*** UPDATE 8 June 2023 ***

The abstract for this solicitation has been posted under the attachments section. Based on the results of the bid opening the contract is currently not awardable in accordance with 33 U.S.C. 624. In accordance with FAR 14.404-1(f) notice is herby given that the contracting officer has established a competitive range and intends to conduct negotiations with the firms that submitted bids without issuing a new solicitation. Award will be made to the responsible bidder offering the lowest evaluated price.

***  UPDATE 5 June 2023 ***

Amendment 0001 is attached along with a wage determination. The wage determination originally included was for Lane County. It has been changed to Linn County.  Be sure to acknowledge this amendment in your bid submissions.

*** UPDATE 31 May 2023 ***

A site visit was conducted on 24 May 2023. The attendance list can be found in the attached documents. Questions at the site visit were directed to be submitted through ProjNet as instructed in the solicitation.

***

The U.S. Army Corps of Engineers, Portland District, has a requirement for the Green Peter Injunction Deep Drawdown Temporary Power Supply Project. The Scope of Work for this project is to perform ground/wall penetrating radar and core drill through the powerhouse floor and walls. The contractor is to procure and install new generator connection and junction boxes along with conduits and cables/conductors necessary for a 250kW diesel-engine generator to connect to the powerhouse station service at SQ Switchgear (see drawing screen shot below). The contractor will also procure and install new control devices at the existing SQ Switchgear to have the ability to auto-start, shut down, and provide status indication to the powerhouse’s SCADA and local LED systems.

Update #3 ·

***  UPDATE 5 June 2023 ***

Amendment 0001 is attached along with a wage determination. The wage determination originally included was for Lane County. It has been changed to Linn County.  Be sure to acknowledge this amendment in your bid submissions.

*** UPDATE 31 May 2023 ***

A site visit was conducted on 24 May 2023. The attendance list can be found in the attached documents. Questions at the site visit were directed to be submitted through ProjNet as instructed in the solicitation.

***

The U.S. Army Corps of Engineers, Portland District, has a requirement for the Green Peter Injunction Deep Drawdown Temporary Power Supply Project. The Scope of Work for this project is to perform ground/wall penetrating radar and core drill through the powerhouse floor and walls. The contractor is to procure and install new generator connection and junction boxes along with conduits and cables/conductors necessary for a 250kW diesel-engine generator to connect to the powerhouse station service at SQ Switchgear (see drawing screen shot below). The contractor will also procure and install new control devices at the existing SQ Switchgear to have the ability to auto-start, shut down, and provide status indication to the powerhouse’s SCADA and local LED systems.

Update #2 ·

*** UPDATE 31 May 2023 ***

A site visit was conducted on 24 May 2023. The attendance list can be found in the attached documents. Questions at the site visit were directed to be submitted through ProjNet as instructed in the solicitation.

***

The U.S. Army Corps of Engineers, Portland District, has a requirement for the Green Peter Injunction Deep Drawdown Temporary Power Supply Project. The Scope of Work for this project is to perform ground/wall penetrating radar and core drill through the powerhouse floor and walls. The contractor is to procure and install new generator connection and junction boxes along with conduits and cables/conductors necessary for a 250kW diesel-engine generator to connect to the powerhouse station service at SQ Switchgear (see drawing screen shot below). The contractor will also procure and install new control devices at the existing SQ Switchgear to have the ability to auto-start, shut down, and provide status indication to the powerhouse’s SCADA and local LED systems.

Update #1 ·

The U.S. Army Corps of Engineers, Portland District, has a requirement for the Green Peter Injunction Deep Drawdown Temporary Power Supply Project. The Scope of Work for this project is to perform ground/wall penetrating radar and core drill through the powerhouse floor and walls. The contractor is to procure and install new generator connection and junction boxes along with conduits and cables/conductors necessary for a 250kW diesel-engine generator to connect to the powerhouse station service at SQ Switchgear (see drawing screen shot below). The contractor will also procure and install new control devices at the existing SQ Switchgear to have the ability to auto-start, shut down, and provide status indication to the powerhouse’s SCADA and local LED systems.

Files

Notice history

Notice Type Posted
GPR Injunction Deep Drawdown Temporary Power Supply Construction Award Award Notice
This notice Latest solicitation Solicitation
Green Peter Injunction Deep Drawdown Temporary Power Supply Pre-Solicitation
Green Peter Temporary Power Supply Construction Project Pre-Solicitation
Green Peter Injunction Deep Drawdown Temporary Power Supply Original Pre-Solicitation