Hammerhead Barracks Renovation, Fort Hood, TX
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9126G20R0017
- Agency
-
ENDIST Fort Worth
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Fort Hood Tx Usa
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation from the Department of the Army Corps of Engineers Fort Worth District seeks design-build services to renovate five existing Hammerhead Barracks and one Central Energy Plant at Fort Hood, Texas. The scope of work includes major renovations to roofs, exterior finishes, interiors, HVAC, plumbing and electrical systems. The evaluation will use a two-phase selection process to initially evaluate past performance and capabilities, then invite no more than five firms to submit full technical and price proposals, with award based on best value. Phase 1 proposals are due April 8, 2020 and award is scheduled for August 2020.
There is no set-aside designated for this procurement. The primary NAICS code is 236220 for commercial and institutional building construction, with a size standard of $39.5 million. The work must be completed within 800 calendar days of the notice to proceed and has an estimated value between $25-100 million. Performance will be at Fort Hood in Texas.
Notice text
3 versions
Update #3 · Latest ·
The following two (2) contractors were selected by the Government to enter into PHASE 2 for W9126G20R0017, Hammerhead Barracks Renovations in Fort Hood, Texas.
Guyco, Inc.
ATTN: William L. Crawford
P.O. Box 1030
Lampasas, Texas 76550
Whitesell-Green, Inc.
ATTN: W.K “Billy” Whitesell
3881 North Palafox Street
Pensacola, Florida 32505
This is the Phase 1 solicitation. Phase 1 proposals are due 08 April 2020.
CONTRACT INFORMATION: This announcement is an unrestricted acquisition to revitalize/renovate five existing Hammer Head Barracks (B10009, B10010, B10011, B10016, B10018) and One Central Energy Plant (CEP B10017) at Fort Hood, TX. The Contract will include both Design and Construction of the required renovations. The North American Industrial Classification System code is 236220, which has a size standard of $39.5 million. A firm-fixed-price contract will be negotiated. The contract is anticipated to be awarded in August 2020. To be eligible for contract award, a firm must be registered with the System for Award Management (SAM) database. Register via the SAM Internet site at https://www.sam.gov/. No state level certifications will be accepted.
PROJECT INFORMATION: Construction range is between $25,000,000 and $100,000,000. Five existing Hammer Head Barracks (B10009, B10010, B10011, B10016, B10018) and One Central Energy Plant (CEP B10017) will be renovated at Fort Hood, TX. Each barracks building is 3-Stories, a basement, and includes Company Operations Facilities that contain two arms vaults and chemical room (Gas Mask and similar equipment). Renovations will include: Standing Seam Metal Roofs, Exterior Finishes/EIFS, Interior Finishes(Walls/Ceilings/Floors), New Barracks Floor Plans (2 Bedrooms, 1 Kitchen, 1 Common Area, and 1 Bathroom), New HVAC Systems (Chillers and Cooling Towers for CEP, DOAS, Hydronic Boilers, Fan Coil Units), Plumbing Systems, Fire Protection Systems, Lighting & Electrical Systems, Telecommunication Systems, and Site Improvements (Drainage, Roadway/Sidewalk Upgrades, Utility Upgrades: Electrical, Sanitary Sewer, Domestic Water, and Natural Gas). There are no LEED requirements.
This solicitation will be evaluated under the Two-Phase Design Build Process in accordance with FAR 36.3-Two-Phase Design-Build Selection Procedures. In Phase 1, interested firms or joint venture entities (referred to as "Offerors") will submit a proposal demonstrating their past performance and capability to successfully execute this requirement. The Government will evaluate the performance capacity in accordance with the criteria described in the Phase 1 solicitation and intends to select no more than five (5) of the Phase 1 offerors to compete in Phase 2. In Phase 2, the selected offerors will submit a technical proposal and a price proposal. The Government will evaluate the Phase 2 proposals, in accordance with the criteria described for Phase 2 in the solicitation, and award the contract to the responsible offeror, whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall “best value” to the Government, considering all technical and non-technical factors including cost or price identified under Phases 1 and 2.
3. SUBMISSION INFORMATION:
After solicitation issuance, contractors may view and or download this solicitation, specifications and all amendments at the following internet addresses: beta.sam website (https://beta.sam.gov). Type in the search box the solicitation number W9126G20R0017. The use of the websites requires prior registration. Plans and specifications will NOT be made available in paper format or on compact disc. It is the Offerors responsibility to monitor the beta.sam.gov website and or any other official government website for amendments to the solicitation. You must be registered with the SAM, to receive a Government contract award. Phase1 proposals are anticipated to be due in February 2020. If the Government elects to conduct a pre-proposal conference and site visit for Phase 2, it will be conducted after the Phase 2 selection has been made.
The Primary Point of Contract for this project is Paige Stone, Contract Specialist, email is paige.e.stone@usace.army.mil. All questions MUST be received through projnet for record. The Government reserves the right to use only the Internet as notification of any amendments to this solicitation. It is the offerors responsibility to view the websites daily for amendments to the solicitation. Accordingly, prospective contractors may view and/or download the solicitation and all amendments from the beta.sam.gov address after solicitation issuance. Contractors shall register themselves at this website under the solicitation number to receive a copy of the solicitation.
Update #2 ·
The following two (2) contractors were selected by the Government to enter into PHASE 2 for W9126G20R0017, Hammerhead Barracks Renovations in Fort Hood, Texas.
The Korte Company
Attn: Ms. Todd Korte
5700 Oakland Avenue, Suite 275
St. Louis, MO 63110
AMERESCO
Attn: Ms. Nicole Bulgarino
7929 Brookriver Drive
Dallas, TX 75247
This is the Phase 1 solicitation. Phase 1 proposals are due 08 April 2020.
CONTRACT INFORMATION: This announcement is an unrestricted acquisition to revitalize/renovate five existing Hammer Head Barracks (B10009, B10010, B10011, B10016, B10018) and One Central Energy Plant (CEP B10017) at Fort Hood, TX. The Contract will include both Design and Construction of the required renovations. The North American Industrial Classification System code is 236220, which has a size standard of $39.5 million. A firm-fixed-price contract will be negotiated. The contract is anticipated to be awarded in August 2020. To be eligible for contract award, a firm must be registered with the System for Award Management (SAM) database. Register via the SAM Internet site at https://www.sam.gov/. No state level certifications will be accepted.
PROJECT INFORMATION: Construction range is between $25,000,000 and $100,000,000. Five existing Hammer Head Barracks (B10009, B10010, B10011, B10016, B10018) and One Central Energy Plant (CEP B10017) will be renovated at Fort Hood, TX. Each barracks building is 3-Stories, a basement, and includes Company Operations Facilities that contain two arms vaults and chemical room (Gas Mask and similar equipment). Renovations will include: Standing Seam Metal Roofs, Exterior Finishes/EIFS, Interior Finishes(Walls/Ceilings/Floors), New Barracks Floor Plans (2 Bedrooms, 1 Kitchen, 1 Common Area, and 1 Bathroom), New HVAC Systems (Chillers and Cooling Towers for CEP, DOAS, Hydronic Boilers, Fan Coil Units), Plumbing Systems, Fire Protection Systems, Lighting & Electrical Systems, Telecommunication Systems, and Site Improvements (Drainage, Roadway/Sidewalk Upgrades, Utility Upgrades: Electrical, Sanitary Sewer, Domestic Water, and Natural Gas). There are no LEED requirements.
This solicitation will be evaluated under the Two-Phase Design Build Process in accordance with FAR 36.3-Two-Phase Design-Build Selection Procedures. In Phase 1, interested firms or joint venture entities (referred to as "Offerors") will submit a proposal demonstrating their past performance and capability to successfully execute this requirement. The Government will evaluate the performance capacity in accordance with the criteria described in the Phase 1 solicitation and intends to select no more than five (5) of the Phase 1 offerors to compete in Phase 2. In Phase 2, the selected offerors will submit a technical proposal and a price proposal. The Government will evaluate the Phase 2 proposals, in accordance with the criteria described for Phase 2 in the solicitation, and award the contract to the responsible offeror, whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall “best value” to the Government, considering all technical and non-technical factors including cost or price identified under Phases 1 and 2.
3. SUBMISSION INFORMATION:
After solicitation issuance, contractors may view and or download this solicitation, specifications and all amendments at the following internet addresses: beta.sam website (https://beta.sam.gov). Type in the search box the solicitation number W9126G20R0017. The use of the websites requires prior registration. Plans and specifications will NOT be made available in paper format or on compact disc. It is the Offerors responsibility to monitor the beta.sam.gov website and or any other official government website for amendments to the solicitation. You must be registered with the SAM, to receive a Government contract award. Phase1 proposals are anticipated to be due in February 2020. If the Government elects to conduct a pre-proposal conference and site visit for Phase 2, it will be conducted after the Phase 2 selection has been made.
The Primary Point of Contract for this project is Paige Stone, Contract Specialist, email is paige.e.stone@usace.army.mil. All questions MUST be received through projnet for record. The Government reserves the right to use only the Internet as notification of any amendments to this solicitation. It is the offerors responsibility to view the websites daily for amendments to the solicitation. Accordingly, prospective contractors may view and/or download the solicitation and all amendments from the beta.sam.gov address after solicitation issuance. Contractors shall register themselves at this website under the solicitation number to receive a copy of the solicitation.
Update #1 ·
This is the Phase 1 solicitation. Phase 1 proposals are due 08 April 2020.
CONTRACT INFORMATION: This announcement is an unrestricted acquisition to revitalize/renovate five existing Hammer Head Barracks (B10009, B10010, B10011, B10016, B10018) and One Central Energy Plant (CEP B10017) at Fort Hood, TX. The Contract will include both Design and Construction of the required renovations. The North American Industrial Classification System code is 236220, which has a size standard of $39.5 million. A firm-fixed-price contract will be negotiated. The contract is anticipated to be awarded in August 2020. To be eligible for contract award, a firm must be registered with the System for Award Management (SAM) database. Register via the SAM Internet site at https://www.sam.gov/. No state level certifications will be accepted.
PROJECT INFORMATION: Construction range is between $25,000,000 and $100,000,000. Five existing Hammer Head Barracks (B10009, B10010, B10011, B10016, B10018) and One Central Energy Plant (CEP B10017) will be renovated at Fort Hood, TX. Each barracks building is 3-Stories, a basement, and includes Company Operations Facilities that contain two arms vaults and chemical room (Gas Mask and similar equipment). Renovations will include: Standing Seam Metal Roofs, Exterior Finishes/EIFS, Interior Finishes(Walls/Ceilings/Floors), New Barracks Floor Plans (2 Bedrooms, 1 Kitchen, 1 Common Area, and 1 Bathroom), New HVAC Systems (Chillers and Cooling Towers for CEP, DOAS, Hydronic Boilers, Fan Coil Units), Plumbing Systems, Fire Protection Systems, Lighting & Electrical Systems, Telecommunication Systems, and Site Improvements (Drainage, Roadway/Sidewalk Upgrades, Utility Upgrades: Electrical, Sanitary Sewer, Domestic Water, and Natural Gas). There are no LEED requirements.
This solicitation will be evaluated under the Two-Phase Design Build Process in accordance with FAR 36.3-Two-Phase Design-Build Selection Procedures. In Phase 1, interested firms or joint venture entities (referred to as "Offerors") will submit a proposal demonstrating their past performance and capability to successfully execute this requirement. The Government will evaluate the performance capacity in accordance with the criteria described in the Phase 1 solicitation and intends to select no more than five (5) of the Phase 1 offerors to compete in Phase 2. In Phase 2, the selected offerors will submit a technical proposal and a price proposal. The Government will evaluate the Phase 2 proposals, in accordance with the criteria described for Phase 2 in the solicitation, and award the contract to the responsible offeror, whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall “best value” to the Government, considering all technical and non-technical factors including cost or price identified under Phases 1 and 2.
3. SUBMISSION INFORMATION:
After solicitation issuance, contractors may view and or download this solicitation, specifications and all amendments at the following internet addresses: beta.sam website (https://beta.sam.gov). Type in the search box the solicitation number W9126G20R0017. The use of the websites requires prior registration. Plans and specifications will NOT be made available in paper format or on compact disc. It is the Offerors responsibility to monitor the beta.sam.gov website and or any other official government website for amendments to the solicitation. You must be registered with the SAM, to receive a Government contract award. Phase1 proposals are anticipated to be due in February 2020. If the Government elects to conduct a pre-proposal conference and site visit for Phase 2, it will be conducted after the Phase 2 selection has been made.
The Primary Point of Contract for this project is Paige Stone, Contract Specialist, email is paige.e.stone@usace.army.mil. All questions MUST be received through projnet for record. The Government reserves the right to use only the Internet as notification of any amendments to this solicitation. It is the offerors responsibility to view the websites daily for amendments to the solicitation. Accordingly, prospective contractors may view and/or download the solicitation and all amendments from the beta.sam.gov address after solicitation issuance. Contractors shall register themselves at this website under the solicitation number to receive a copy of the solicitation.
Files
| File | Type | Posted |
|---|---|---|
| B3_ W9126G20R0017.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Hammerhead Barracks Renovation, Fort Hood, TX | Award Notice | |
| This notice | Solicitation | |
| Hammerhead Barracks Renovation, Fort Hood, TX | Pre-Solicitation | |
| Hammerhead Barracks Renovation at Fort Hood, TX | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Unaccompanied Enlisted Personnel Housing (UEPH) Barracks# 103 | ENDIST Fort Worth | No set-aside | |
| Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX | ENDIST Louisville | Total Small Business | |
| RFI: Fort Wolters H Barracks | ENDIST Fort Worth | No set-aside | |
| Joint base lewis mcchord multi domain task force buildings 3223-3224, washington | ENDIST Seattle | Total Small Business | |
| Sources Sought- Sources Sought & Other Transaction Authority (OTA) Construction for Non-Destructive Testing Facility, Red River Army Depot, Texas | ENDIST Fort Worth | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity