Guam CBOC Handyman services 36C26123Q0296 Amendment 0001

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C26123Q0296
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
561210 Facilities Support Services
Place of performance
Guam Guam

Notice details come from SAM.gov. Updated .

Notice text

Contractor shall provide all supplies, personnel, equipment, tools, materials, supervision, and other items or services necessary for the maintenance and repair of buildings and structures and related systems and equipment as defined in this scope.

1.2. Maintenance and repair services shall include but not be limited to the following: 

1.2.1:  Carpentry/Painting – touch-up painting, patching wall, painting, carpet replacement and flooring work.  20 hours.

1.2.2:  Plumbing – water heaters, sinks, toilets, urinals, faucets, showers, drinking fountains, and fire sprinkler head.  20 hours.

1.2.3:  Electrical – troubleshooting electrical outages such as dead circuits, data lines and analog lines.  Additional work is installing outlets, switches, circuit breaker, lighting fixtures, faceplates, receptacles, light bulbs, lamps, data lines (CAT 5 or CAT 6) and analog lines.  Note:  Contractor to install data port on wall and pull network cable to IT closet.  Contractor will not connect network cable to any patch panel.  20 hours.

1.2.4:  Heating, Ventilation and Air Conditioning – HVAC equipment, refrigeration equipment, blowers, compressors, motors, dampers, condensers, cooling coils, pumps, duct work, air filters, heating units, air handler units, motors, belts, greasing of bearing, cleaning of coils, checking pressures, clear all drain lines of debris, ensure drain are draining properly.  20 hours.

1.2.5:  Life Safety Equipment – technician shall perform maintenance on exit signs, emergency lights, service fire extinguisher, strobe lights, annunciator and pull station/code blue.  20 hours.

1.2.6:  Asbestos and mold – testing for both asbestos and mold.  Removal of asbestos and mold remediation as needed.  10 hours.

1.2.7:  Locksmith – rekey, replace door hardware, and unlock doors.  10 hours.

1.2.8:  Additional maintenance to include bi-annually pressure washing parking, sidewalk, building and entry signage.  20 hours.

Files

File Type Posted
36C26123Q0296 0001.pdf PDF
WD 15-5693.txt TXT text file
36C26123Q0296 RFQ.pdf PDF

Notice history

Notice Type Posted
J049--Guam CBOC Handyman Award Award Notice
This notice Latest solicitation Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors