. Perform services to identify and make recommendations for correction of submissions to meet the requirements described in PG-18-15. Site visits to VA facilities and meetings with Office of Facilities Management (CFM) personnel in Washington, DC. Produce the various levels of design required for major medical facilities in accordance with the TIL PG-18-15. http://www.cfm.va.gov/til/aeDesSubReq.asp
Construction Documents for projects: Produce construction documents consisting of drawings, specifications, and supporting calculations setting forth in detail the requirements for the construction of facilities in accordance with the TIL PG-18-15 and other guidance found on the TIL. http://www.cfm.va.gov/til/aeDesSubReq.asp
All design services fr Minor and Non-recurring Maintenance (NRM) Projects: Design programs, schematic design, design development, construction documents and construction period services as required by the Medical Center(s) designated by the Region Director and approval of the Contracting Officer.
RFP Preparation: Meet with VA officials, review and analyze any prepared documentation for proposed new VA facilities. Conduct necessary background preparation then produce Design Build Request for Proposals for major medical facilities or other facilities as determined to be acquired and owned by the VA.
Design Build and Lease: Meet with VA officials, review and analyze any prepared documentation for proposed new VA leased facilities. Conduct necessary background preparation then produce Design Build Request for Proposals for leased facilities or other facilities as determined to be acquired by the VA.
Interior Design: Description of work to be performed is found on the VA TIL website.
http://www.cfm.va.gov/til/dManual.asp
Wayfinding: Description of work to be performed is found on the VA TIL website.
http://www.cfm.va.gov/til/dManual.asp
Graphic Design: Description of work to be performed is found on the VA TIL website.
http://www.cfm.va.gov/til/dManual.asp
3. SELECTION CRITERIA: Firms will be selected for award based on the Brooks Act and FAR 36.6. Proposals will be evaluated on each of the criteria factors listed below. Each factor will be assigned a rating from outstanding to unacceptable based on the risk to the Government that the offeror will successfully perform the factor being evaluated. Award will be made to the firms determined to be most highly qualified. Information for each factor should be submitted for the office and/or employee performing the work in response to this announcement. The technical evaluation factors are of equal importance and the sub-factors are of equal importance within the factor.
Technical Capabilities
Primary Key Personnel and Consultant Qualifications
I. Key Personnel: Key personnel are required to be licensed, registered, and/or certified in the discipline for which they are filling. Resumes for qualified personnel should be presented in Section E of the SF 330 for the following key personnel: architect, structural engineer, civil engineer, mechanical engineer, electrical engineer, fire protection engineer (registered with evidence of successful completion of Fire Protection Examination), geotechnical engineer, land surveyor, historical preservation engineer, and environmental engineer. Resumes shall be provided for other key personnel as follows: project manager, interior designer, cost estimator/engineer, value engineer, scheduler, risk analyst, landscape architect, medical equipment planner, and space planner. Appendix I, Primary Key Personnel and Consultant Qualifications, provides the qualifications required for the key personnel. Registration or certification for all is encouraged. All key personnel shall be shown on the organizational chart.
The evaluation will take into account performance of key personnel. The offeror must provide the information requested at paragraphs (a), (b), and (c) of this section for technical qualifications evaluation or affirmatively state that it possesses no relevant, directly related, or similar qualifications. The offeror agrees to assign to the contract those persons whose resumes, personnel data forms or personnel qualification statements were submitted as part of the proposal. No substitution or addition of personnel shall be made unless the following procedure is used:
If personnel for whatever reason become unavailable for work under the contract for a continuous period exceeding thirty (30) days or are expected to devote substantially less effort to the work than indicated in the proposal, the Contractor shall propose a substitution of such personnel. All proposed substitutions shall be submitted, in writing, to the Contracting Officer at least fifteen (15) days prior to the proposed substitution. Each request shall provide a detailed explanation of the circumstances necessitating the proposed substitution, a complete resume for the proposed substitute and any other information required by the Contracting Officer to approve or disapprove the proposed substitution. All proposed substitutes shall have qualifications that are equal to or higher than the qualifications of the person being replaced.
(a) Key Personnel Professional Qualifications: Submit a matrix of proposed design team(s), including alternatives, that contain the following data about the members assignment: member's name, firm name, office location, proposed team assignment, percent of time to be spent on this team, education level/discipline (example: Bachelor of Science, mechanical engineering), state(s) of professional registration, number of years of professional experience, and number of years with the firm. Also, for project managers and team leaders, identify the number of teams (design, consultants and joint venture partners) they have managed over the past five years.
(b) Specialized and Technical Experience: Using the tasks described at Paragraph 2: Project Information/Statement of Work, provide a description of relevant, recent projects, with clients, for which the team members provided a significant technical contribution. Additionally, indicate which projects the key personnel worked together as a Team. Work on these projects must have been in the last five years.
(c) Membership or certifications and accreditations: Provide a list of membership or certifications and accreditations for key personnel. Examples of these associations are the following: American College of Healthcare Executives (ACHE); The American Academy of Healthcare Interior Designers (AAHID); American College of Healthcare Architects (ACHA); American Society of Healthcare Engineers; Evidence-based Design Accreditation and Certification (EDAC) from CHD, Green Building Certification Institute (GBCI), International Facility Management Association (IFMA), National Council for Interior Design Qualification (NCIDQ); Planetree Visionary Design Network (VDN); U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED) Green Building Rating Systems.
II) Past Performance: Provide a minimum of three but no more than five examples of similar work for each task group listed within the Paragraph 2: Project information/Statement of Work, (except Task Group 3 - Technical Expertise/Studies - for which you may provide up to seven examples) completed in the past ten years (projects under construction may be included). Include as a minimum, a description of the work (including role played), the project size, cost, type of contract (e.g. task order) and duration. Additionally, provide a tabular listing of all excellent performance ratings and letters of commendation from both private and Government clients, including VA (designate your role: prime, consultant or joint venture partner). These ratings should include the following data: current client contacts, project due date, design completion date and final cost estimate compared to the contract award amount (note whether bid or negotiated). Interested firms must list on the SF 330, Part II, block 10, the type, amount and dates of all fees for relevant A/E Services awarded and negotiated with awards between 2006 and the present.
III) Firm's Professional Qualifications: The qualifications must demonstrate reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. Firms shall provide qualifications that are relevant and recent to the work within the Paragraph 2: Project information/Statement of Work Task Groups. In addition to this information, the firm shall provide the following:
(a) Current IDIQ Contracts and task orders issued to the firm including total capacity
(b) Sustainable design: Firms will be evaluated in terms of their knowledge and demonstrated experience in applying sustainability concepts through an integrated design approach and designing in accordance with the U. S. Green Building Council, Leadership in Energy and Environmental Design (LEED) Green Building Rating System. Identify examples indicating design team (including consultants) experience and concepts employed, LEED certification points anticipated and final LEED points awarded, and LEED certified professionals proposed for this contract.
(c) Volume: Volume of work previously awarded to the firm by the Department of Veterans Affairs. Interested firms must list in block 11 of the SF 330 the amount and dates of all VA fees for A/E Services awarded and negotiated with awards pending between 2006 and the present.
(d) Awards received by the firm
(e) Describe the firms' experience with specification writing software
(f) Describe the firm's experience with Building Information Modeling (BIM) in developing projects from its initial conception through completion of documentation.
IV) Location (Geographic Proximity): Successful firms will have a strong local presence in the CFM Central Region area of responsibility, and a history of local affiliations. Provide a list of relevant projects completed by the firm or joint venture partners and appropriate subcontractors in the areas of responsibility (Central Region) in the past five years (projects in construction can be included). Provide appropriate information on Part II of SF 330 for all Branch offices which may be supporting task orders issued under this contract.
V) Service Disabled Veteran Owned Small Business Participation: The Service Disabled Veteran Owned Small Business must include with the proposal, a summary of how the offeror plans to comply with performing at least 50% of the effort in accordance with VAAR 852.219-10(c)(1). This should include what key personnel, by discipline, are proposed to be employees of the firm, and those that may be provided by subcontractors. The 50% performance summary will be evaluated on the extent to which the proposal demonstrates conforming to the limitations in subcontracting (performing at least 50% of the project) in terms of the total value of the acquisition, including options and the realism of the proposal to meet the proposed performance.
VI) Capacity: The A/E shall demonstrate it has the necessary capacity to accomplish task order work required over the base year and any option years exercised. The A/E shall provide details of all of its current work (public/private) including the duration of the contracts, and how it anticipates on taking on additional work required by CFM.
4. SUBMISSION REQUIREMENTS: Interested sources are invited to respond to this announcement by providing two (2) CD's, one (1) original hard copy and five (5) hard copies of the submittal package including an original SF 330, Parts 1 and 2, for the prime and an SF 330 for each subcontracted consultant proposed. Please include the firm's DUNS, CAGE, and TIN numbers in Block 30 of the SF330. Provide evidence of the firm's capability to accomplish the work described within Section 2, Project Information/Statement of Work, Tasks 1 - 4. Provide information in response to Section 3, Selection Criteria. Demonstrate the firm's ability to accomplish multiple, large and small projects simultaneously; as such would be required under this IDIQ contract. Show the firm's ability to respond to multiple and varied assignments simultaneously in several states utilizing all the engineering disciplines required by the scope of work. Provide evidence that the firm is permitted by law to practice the professions of architecture or engineering, i.e., state registration number.
