Gunston A6A1 RCC 79N
Awarded Limited / Sole Source Justification Posted
- Solicitation number
- N50054-26-057
- Agency
-
Naval Sea Systems Command
Department of the Navy, Department of Defense
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- N0002422D4408-N5005426FL001 Federal contract award
- NAICS code
- 336611 Ship Building and Repairing
- PSC
- J998 Non-Nuclear Ship Repair (East)
- Place of performance
- Norfolk, Virginia 23511, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Sea Systems Command issued a Limited/Sole Source Justification Notice on April 17, 2026, for critical lagging and insulation repair work on the USS GUNSTON HALL (LSD-44) under Request for Contract Changes (RCC) 79N Work Item 508-11-001. The work encompasses removal and replacement of overhead insulation, cleaning, painting, replacement of clips and insulation materials, and related repairs in Enclosed Operating Station One, 5-65-2-E, necessary to ensure safe and proper equipment operation. The justification for sole-source procurement to East Coast Repair and Fabrication was based on urgent agency need that would result in unacceptable delays if full and open competition were pursued, with the contracting officer determining that this vendor is the only company possessing the required equipment and capability to meet immediate requirements while maintaining integration with the existing Continuous Maintenance Availability work package and supporting Key Event Work Complete milestones. The delivery order (Order No. N5005426FL001) was awarded to East Coast Repair and Fabrication on April 16, 2026, though the specific award amount was not disclosed in the notice. The statutory authority for this non-competitive procurement is FAR 16.505(b)(2)(i)(A), and the contracting officer determined costs as fair and reasonable based on historical data, an Independent Government Estimate, and Project Manager technical knowledge of estimated man hours and material costs.
Notice text
The additional work required for the USS GUNSTON HALL (LSD-44) includes critical support identified in the following Request for Contract Changes (RCC) 79N Work Item 508-11-001 Lagging and Insulation; repair.
Awarded contract N0002422D4408 to unknown vendor for unknown amount on 2026-04-16.
Files
| File | Type | Posted |
|---|---|---|
| RCC 79N JA Redacted.pdf |