All respondents to this notice shall additionally include a narrative addressing their ability to adequately coordinate and accomplish all required engineering services for multiple projects described above in a multi-state area. In this narrative, the respondents shall identify specific expertise retained in-house and also services that would be subcontracted out.
The CDs and hard copy submittal package must be received not later than 2:00 p.m. Central Time on June 3, 2016. Submittals received after this date will be considered late. The NAICS Code is 541310 and the Size Standard is $7.5M. Offerors must be registered in the System for Award Management (SAM) and Vendor Information Pages (https://www.vip.vetbiz.gov/database) in order to participate in this procurement. Include contact name, phone number, fax number and email address on SF 330. Submit one (1) original, five (5) copies, and two (2) CD's.
Questions concerning submissions should be directed to Lara Lutz at lara.lutz@va.gov by May 23, 2016. Personal visits for the purpose of discussing this announcement are not permitted.
If documents are being hand delivered via postal services, or sent via a carrier the physical address is Department of Veterans Affairs, Office of Construction and Facilities Management, ATTN: Lara Lutz, 3001 Green Bay Road, Building 48, Room 215, North Chicago, IL 60064. Facsimile or electronic transmissions will not be accepted.
Submissions must be received no later than 2:00 p.m. Central Standard Time (CST) on June 3, 2016. Any submissions received after the stated time will be considered late.
Note 1: If the combining of two or more companies (joint venture (JV)) for the purpose of this requirement, then include each company's role under Part I, Item H of the SF 330. If the JV partners have never worked together on similar jobs, so indicate. The JV will be evaluated as one. The experience of each JV partner will be evaluated based on each partner's role in cited past projects and in the proposed JV role for this project. To identify the JV, provide the DUNS number for each entity and the JV entity. A signed letter of intent to form a JV shall accompany the SF330 submission. If the JV firm is rated as one of the most highly qualified, a signed JV agreement must be provided prior to negotiation. Failure to submit a signed copy of the JV agreement will result in the JV's submission being excluded from consideration for award.
Note 2: The firms will be ranked at the conclusion of the consensus rating. At that point the evaluation team will consider interviews with a minimum of five (5) of the most highly qualified firms. After the interviews, the evaluation team will provide the source selection authority a final ranking of the most highly qualified firms.
Note 3: If selected for this contract and if contractor has recent Defense Contract Audit Agency (DCAA) audit results supporting proposed overhead and G&A rates the contractor will be required to submit them. All sub-contractors not listed in the initial proposal must be approved by the Director of Project Delivery, Central Region prior to issuance of any task order.
Attachments
| File | Type | Posted |
|---|---|---|
| 36C10F18D3157-001.docx | DOCX document | |
| VA101F-17-D-2913-001.docx | DOCX document | |
| VA101F-17-D-2914-001.docx | DOCX document | |
| VA101F-17-D-2912-001.docx | DOCX document | |
| VA101F-17-D-2910-001.docx | DOCX document | |
| VA101F-17-D-2911-001.docx | DOCX document | |
| VA101F-17-D-2908-001.docx | DOCX document | |
| VA101F-17-D-2907-001.docx | DOCX document | |
| VA101F-17-D-2906-001.docx | DOCX document | |
| VA101F-17-D-2905-001.docx | DOCX document | |
| VA101F-17-D-2904-002.docx | DOCX document | |
| VA101F-17-D-2903-002.docx | DOCX document | |
| VA101-16-R-0042-004.docx | DOCX document | |
| VA101-16-R-0042-003.docx | DOCX document | |
| VA101-16-R-0042-002.docx | DOCX document | |
| VA101-16-R-0042-001.docx | DOCX document | |
| VA101-16-R-0042-000.docx | DOCX document |
Show all 17
Notice history
| Notice | Type | Posted |
|---|---|---|
| ALPHA TERRA Architect and Engineering Indefinite Delivery Indefinite Quantity Contract | Award Notice | |
| Award to anderson engineering architect and engineering indefinite quantity/ indefinite delivery contract for the CFM central region | Award Notice | |
| Health Facitilities Solutions Company - Architect and Engineering Indefinite Delivery Indefinite Quantity Contract | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity